Message ID: 691     Entry time: Wed Mar 11 19:38:21 2026
Author: Pooyan 
Type: Infrastructure 
Category: Cleanroom 
Subject: Parts and things to get after the cleanroom move 
  • concrete Caulk to fill the drill holes in 1119
    • Example [Pooyan: I have a caulk gun and silicon caulk at home, if needed.]
  • Water hose for the washer in 1125
    • 1/2" diameter
    • almost 8 Ft 
  • Exhaust for the oven in 1125
    • Question: not sure which way we want the exhaust to go. Measurements depend on the path. 
  • Rubber vibration dampers for the cleanroom fans
    • 2.5 cm diameter, 1.5 cm height
    • Example (not the exact size. Should also double check the broken ones and make sure that both sides are male)
  • Cabling conduit from the cable tray to the optical table frame (through the cleanroom ceiling)
  • Wire cable tray for 1125
    • ~10 Ft, exactly similar to the one already installed in 1129
Attachment 1: photo_2026-03-12_10-33-02.jpg  167 kB  Uploaded Thu Mar 12 11:33:29 2026  | Hide | Hide all
photo_2026-03-12_10-33-02.jpg
Attachment 2: photo_2026-03-12_10-32-57.jpg  177 kB  Uploaded Thu Mar 12 11:33:40 2026  | Hide | Hide all
photo_2026-03-12_10-32-57.jpg
ELOG V3.1.3-7933898