Entry  Thu Jun 27 11:09:14 2024, Liu, Update, Scripts/Programs, Straight edge STEP files and ray loss analysis edge_CAD_8x2_step.PNGedge_CAD_step.PNGIrradiance_frontheater.pngIrradiance_profile.pdf
 Drawings and CAD models of the straight-edge designs are exported, and are visualized in SOLIDWORKS. Two are attached. One is a single edge of the evenly
spaced polygon design with 16 edges, and the other is the 8x2 design, with two neighboring edges grouped together to replace the original single curved
heater. 

 For the straight edge design in COMSOL, ray power detectors were placed at the heater's front surface. The irradiance is shown in 
Entry  Wed Jun 26 16:39:34 2024, Luke, Update, VAC, Vacuum chamber leak checking  image_2024-06-26_162539705.pngimage_2024-06-26_162601616.png
On Tuesday I had isolated the main volume and let it pump down over-night. Today, Wednesday, I checked it and it had only gone down by a small amount compared
to when I left it on Tuesday. 
I then proceeded to tighten down the bolts attaching the tubo-pump to the zero-length reducer while it was under vacuum.
This caused the pressure to drop down a few orders of magnitude. 
Entry  Thu Jun 20 18:01:11 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129 
I have repurposed a spare Intel NUC to serve as the first of two planned workstations in 1129. Today I set it up with a fresh installation of Debian 12.5,
assigned it the static IP address 192.168.1.15, and installed the LIGO CDS workstation packages. It is assigned the host name ws3.


Temporarily, the
mouse is borrowed from ws1 in 1119. We need to order another mouse as well as a 25-ft Ethernet cable for connecting the workstation to the 1129 switch,
    Reply  Wed Jun 26 15:33:41 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129 IMG_1368.jpg

Set-up of the first CDS workstation for 1129, ws3, is complete and the machine is ready for use. The login credentials are the same as the other lab
machines. 


All that now remains is to install a permanent cable tray for running the new Ethernet cables between the electronics rack and bench (they are
Entry  Tue Jun 25 17:19:42 2024, Luke, Update, VAC, Vacuum chamber leak checking  image_2024-06-25_170036021.pngimage_2024-06-25_170057738.pngimage_2024-06-25_170120030.pngimage_2024-06-25_171238788.png
Currently our main leak is in the RGA line. We found this by closing the gate valve from the main volume to see if which side was leaking more.

After
identifying this we are pumping down the main volume to see how low it can go the third attachment was taken at 4:16 6/25/24. Pumping started around 3:15.



We have not been able to find exactly which flange is leaking, but our guess is on the small blanks and where the cube attaches to the gate valve
Entry  Tue Jun 25 12:34:18 2024, Shane, Update, Cleanroom, cleanroom cleaning and particle count 



[Luke, Shane, Xuejun, Mohak, Michael, Tyler, Cynthia]


cleaning cleanroom and particle count



10:45 am: ran zero count test on particle counter 
11:02 am: started particle count
zone 3:  0.3 u: 32840.5
u: 12471.0 u:332

zone 4:  0.3 u: 18290.5 u: 5811.0 u: 207


11:15
Entry  Mon Jun 24 21:38:25 2024, Pooyan, Infrastructure, Computers, Computer server changes in 1119 and 1129 IMG_6889.jpgIMG_6890.jpg
[Jon, Pooyan, Tyler]
 
A few computer machine changes have been made. 
Entry  Mon Jun 24 14:28:51 2024, Cynthia , Update, Interferometer Simulations, SIS cavity with thermal effect ETM08thermal.png
tried to run a cavity scan with thermal deformation and ring heater for ITM04 ETM08 (aLIGO mirrors). Not sure about the accuracy of the graph as there is
some commands that still need to verified. 
Entry  Fri Jun 21 11:47:30 2024, Liu, Update, Scripts/Programs, COMSOL simulation on alternative straightened heater elements design 6x
 In the previous post, we saw that for the heater element design with straight
edges in replacement of the current eight-element ring-like design, it provides the similar Gaussian-like irradiance profiles, but with smaller power delivery
efficiencies, as shown in the plot. This turned
Entry  Wed Jun 19 18:45:14 2024, Luke, Update, , Vacuum chamber reassembly  image_2024-06-19_182556383.pngimage_2024-06-19_182631737.pngIMG_1710.jpg
[Luke, Aiden, Mohak , Tyler]

On Tuesday we had the silver screws for the spherical cube shortened by a quarter of an inch so that they would fit into
the gate valve. We then attached the spherical cube to the vacuum chamber. 

