  398   Mon Jul 8 17:01:45 2024 ShaneUpdateCDSNew CyMAC internal layout[Jon, Shane]

Internal layout of CyMAC has
been updated (labeled image attached) to
accommodate the replacement of the two ribbon
 updated_cymac.jpeg 
  399   Tue Jul 9 18:19:50 2024 ShaneUpdateCDSADC-DAC loopback testing and IOLAN installation[Shane, Jon]

Finished ADC-DAC loopback
testing today (see attached xlsx file or
access directly here).
 iolanServerTerminal.jpegADC-DAC_Loopback_Testing.xlsxupdatedc1msc.jpeg 
  410   Tue Jul 16 18:43:07 2024 ShaneUpdateCDSADC-DAC loopback testing and IOLAN installation
UPDATE: 
Follow up ADC-DAC loopback testing
now complete, matching all the ADC channels
to a single DAC channel, and then matching
 Follow-up_ADC-DAC_Loopback_Testing.xlsx 
  419   Fri Aug 2 13:50:22 2024 ShaneUpdateCDSSerial Comm. Test (Agilent Turbo Pump)Did a brief communication test with the agilent
turbo pump today, to see if we could get
serial communications up and running for
 pinouts.jpeg 
  Draft   Tue Oct 1 19:41:23 2024 ShaneUpdateCDSCyMAC Timing Chassis Issue[Shane, Luis]


Summary of the issue we've
been having with the timing chassis: when
we connect only the Valon 5015 to power,
 IMG_5917.jpegIMG_5803.jpegIMG_5804.jpeg 
  456   Thu Oct 3 19:35:04 2024 ShaneUpdateCleanroomCleanroom cleaning and particle count


[Luke, Michael,
Cynthia, Mary]


cleaning cleanroom
and particle count
  
  461   Thu Oct 17 13:24:23 2024 ShaneUpdateCDSTiming Chassis issue identified



[Ma,
Luis, Shane]

Working theory for the
timing chassis issues had been that the 1A
 IMG_6462.jpegIMG_6464.jpeg 
  465   Fri Oct 25 10:56:30 2024 ShaneUpdateCDSTiming Chassis fixed and reinstalled


[Ma, Shane]

We
replaced the 1A breaker in the timing chassis
today with a 4A one, and tested that all
 successful_timing.jpeg 
  473   Thu Nov 14 11:58:05 2024 ShaneUpdateCDSTurbo pump connection troubleshootingAttempted connection to the TV551 turbo pump
through Varian/Agilent's software on spica.
Successful connection established, and we
  
  484   Wed Dec 4 16:01:23 2024 ShaneUpdateCDSVac serial interfacing troubleshooting updateUpdate on the issue with serial interfacing
for the TV 551 turbo pump: Tried a new test
today, to see if the commands being sent
  
  518   Wed Feb 19 13:44:48 2025 ShaneUpdateCDSVac serial interfacing update


[Jon, Shane]



Debugging update for vac system serial
communications: we were able to successfully
  
  527   Thu Feb 27 18:22:21 2025 ShaneUpdateCDSOngoing work in server rack and desk area (1119)As part of the vacuum communications debugging
process, there is ongoing work in the server
rack and desk area in 1119. Please be careful
  
  532   Tue Mar 4 10:47:03 2025 ShaneUpdateCDSVac system pinoutsAttached here are the pinouts, as we currently
know them, for the vacuum system. The three
items focused on here are the Agilent TwissTorr
 vac_pinouts_1.jpegvac_pinouts_2.jpeg 
  533   Wed Mar 5 12:16:28 2025 ShaneUpdateCDSVac system communications update

[Shane, Jon]

Update on the serial interfacing
with the vacuum system: both turbo pumps
  
  534   Wed Mar 5 18:13:20 2025 ShaneUpdateCDSvac system comms

[Shane, Jon] 

Update on the serial interfacing with
the Inficon VGC503 pressure gauge: We began
  
  535   Mon Mar 10 17:03:52 2025 ShaneUpdateCDSPressure Gauge successful connectVac system serial interfacing update: the
pressure gauge is now able to communicate
successfully through the code. It's been
  
  565   Wed Apr 30 13:42:45 2025 ShaneUpdateCDSUPS comms successfulUpdate on UPS1 serial interfacing: communication
is now successful. On 4/15/25 we connected
to UPS1 via ethernet rather than USB, and
  
