|
ligo-ex
ligo-ds
|
| Richardson Lab Experimental Log |
Not logged in |
 |
|
|
Message ID: 691
Entry time: Wed Mar 11 19:38:21 2026
|
| Author: |
Pooyan |
| Type: |
Infrastructure |
| Category: |
Cleanroom |
| Subject: |
Parts and things to get after the cleanroom move |
|
|
- concrete Caulk to fill the drill holes in 1119
- Example [Pooyan: I have a caulk gun and silicon caulk at home, if needed.]
- Water hose for the washer in 1125
- 1/2" diameter
- almost 8 Ft
- Exhaust for the oven in 1125
- Question: not sure which way we want the exhaust to go. Measurements depend on the path.
- Rubber vibration dampers for the cleanroom fans
- 2.5 cm diameter, 1.5 cm height
- Example (not the exact size. Should also double check the broken ones and make sure that both sides are male)
- Cabling conduit from the cable tray to the optical table frame (through the cleanroom ceiling)
- Wire cable tray for 1125
- ~10 Ft, exactly similar to the one already installed in 1129
|
|
|
|
|