  339   Sat Feb 24 08:53:38 2024 JonInfrastructureComputersMatlab upgraded to 2023b on ChimayI upgraded Matlab on chimay to the latest
stable release, 2023b. From some quick tests,
it appears to be in working order. Let me
  
  338   Fri Feb 23 18:03:27 2024 TylerUpdateFLIROptical Test Setup in Cleanroom[Tyler, Xuesi]

The FLIR and test mass
stand-in have been transferred into the cleanroom.
A software test will be run as soon as we
 IMG_0941.png 
  337   Fri Feb 23 15:01:48 2024 ShaneUpdateCDSLatest draft of MEDM screen for FROSTI readoutsHere's the latest draft of the MEDM screen
for the FrOSTI temp and power readouts. Also,
debugged the text readout boxes so they're
 IMG_6128.jpg23.jpg 
  335   Thu Feb 22 21:48:16 2024 JonUpdateVACVacuum vent for RGA testing of reflector[Jon, Tyler, Luke, Aiden]
Summary
Following
Wednesday's cleanroom cleaning [333],
we proceeded to vent the vacuum chamber,
 IMG_0938.pngIMG_0939.png 
  334   Wed Feb 21 23:15:07 2024 MichaelUpdateInterferometer SimulationsLong Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in BeamsplitterI have created the long shoelaces 1 layout
for cosmic explorer using gtrace, a slight
modification from the shoelaces 1 layout
 long_shoelaces1_desmos.JPGAR_side_with_reflection.PNGAR_side_without_reflection.PNG 
  333   Wed Feb 21 11:58:30 2024 ShaneUpdateCleanroomcleanroom cleaning and particle count


[Luke, Shane,
Tyler]


cleaning cleanroom and
particle count
  
  332   Tue Feb 20 18:08:24 2024 AidenUpdateGeneralDegassing the RGAI took an RGA measurement before and after
degassing the RGA. Both data was taken with
the Argon open. The pressure before taking
 bake11_240220_Elements_postdegas_ArO.pngbake11_240220_Elements_predegas_ArO.png 
  331   Tue Feb 20 11:31:49 2024 TylerUpdateCleanroomGarment Cabinet Door Replacement[Luis, Luke, Pooyan, Tyler]


The replacement
door for the HEPA garment cabinet arrived
last week, and was installed on Thursday.
 image_67190529.JPGimage_67177473.JPG 
  330   Tue Feb 20 08:01:30 2024 JonInfrastructureGeneralPower and network equipment installed in 1129 rack[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On
Thursday we installed the power conditioning/distribution
equipment and networking equipment in the
 IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg 
  329   Mon Feb 19 14:40:21 2024 ShaneUpdateCDSMEDM screen for FROSTI temp readoutsHere's the latest draft of the MEDM screen
for the FROSTI heating elements' temperature
readouts. Note that the MEDM screen isn't
 IMG_6094.jpegIMG_6092.jpeg 
  328   Mon Feb 19 14:17:50 2024 AidenUpdateVACHeater Element RGA ScanThree days after the completion of Bake 11,
the Heater elements RGA scan looks much cleaner.
The HC level is back down to 33 e-10 torrl/s
 bake11_240219_Elements_ArO.png 
  327   Fri Feb 16 18:37:28 2024 JonUpdateVACBake ended 6:23 pmI ended the bake of the UHV system (that
began on Monday) at 6:23 pm today by switching
OFF both PID controllers. The heaters elements
  
  326   Tue Feb 13 13:02:41 2024 PooyanUpdateInterferometer SimulationsCacity sacn of Fabry-Perot Created a simple model of Fabry-Perot cavity
in SIS, and did a cavity scan. Total power
in the cavity, 00 mode, and HOMs is measured.
 IFOSim_update_2_13_24.pdf 
  325   Tue Feb 13 12:34:04 2024 AidenUpdateVACVAC Heating System UpdateHere is an overlay with for all the heating
steps done with the heater elements.
 bake10_240118_Elements_ArO.png 
  324   Tue Feb 13 12:26:23 2024 TylerUpdateInterferometer SimulationsBS Code Update I reproduced Cao's CE beamsplitter code
(see below for example plots). I received
the current info on the beamsplitter parameters
 thickness1.pdfbs_opd_homloss_h6cm_w2cm.pdf 
  323   Tue Feb 13 11:54:45 2024 TylerConfigurationFLIRIn-Air Optical Test Configuration
Below is the proposed schematic for FROSTI
optical testing, chosen so enough space is
allotted for prototype assembly.
 In-air_optical_test_sketch.png 
  322   Tue Feb 13 04:05:32 2024 MichaelUpdateInterferometer SimulationsShoelaces 1 Layout Simulated in GTraceI've worked on and have completed a first
simulation of Cosmic Explorer's Shoelaces
1 layout. This is based off of Pooyan's original
 shoelaces1_dxf.JPGshoelaces1_desmos.JPG 
  321   Tue Feb 13 01:26:30 2024 PeterUpdateInterferometer SimulationsCARM Power SimulationsCao's simulations of the circulating power
and gouy phase through a single arm cavity
of the interferometer have been reproduced.
 Scenario_3_CARM.pdfScenario_3_CARM_Gouy.pdf 
  320   Mon Feb 12 17:35:47 2024 AidenUpdateVACHeater Element RGA ScanTook more RGA data before and after increasing
the heater elements to 300 degC and before
heating them up.

