ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 7 of 12  Not logged in ELOG logo
Entry  Sat Mar 4 00:34:46 2023, Julian, Update, General, Cleanroom Update 
Entry  Mon Mar 6 15:32:58 2023, Jon, Infrastructure, General, Cabinet installation completed IMG_0088.jpgIMG_0089.jpg
Entry  Mon Mar 6 18:48:43 2023, Pamella, Update, General, Cleanroom update  203863E0-106A-465E-8D9C-461B0358FB60.jpeg779F360D-CAD0-4C49-AE0B-973F97F6D099.jpeg276B9F0C-6661-441F-AD34-D79DA61E1FC3.jpeg
Entry  Wed Mar 8 19:29:00 2023, Aiden, Summary, General, Clean and Bake batch 7 IMG_4180.jpgIMG_4182.jpg
Entry  Thu Mar 9 13:51:42 2023, Shane, Update, General, Clean room counts 3/9/23 particlecounts3.9.23.pdfclean_room_zones.JPG
Entry  Tue Mar 14 18:21:41 2023, Aiden, Summary, General, Clean and Bake batch 8 
Entry  Fri Mar 17 19:46:39 2023, Aiden, Summary, General, Clean and Bake batch 9 IMG-4208.jpgIMG-4209.jpg
Entry  Wed Mar 22 15:25:00 2023, Shane, Update, General, Clean room recertification particle counts  counts3.22.23.pdf
Entry  Thu Mar 23 18:40:08 2023, Julian, Update, General, Cleanroom Update 
Entry  Fri Mar 24 13:36:17 2023, Pamella, Update, General, Clean and Bake batch 10 260AEB73-02D0-4635-93B3-B2EB3269FB84.jpeg59FD199A-A444-439A-8D51-C242B65BBECD.jpeg9A48A0EE-5EFE-409D-ACC0-17011F6F7EBF.jpeg950F85B7-D304-4724-AB3D-B606E422F1E3.jpeg
Entry  Fri Mar 31 14:23:13 2023, Pamella, Update, General, Clean and bake batch 11 4AC705B8-D906-47E3-86E4-49E4967910E7.jpeg
Entry  Mon Apr 3 17:04:05 2023, Aiden, Summary, General, IDP Scroll Pump Assembly IMG_4244.jpg
Entry  Fri Apr 7 09:48:09 2023, Pamella, Update, General, Clean the system parts 7x
Entry  Tue Apr 11 17:56:15 2023, Pamella, Update, General, Lab cleaning  
Entry  Wed Apr 12 10:53:02 2023, Aiden, Summary, General, Valve Cleaning 
Entry  Wed Apr 12 16:17:50 2023, shane, Update, General, Particle Counter moved IMG_6693.HEIC
Entry  Mon Apr 17 17:06:49 2023, Aiden, Summary, General, Clean and Bake batch 11 IMG_4262.jpg
Entry  Fri Apr 21 16:51:26 2023, Pamella, Update, General, Cleaning cables. IMG_5416.jpeg
Entry  Mon Apr 24 17:38:45 2023, Aiden, Summary, General, Clean and Bake Batch 12 IMG_4269.jpgIMG_4268.jpg
Entry  Thu Apr 27 09:48:34 2023, Aiden, Summary, General, Batch 12 Bagging IMG_4279.jpgIMG_4278.jpg
    Reply  Fri Apr 28 19:39:19 2023, Cao, Summary, General, Clean and Bake Leybold TTR 91 Pirani Gauge 
Entry  Mon May 8 12:00:03 2023, Pamella, Shane, Julian, Update, General, Cleanroom particle counts and cleaning the cleanroom. 
Entry  Wed May 10 10:49:34 2023, Aiden, Update, General, RGA Software 
Entry  Wed May 17 12:18:08 2023, Pamella, Julian and Shane , Update, General, Cleaning room and particle count 
Entry  Wed May 31 11:42:16 2023, Pamella, Julian and Shane, Update, General, Cleaning room and particle count 
Entry  Wed May 31 16:18:41 2023, Aiden, Summary, General, Mock FROSTI IMG_4394.jpg
Entry  Tue Jun 6 16:04:46 2023, Aiden, Update, General, Water 
Entry  Mon Jun 12 18:52:00 2023, Pamella, Update, General, Heater system parts - Wiped and bagged heater_equipment_wiped.jpg
Entry  Tue Jun 13 10:28:50 2023, Pamella, Update, General, Wiped and bagged the heating and cords. heater_cords_wiped.jpg
Entry  Tue Jun 13 21:33:46 2023, Pamella, Update, General, New cabinet for PPI 
Entry  Thu Jul 13 15:31:21 2023, Jon, Update, General, Ant traps placed around lab 
    Reply  Thu Jul 13 16:59:03 2023, Jon, Update, General, Ant traps placed around lab 
Entry  Sun Jul 16 15:21:56 2023, Pamella, Update, General, General update about some problems in the lab. IMG_8637.jpgIMG_8633.jpgIMG_8631.jpg
Entry  Wed Aug 9 11:32:56 2023, Jon, Infrastructure, General, New power cables IMG_0299.jpg
Entry  Tue Aug 29 22:07:38 2023, Aiden, Update, General, Electronic Bench IMG_4632.jpg
Entry  Tue Sep 5 16:43:19 2023, Aiden, Update, General, VAC System Heating Update 
Entry  Wed Nov 8 17:55:49 2023, Jon, Update, General, Lab Clean-Up Day 1 
Entry  Tue Nov 21 22:09:44 2023, Aiden, Update, General, Testing Parts 8x
    Reply  Sat Dec 9 12:34:12 2023, Jon, Update, General, Electronics workshop migrated to 1129 IMG_0765.jpgIMG_0767.jpeg
Entry  Mon Jan 8 20:24:53 2024, Aiden, Update, General,  IMG_4888.jpgIMG_4886.jpgIMG_4887.jpg
Entry  Mon Jan 15 22:29:34 2024, Jon, Infrastructure, General, Cabinet installation & lab clean-up completed 1129.png1119.png
Entry  Wed Jan 17 15:47:49 2024, Aiden, Update, General, Resistors for Heater Elements 
    Reply  Tue Feb 20 08:01:30 2024, Jon, Infrastructure, General, Power and network equipment installed in 1129 rack IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg
Entry  Tue Feb 20 18:08:24 2024, Aiden, Update, General, Degassing the RGA bake11_240220_Elements_postdegas_ArO.pngbake11_240220_Elements_predegas_ArO.png
Entry  Mon Feb 26 15:15:39 2024, Aiden, Update, General, Vacuum Chamber Baking Update 
    Reply  Wed Feb 28 12:02:08 2024, Tyler, Update, General, Resistors for Heater Elements Update 
Entry  Sun Mar 24 11:49:27 2024, Aiden, Update, General, FROSTI RGA Scan bake13_240324_FROSTI_ArC.pngbake13_240324_FROSTI_ArO.png
Entry  Mon Jun 17 11:47:46 2024, Liu, Infrastructure, General, Temporary cooling units for the labs 1119.jpg1129.jpg
Entry  Thu Jul 11 21:01:37 2024, Jon, Infrastructure, General, Cable tray installed in 1129 IMG_1395.pngIMG_1396.png
Entry  Sat Jul 13 15:09:04 2024, Luke, Update, General, Ring heater COMSL model update image_2024-07-13_150654436.pngimage_2024-07-13_150704735.pngimage_2024-07-13_150716079.pngimage_2024-07-13_150726593.png
ELOG V3.1.3-7933898