ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 5 of 15  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Mon Jul 8 17:01:45 2024, Shane, Update, CDS, New CyMAC internal layout updated_cymac.jpeg
Entry  Tue Jul 9 18:19:50 2024, Shane, Update, CDS, ADC-DAC loopback testing and IOLAN installation iolanServerTerminal.jpegADC-DAC_Loopback_Testing.xlsxupdatedc1msc.jpeg
    Reply  Tue Jul 16 18:43:07 2024, Shane, Update, CDS, ADC-DAC loopback testing and IOLAN installation Follow-up_ADC-DAC_Loopback_Testing.xlsx
Entry  Fri Aug 2 13:50:22 2024, Shane, Update, CDS, Serial Comm. Test (Agilent Turbo Pump) pinouts.jpeg
Entry  Tue Oct 1 19:41:23 2024, Shane, Update, CDS, CyMAC Timing Chassis Issue IMG_5917.jpegIMG_5803.jpegIMG_5804.jpeg
Entry  Thu Oct 3 19:35:04 2024, Shane, Update, Cleanroom, Cleanroom cleaning and particle count 
Entry  Thu Oct 17 13:24:23 2024, Shane, Update, CDS, Timing Chassis issue identified IMG_6462.jpegIMG_6464.jpeg
Entry  Fri Oct 25 10:56:30 2024, Shane, Update, CDS, Timing Chassis fixed and reinstalled successful_timing.jpeg
Entry  Thu Nov 14 11:58:05 2024, Shane, Update, CDS, Turbo pump connection troubleshooting 
Entry  Wed Dec 4 16:01:23 2024, Shane, Update, CDS, Vac serial interfacing troubleshooting update 
Entry  Wed Feb 19 13:44:48 2025, Shane, Update, CDS, Vac serial interfacing update 
Entry  Thu Feb 27 18:22:21 2025, Shane, Update, CDS, Ongoing work in server rack and desk area (1119) 
Entry  Tue Mar 4 10:47:03 2025, Shane, Update, CDS, Vac system pinouts vac_pinouts_1.jpegvac_pinouts_2.jpeg
Entry  Wed Mar 5 12:16:28 2025, Shane, Update, CDS, Vac system communications update 
Entry  Wed Mar 5 18:13:20 2025, Shane, Update, CDS, vac system comms 
Entry  Mon Mar 10 17:03:52 2025, Shane, Update, CDS, Pressure Gauge successful connect 
Entry  Wed Apr 30 13:42:45 2025, Shane, Update, CDS, UPS comms successful 
Entry  Sun Apr 10 15:39:49 2022, Rutuja Gurav, HowTo, Computer Scripts/Programs, HowTo: Renew the Let's Encrypt SSL certificate using certbot 
Entry  Tue Sep 1 11:50:44 2026, Ruaraidh Dumbreck, Update, TCS, COMSOL modeling for the ring heater WithRH2D.pngWithRH3D.png
Entry  Thu Sep 3 10:14:21 2026, Ruaraidh Dumbreck, Update, TCS, COMSOL modeling for the ring heater + Shield 1d.png3d.png2d.png
Entry  Thu Sep 10 10:45:52 2026, Ruaraidh Dumbreck, Update, TCS, COMSOL modeling for the ring heater plot_3.pngplot_2.pngplot_1.png
Entry  Thu Sep 17 11:52:48 2026, Ruaraidh Dumbreck, Update, TCS, COMSOL modeling for the ring heater preliminary run 6x
Entry  Thu Sep 24 14:00:51 2026, Ruaraidh Dumbreck, Update, TCS, debugging and troubleshooting Screenshot_2026-09-24_134753.pngScreenshot_2026-09-24_135028.pngScreenshot_2026-09-24_135315.png
Entry  Thu Oct 1 13:04:03 2026, Ruaraidh Dumbreck, Update, TCS, COMSOL Shield modeling (My model scaled to PRL model parmeters) self.pngRH.pngPRL_self_HR.png