 bake10_240212_Elements_ArO.pngbake10_240212_Elements_ArC.pngbake10_240212_Elements_300C_ArC.png 
  319   Thu Feb 8 17:37:48 2024 AidenUpdateVACHeater Element RGA ScanTook more RGA data now that the heaters are
powered by 18V. The pressure of the system
during the data taking was 3.8 e-8 torr.
 bake10_240208_Elements_ArO.pngbake10_240208_Elements_ArC.png 
  318   Wed Feb 7 12:43:22 2024 shaneUpdateCleanroomcleanroom particle counts (full 5 zone measurement)Here's today's full 5 zone measurement of
the cleanroom. Everything is back under the
requirement. 
 24.png 
  317   Tue Feb 6 22:40:25 2024 MichaelUpdateScripts/ProgramsLong Crab 1 Design Created In GtraceWorked on and completed the python code for
the simulation of the Long Crab 1 layout
for Cosmic Explorer basing off of Pooyan's
 Long_Crab1.pnglong_crab_1_desmos.PNG 
  316   Mon Feb 5 14:17:52 2024 AidenUpdateVACHeater Element RGA ScanHere are the new RGA scans for the powered
Heater elements. The pressure at the time
of taking data was 2.88 e-8 torr. The HC
 bake10_240205_Elements_ArO.pngbake10_240205_Elements_ArC.png 
  315   Fri Feb 2 19:18:24 2024 shaneUpdateCleanroomcleanroom cleaning and particle count


[Aiden, Shane,
Luis, Luke]


cleaning cleanroom
and particle count
  
  314   Fri Feb 2 19:08:20 2024 AidenUpdateVAC1st Hot Element RGA ScanHere are the measurements for the RGA scan
of the elements while on at around 160C.
The pressure of the chamber during the test
 bake10_240202_Elements_ArC.pngbake10_240202_Elements_ArO.png 
  313   Fri Feb 2 16:56:56 2024 JonUpdateCDSRTS model implemented for FROSTI RTD readoutsSummary
Today I finished implementing
an RTS model to read out the integrated FROSTI
RTDs (temperature sensors) via the CyMAC.
 sitemap_screen.png 
  312   Wed Jan 31 14:37:26 2024 ShaneSummaryCDSpath directions for CyMAC model and parts libraryPath to cds parts library in Matlab simulink:
/usr/share/advligorts/src/src/epics/simLink.
File name CDS_PARTS.mdl
Path to user models:
  
  311   Tue Jan 30 11:36:19 2024 TylerUpdateElectronicsRTD Chassis



  
  310   Tue Jan 23 12:17:41 2024 TylerUpdateElectronicsRTD Chassis
After updating the wiring in the RTD
Chassis, a signal is now seen at each ADC
input. However, there seems to be a discrepancy
 rtd_updated_circuitry.jpg 
  309   Thu Jan 18 18:06:49 2024 shaneUpdateCleanroomcleanroom 5 zone particle count measurementHere's today's full five zone measurement
of the cleanroom
 24.png 
  308   Thu Jan 18 15:13:37 2024 AidenUpdateVACVAC Heating System Update[Aiden]

Took more data today and the
chamber and elements are showing an even
lower HC level than we have gotten before.
 bake10_240118_Elements_ArO.pngJanuary_18_Ar_Open_Elements_Analyzed.png 
  307   Wed Jan 17 15:47:49 2024 AidenUpdateGeneralResistors for Heater ElementsPower         Res (Ohm) RTD Res (Ohm)