  1   Sun Apr 10 15:39:49 2022 Rutuja GuravHowToComputer Scripts/ProgramsHowTo: Renew the Let's Encrypt SSL certificate using certbotPort 80 is kept closed by default. This
might be causing the certbot auto-renewal
cronjob to fail. Therefore we must renew
  
  748   Tue Sep 1 11:50:44 2026 Ruaraidh DumbreckUpdateTCSCOMSOL modeling for the ring heaterI’ve set up the base COMSOL model for Cosmic
Explorer ITM optics (450 mm diameter × 300
mm thickness). I implemented the absorbed
 WithRH2D.pngWithRH3D.png 
  749   Thu Sep 3 10:14:21 2026 Ruaraidh DumbreckUpdateTCSCOMSOL modeling for the ring heater + ShieldI had a bit of trouble with the deformation
model for the simulation but ive fixed it
now, although some of the scales are still
 1d.png3d.png2d.png 
  750   Thu Sep 10 10:45:52 2026 Ruaraidh DumbreckUpdateTCSCOMSOL modeling for the ring heaterSince last week, I have put the ring heater
on the correct side of the optic and found
that the thermal modelling is being limited
 plot_3.pngplot_2.pngplot_1.png 
  752   Thu Sep 17 11:52:48 2026 Ruaraidh DumbreckUpdateTCSCOMSOL modeling for the ring heater preliminary runThis week i have fixed the study to model
deformation and thermal expansion in 1 study
and corrected some errors in the system.

I
 6x 
  753   Thu Sep 24 14:00:51 2026 Ruaraidh DumbreckUpdateTCSdebugging and troubleshootingI am in the process of comparing my model
to the pre existing model used for current
ligo parameters. the aim is to have 2 studies,
 Screenshot_2026-09-24_134753.pngScreenshot_2026-09-24_135028.pngScreenshot_2026-09-24_135315.png 
  754   Thu Oct 1 13:04:03 2026 Ruaraidh DumbreckUpdateTCSCOMSOL Shield modeling (My model scaled to PRL model parmeters)so i have managed to produce good results
for my model. I have managed to produce results
that agree withing ~0.2%. The  metric im
 self.pngRH.pngPRL_self_HR.png 
  326   Tue Feb 13 13:02:41 2024 PooyanUpdateInterferometer SimulationsCacity sacn of Fabry-Perot Created a simple model of Fabry-Perot cavity
in SIS, and did a cavity scan. Total power
in the cavity, 00 mode, and HOMs is measured.
 IFOSim_update_2_13_24.pdf 
  356   Wed Mar 27 00:03:57 2024 PooyanUpdateComputersChimay relocation to Physics 1129 [Jon, Pooyan]

 Moved Chimay from
the server rack in Physics 1119 to a new
rack in Physics 1129. It is connected to
 Chima_front.jpgChimay_back.jpg 
  358   Mon Apr 8 14:43:29 2024 PooyanUpdateInterferometer SimulationsSIS update single and coupled cavities[Pooyan, Cynthia]

Attached is a brief
recap PDF file. A video file showing separate
HOMs plots for the cavity scan with ETM08
 IFOSim_SIS__update_4_8_24.pdfScreen_Recording_2024-03-31_at_2.46.29_AM.mov 
  382   Mon Jun 24 21:38:25 2024 PooyanInfrastructureComputersComputer server changes in 1119 and 1129[Jon, Pooyan, Tyler]
 
A few computer machine changes have
 IMG_6889.jpgIMG_6890.jpg 
  406   Mon Jul 15 14:28:32 2024 PooyanUpdateInterferometer SimulationsaLIGO test mass surface profiles Created a Google Slides presentation to
summarize all the mirror surface map information
that we use for simulating interferometers. 
  
  407   Mon Jul 15 14:49:06 2024 PooyanUpdateComputersSynology NAS server setupInstalled a Synology NAS server (Synology
RackStation RS1221) in lab room 1129, with
host name “scribe” and ip “192.168.1.17”.
  
  437   Mon Sep 9 14:27:36 2024 PooyanInfrastructureComputersChimay backup attemptOne ongoing work is to make all lab machines
automatically backed-up on Scribe on a daily
basis. The updates should be boatable and
  
  585   Tue Jun 3 11:50:08 2025 PooyanUpdateCDSCDS updateThere are three major issues with the lab's
CDS system that should be addressed. They
are ordered from the highest priority to
  
  590   Tue Jun 10 12:11:14 2025 PooyanUpdateCDSCDS update
The MEDM models issue was fixed.
The issue was that building the c1msc model
alone was not enough and we had to re-build
  
  592   Wed Jun 11 16:19:37 2025 PooyanUpdateCDSCDS update
Fast channels recorded to .gwf frame
files

Had to add a DAQ Channels
block to the c1msc model for those channel
 Screenshot_20250611_154834.pngf3k.pdf 
  593   Wed Jun 11 16:33:45 2025 PooyanUpdateComputersLuke's ray tracing hosting
Hosted Lukes model on Chimay. It's
available at https://richardsonlab.ucr.edu/real-time-frosti
The
sourcecode is at Github.
  
