ligo-ex
ligo-ds
Richardson Lab Experimental Log, Page 5 of 11
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded | Collapse |
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Infrastructure
Physics
-- Category --
General
CDS
TCS
VAC
DAQ
Safety
Computers
Scripts/Programs
Electronics
Cameras
Wiki
ELOG
Equipment Loan
Lore
VLC Electronics
Clean & Bake
Cleanroom
VLC Update
FLIR
Measuring Noise in Interferometer
Interferometer Simulations
535 Entries
Goto page
Previous
1
,
2
,
3
,
4
, 5,
6
...
9
,
10
,
11
Next
Wed Mar 29 16:00:36 2023, Pamella, Update, Cameras, FLIR project
Fri Mar 31 14:23:13 2023, Pamella, Update, General, Clean and bake batch 11
Fri Apr 7 09:48:09 2023, Pamella, Update, General, Clean the system parts
7x
Tue Apr 11 17:56:15 2023, Pamella, Update, General, Lab cleaning
Wed Apr 19 17:39:50 2023, Pamella, Update, FLIR, FLIR project
Fri Apr 21 15:21:18 2023, Pamella, Update, FLIR,
Fri Apr 21 16:51:26 2023, Pamella, Update, General, Cleaning cables.
Mon May 22 17:08:50 2023, Pamella, Update, FLIR, FLIR project - Installing the mask.
Tue May 23 16:52:56 2023, Pamella, Update, FLIR, FLIR project - Reinstalling the mask and Reconfiguration FLIR position.
Wed May 24 14:06:27 2023, Pamella, Update, FLIR, FLIR project - Tests
Tue May 30 14:51:27 2023, Pamella, Update, FLIR, New 3D mask - Bigger triangles shapes.
Wed May 31 16:55:55 2023, Pamella, Update, FLIR, FLIR- Focus distance
Thu Jun 1 14:41:36 2023, Pamella, Update, FLIR, FLIR project - Test without the black wall.
Fri Jun 2 14:28:40 2023, Pamella, Update, FLIR, FLIR project - Test without the black wall.
Thu Jun 8 14:51:58 2023, Pamella, Update, FLIR, FLIR- Distance
Mon Jun 12 12:15:10 2023, Pamella, Update, FLIR, FLIR- Take data in the closest point.
Mon Jun 12 18:52:00 2023, Pamella, Update, General, Heater system parts - Wiped and bagged
Tue Jun 13 10:28:50 2023, Pamella, Update, General, Wiped and bagged the heating and cords.
Tue Jun 13 21:08:46 2023, Pamella, Infrastructure, VAC, Heater system - Installation
Tue Jun 13 21:33:46 2023, Pamella, Update, General, New cabinet for PPI
Wed Jun 14 15:35:36 2023, Pamella, Update, VAC, Heating system installation
Fri Jun 16 16:17:13 2023, Pamella, Update, FLIR, FLIR - Change the position
Mon Jun 19 11:20:57 2023, Pamella, Update, FLIR, FLIR - Fixed some problems
Tue Jun 20 17:28:23 2023, Pamella, Update, Electronics, Heater system parts - Wiped
Fri Jun 23 15:47:06 2023, Pamella, Update, FLIR, Collecting data - Moving horizontal and vertical on screen.
6x
Tue Jun 27 15:18:26 2023, Pamella, Update, FLIR, New data collection
Fri Jun 30 15:57:28 2023, Pamella, Update, FLIR, Data and python code update
Fri Jun 30 16:43:14 2023, Pamella, Update, FLIR, Updates: Small moving the FLIR camera
Mon Jul 3 18:38:13 2023, Pamella, Update, FLIR, FLIR project
Tue Jul 4 15:35:38 2023, Pamella, Update, FLIR, FLIR - reflexion problem
Thu Jul 6 18:03:19 2023, Pamella, Update, FLIR, FLIR project - New configuration
+
Sat Jul 8 14:26:17 2023, Pamella, Update, FLIR, Data with the new configuration without the mask and reflector.
6x
Fri Jul 14 16:49:42 2023, Pamella, Update, FLIR, New bridge and calibration data
Sun Jul 16 15:21:56 2023, Pamella, Update, General, General update about some problems in the lab.
+
Mon Jul 17 11:46:24 2023, Pamella, Update, FLIR, Thermocouple plot.
Tue Jul 18 16:04:26 2023, Pamella, Update, FLIR, Setup FLIR with black wall (black body)
+
Tue Jul 18 16:12:27 2023, Pamella, Update, FLIR, Thermocouple plot.
+
Tue Jul 18 16:35:06 2023, Pamella, Update, FLIR, Plot-Data with the new configuration without the mask and reflector.
Wed Jul 19 19:10:31 2023, Pamella, Update, FLIR, Data plot FLIR and updates.
8x
Thu Jul 20 21:00:23 2023, Pamella, Update, FLIR, Data plot FLIR and updates about the black body
Fri Jul 28 18:03:07 2023, Pamella, Update, FLIR, Final plot - FLIR
Mon Mar 10 21:13:12 2025, Nathan, Update, VLC Update, PDH Lock Progress and Next Steps
Mon Mar 10 21:32:29 2025, Nathan, Physics, Electronics, Beam Profiling and PBS Measurements
Tue Feb 6 22:40:25 2024, Michael, Update, Scripts/Programs, Long Crab 1 Design Created In Gtrace
Tue Feb 13 04:05:32 2024, Michael, Update, Interferometer Simulations, Shoelaces 1 Layout Simulated in GTrace
Wed Feb 21 23:15:07 2024, Michael, Update, Interferometer Simulations, Long Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in Beamsplitter
Tue Feb 27 03:26:28 2024, Michael, Update, Interferometer Simulations, Reverse aLIGO Layout Created in Gtrace
Sun Apr 7 13:42:51 2024, Michael, Update, Interferometer Simulations, Update on status of gtrace project
Mon Jul 8 12:26:10 2024, Michael, Update, Interferometer Simulations, Minimizing Astigmatic Effects in the SRC of LIGO
Mon Jul 15 15:52:40 2024, Michael, Update, Interferometer Simulations, aLIGO locking with varying SRC mirrors and measuring mode mismatch
Goto page
Previous
1
,
2
,
3
,
4
, 5,
6
...
9
,
10
,
11
Next
ELOG V3.1.3-7933898