Entry  Tue Feb 13 13:02:41 2024, Pooyan, Update, Interferometer Simulations, Cacity sacn of Fabry-Perot  IFOSim_update_2_13_24.pdf
Entry  Wed Mar 27 00:03:57 2024, Pooyan, Update, Computers, Chimay relocation to Physics 1129 Chima_front.jpgChimay_back.jpg
Entry  Mon Apr 8 14:43:29 2024, Pooyan, Update, Interferometer Simulations, SIS update single and coupled cavities IFOSim_SIS__update_4_8_24.pdfScreen_Recording_2024-03-31_at_2.46.29_AM.mov
Entry  Mon Jun 24 21:38:25 2024, Pooyan, Infrastructure, Computers, Computer server changes in 1119 and 1129 IMG_6889.jpgIMG_6890.jpg
Entry  Mon Jul 15 14:28:32 2024, Pooyan, Update, Interferometer Simulations, aLIGO test mass surface profiles  
Entry  Mon Jul 15 14:49:06 2024, Pooyan, Update, Computers, Synology NAS server setup 
Entry  Mon Sep 9 14:27:36 2024, Pooyan, Infrastructure, Computers, Chimay backup attempt 
Entry  Tue Jun 3 11:50:08 2025, Pooyan, Update, CDS, CDS update 
Entry  Tue Jun 10 12:11:14 2025, Pooyan, Update, CDS, CDS update 
Entry  Wed Jun 11 16:19:37 2025, Pooyan, Update, CDS, CDS update Screenshot_20250611_154834.pngf3k.pdf
Entry  Wed Jun 11 16:33:45 2025, Pooyan, Update, Computers, Luke's ray tracing hosting 
Entry  Tue Aug 19 12:33:59 2025, Pooyan, Update, TCS, A# BS Update A#_beamsplitter_thermal_lensing.pdf
    Reply  Thu Jan 22 13:18:12 2026, Pooyan, Infrastructure, General, Lab floor plans 
Entry  Thu Mar 5 12:08:47 2026, Pooyan, Infrastructure, Cleanroom, Cleanroom HEPA fan defect Screenshot_2026-03-05_at_10-52-30_WhisperFlow-Product-Data-and-Submittals-1788-50-Rev19.pdf.pngIMG_5591.jpeg2704.jpg2705.jpg2706.jpg
Entry  Wed Mar 11 19:38:21 2026, Pooyan, Infrastructure, Cleanroom, Parts and things to get after the cleanroom move 8x
Entry  Sun Apr 19 15:22:08 2026, Pooyan, Infrastructure, Cleanroom, HEPA fan air flow measurment 
Entry  Sun May 3 21:13:14 2026, Pooyan, Infrastructure, Cleanroom, Cleanroom HEPA fan install 1119.pdf
Entry  Tue Jul 21 17:58:36 2026, Pooyan, Update, CDS, Cymac DAQ channel add for long-term recording Screenshot_20260721_193849.png
Entry  Mon Aug 3 12:23:03 2026, Pooyan, Infrastructure, CDS, Cymac backup schedule 
Entry  Wed Aug 17 16:04:30 2022, Phoebe Zyla, Summary, Lore, Testing the Cartridge Heater and Collecting FLIR Data Screenshot_(74).pngScreenshot_(75).pngScreenshot_from_2022-08-15_11-24-40.pngAcquisitionImage(Aug-15-2022_14_16).jpg
Entry  Fri Jul 22 13:20:28 2022, Phoebe, Update, , Comsol 
Entry  Mon Jan 23 17:26:15 2023, Peter Carney, Update, General, Oven cleaning 
Entry  Sat Feb 4 17:01:03 2023, Peter, Update, VLC Electronics, Laser Data OmegaX_M2_Fit_3.pngOmegaY_M2_Fit_3.png
Entry  Tue Feb 28 19:31:05 2023, Peter, Update, VLC Electronics, 532 M2 Measurements X_width_and_Y_width.png
Entry  Tue Feb 28 19:33:51 2023, Peter, Update, , 532 M2 Measurements 
Entry  Thu Mar 9 12:03:59 2023, Peter, Update, VLC Electronics, 532 M2 Measurements OmegaY_M2_Fit_3.pngOmegaX_M2_Fit_3.pngoptical_setup.jpg
ELOG V3.1.3-7933898