  632   Tue Aug 19 12:33:59 2025 PooyanUpdateTCSA# BS Update   A#_beamsplitter_thermal_lensing.pdf 
  672   Thu Jan 22 13:18:12 2026 PooyanInfrastructureGeneralLab floor plansThe working document of tasks regarding
moving the clean room is attached. Needs
LIGO account to access and edit. 
  
  689   Thu Mar 5 12:08:47 2026 PooyanInfrastructureCleanroomCleanroom HEPA fan defect[Pooyan, Ma, Mary, Tyler]

While re-installing the clean-room
HEPA fan filters, we realized that one of
 Screenshot_2026-03-05_at_10-52-30_WhisperFlow-Product-Data-and-Submittals-1788-50-Rev19.pdf.pngIMG_5591.jpeg2704.jpg2705.jpg2706.jpg 
  691   Wed Mar 11 19:38:21 2026 PooyanInfrastructureCleanroomParts and things to get after the cleanroom move
concrete Caulk to fill the drill
holes in 1119

Example [Pooyan:
I have a caulk gun and silicon caulk at home,
 8x 
  701   Sun Apr 19 15:22:08 2026 PooyanInfrastructureCleanroomHEPA fan air flow measurment[Ma, Mary, Tyler, Pooyan]
HEPA fan air flow measurements are
done with the fans sitting on their side
  
  708   Sun May 3 21:13:14 2026 PooyanInfrastructureCleanroomCleanroom HEPA fan install[Ma, Cece, Pooyan, Tyler]
We installed the repaired HEPA fans
on top of the cleanroom, and cleaned the
 1119.pdf 
  740   Tue Jul 21 17:58:36 2026 PooyanUpdateCDSCymac DAQ channel add for long-term recordingChanged the sample rate of Cymac ADC channels
V3 and VREF6 to 65 kHz for long-time recording.
(65536 to be exact)
 Screenshot_20260721_193849.png 
  744   Mon Aug 3 12:23:03 2026 PooyanInfrastructureCDSCymac backup schedule

Backup plan for
the CyMAC machine:
  
  10   Wed Aug 17 16:04:30 2022 Phoebe ZylaSummaryLoreTesting the Cartridge Heater and Collecting FLIR DataWe have tested the heater to find emissivity,
mounted the heater system to the optical
table, and have taken irradiance maps of
 Screenshot_(74).pngScreenshot_(75).pngScreenshot_from_2022-08-15_11-24-40.pngAcquisitionImage(Aug-15-2022_14_16).jpg 
  8   Fri Jul 22 13:20:28 2022 PhoebeUpdate ComsolI will be using comsol until 1:30 pm today.
I will be updating the model for the heater
mount to be thicker in certain areas, so
  
  16   Mon Jan 23 17:26:15 2023 Peter CarneyUpdateGeneralOven cleaningAiden and Cao 
Turned on the oven to 120
deg C for 12 hours. After 12 hours, put it
at 200 deg C for 48 hours. 
  
  21   Sat Feb 4 17:01:03 2023 PeterUpdateVLC ElectronicsLaser DataPeter and Ryan took laser beam data. Configuration:
100mm focal length lens is ~100mm from lens.
150mm focal length lens is ~200mm from first
 OmegaX_M2_Fit_3.pngOmegaY_M2_Fit_3.png 
  36   Tue Feb 28 19:31:05 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook M2 measurements today. Configuration:
Lens 1 (f = 50mm) at 0mm. Lens 2 (f = 150mm)
at 200mm, camera at 350mm. The laser beam
 X_width_and_Y_width.png 
  37   Tue Feb 28 19:33:51 2023 PeterUpdate 532 M2 MeasurementsY axis of plot in units of micrometers. X
axis in units of millimeters. 
  
  48   Thu Mar 9 12:03:59 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 Data today. Picture of the optical
set up is shown below. lens1 f = 100mm, lens2
f = 50mm, lens3 f = 150mm. There was a nice
 OmegaY_M2_Fit_3.pngOmegaX_M2_Fit_3.pngoptical_setup.jpg 