Heater
1= 73.6; 81.8

Heater 2= 70.4; 82.1

Heater
3= 71; 84.5

Heater 4= 71.5; 80

Heater
  
  306   Tue Jan 16 16:11:41 2024 AidenUpdateVAC [Aiden,Luis]

Below is the data for the
most recent bake. I believe the chamber is
cleaner than it is actually showing as the
 bake10_240116_Elements_ArO.pngbake10_240116_Elements_ArC.png 
  305   Tue Jan 16 12:20:21 2024 TylerConfigurationElectronicsRTD Readout Chassis Update 2
I performed another continuity test on
the RTD chassis wiring, and everything seems
to be set up correctly. The chassis should
 IMG_8146.jpgIMG_8147.jpg 
  304   Tue Jan 16 10:01:21 2024 PeterUpdateVLC UpdateVLC Faraday Isolator and Mode MatchingAttached is a PDF of my weekly updates.   VLC_Mode_Matching_Design_-_Remastered.pdf 
  303   Mon Jan 15 22:29:34 2024 JonInfrastructureGeneralCabinet installation & lab clean-up completed[Jon, Tyler, Aiden, Shane, Pooyan, Michael,
Cynthia, Luke]
On Wednesday, we completed long list
 1129.png1119.png 
  302   Wed Jan 10 15:27:18 2024 ShaneUpdateCleanroomcleanroom cleaning and particle count


[Aiden, Shane]


cleaning
cleanroom and particle count


2:03 pm: changed sticky
  
  301   Tue Jan 9 16:35:09 2024 AidenUpdateVACVAC System Leak and Heating[Luis, Luke, Aiden]

Leak tested each
flange and weld and only found two flanges
to have noticeable leaks with the electron
  
  300   Tue Jan 9 12:08:59 2024 TylerConfigurationElectronicsRTD Readout Chassis Update
Below is the current state of the RTD
readout chassis wiring. Initial continuity
tests seem good, will run through one more
 IMG_8105.jpg 
  299   Mon Jan 8 20:24:53 2024 AidenUpdateGeneral [Jon, Aiden]

Installed the heater elements
into their fixture and prepped the cables
by twisting the wires into pairs. We also
 IMG_4888.jpgIMG_4886.jpgIMG_4887.jpg 
  298   Fri Dec 29 16:02:27 2023 JonConfigurationElectronicsRTD Readout ChassisThe custom front and rear panels for the
RTD readout chassis arrived last Friday.
I installed them in the chassis frame to
 front.jpegrear.jpegoverhead.jpeg 
  297   Wed Dec 20 10:33:34 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129Update: I
have completed permanent routing of the electrical
cables. I also ran the ultrasonic washer's
  
  296   Tue Dec 19 15:45:05 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook RGA data for the macor parts inside of
the chamber. With the Ar open the HC levels
read 30 torrl/s which is around where it
 bake9_231219_Macor_ArO.pngbake9_231219_Macor_ArC.png 
  295   Mon Dec 18 15:51:49 2023 AidenUpdateVACVAC System Heating UpdateAfter letting the chamber cool down I put
the electronics back on and turned the RGA
element back on. No data has been taken yet
  
  294   Sun Dec 17 21:04:15 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129[Jon, Tyler, Aiden, Luke]
On Friday we completed assembly of
the new stainless steel-topped benches in
 IMG_0781.pngIMG_0782.png 
  293   Sun Dec 17 19:43:18 2023 AidenUpdateVACVac Heating Update[Aiden]

I measured the temperature of
the flanges where some of the electronics
will go and I found that the RGA flange was
  
  292   Fri Dec 15 14:03:02 2023 AidenHowToVACVacuum Chamber Opening[Aiden]

1. Turn off the RGA filament
and disconnect it.

2. Record the pressure
and then close the angle valve and gate valve
  
  291   Mon Dec 11 16:20:17 2023 JonSummaryTCSFROSTI Assembly ProcedureBelow is the procedure we will follow to
assemble the FROSTI prototype.

Install SS guide rods and
  
  290   Mon Dec 11 12:58:57 2023 Shane, LuisUpdateCDSDAC-ADC loopback test debugging[Luis, Shane]

Working on debugging last
week's weird results for the ADC-DAC loopback
test for channels 14 and 15. With DAC output
  
  289   Sat Dec 9 12:34:12 2023 JonUpdateGeneralElectronics workshop migrated to 1129[Jon, Tyler, Shane, Luis]
On Wednesday we completed the migration
of the electronics workshop from 1119 to
 IMG_0765.jpgIMG_0767.jpeg 