On Wednesday we finished assembling the RGA line and the main turbo pump.
Entry  Mon Jun 17 11:47:46 2024, Liu, Infrastructure, General, Temporary cooling units for the labs 1119.jpg1129.jpg
Below are the temporary cooling units installed last week in labs 1119 and 1129. They are the temp. replacement for the building AC system, which will be
shut down during the Physics roof replacement. 
Entry  Fri Jun 14 13:32:13 2024, Liu, Update, Scripts/Programs, COMSOL simulation on rectangular heater elements design 6x
I have been looking at the feasibility of an alternative heater element design for FROSTI that replaces the original ring-like heater elements with n
rectangular elements with straight edges. They form an n-sided regular polygon that could well approximate the original annular ring if n is large enough.
This eliminates curved surfaces requirement for the heater elements, which was the source of the many month production delay for the prototype parts. 
Entry  Mon Jun 3 14:14:39 2024, Tyler, Update, FLIR, Initial CIT FROSTI Analysis  CIT_FROSTI_Analysis_Group_Meeting-2.pdf
[Tyler]


Attached below are the initial results of the CIT FROSTI testing analysis.
    Reply  Mon Jun 10 14:52:38 2024, Tyler, Update, FLIR, CIT FROSTI Analysis Update FROSTI_HR_Temperature_Difference-7.png
[Tyler]


Upon further inspection, one adjustment was made to the FROSTI profile analysis: changing the transmission value of the ZnSe viewport. It
was initially assumed that the viewport possessed an AR coating, which would bring the transmission into the 90% range. Without the coating, it drops to
roughly 70%. Assuming no coating, the estimated delivered power was calculated to be 11.7 W. This is consistent with the estimated power given from the
Entry  Mon Jun 3 14:59:44 2024, Cynthia, Update, Interferometer Simulations, Created cavity scan with LG modes  ligo_update_6_3.pdf
 
Entry  Mon Jun 3 09:24:48 2024, Aiden, Update, VAC, Vacuum Chamber Rendering VaccumChamberAssembly__Redesign_with_tee.jpgVaccumChamberAssembly__Redesign_with_tee_top.png
Here is a new render of the vacuum chamber that includes the 2.75 tee to place the Argon leak right next to the RGA. The conical reducer under the spherical
cube was also replaced with a 4.5 blank. The height from the bottom of the blank to the bottom face of the chamber is 5.45". With the chamber now on 1"
standoffs, we will need a support with a height of 6.45".
Entry  Fri May 31 19:37:47 2024, Luke, Update, , Vacuum chamber Disassembly  IMG_1681.jpgIMG_1680.jpgIMG_1680.jpgIMG_1681.jpg
[Luke, Aiden, Jon, Michel, Tyler]

Work done:
On Tuesday (5/28) we removed the RGA line with minimal difficulty. On Wednesday (5/29) we removed the turbo
pump, which had a few bolts that we needed to cut. We borrowed a dremel with ceramic blades from the machine shop to help remove some of the bolts. On
Thursday we moved the vacuum chamber onto the floor to check and resecure the heating band on the bottom of the vacuum chamber. We then relocated the posts
Entry  Thu May 16 15:23:14 2024, Shane, Update, Cleanroom, Cleanroom cleaning and particle count 



[Luis, Michael, Luke, Shane]


cleaning cleanroom and particle count


1:45 pm: ran zero count test on particle counter 
1:50 pm: started particle count
zone 3:  0.3 u: 2660 0.5
u: 3321.0 u: 41

zone 4:  0.3 u: 81060.5 u: 24941.0 u: 831



2:08
Entry  Mon May 13 14:53:29 2024, Peter, Update, VLC Update, VLC VLC_Update.pdf
VLC Update WEEK 7 attached below
Entry  Mon May 13 14:48:27 2024, Aiden, Update, VAC, New Vacuum Chamber Design VaccumChamberAssembly__Redesign_v5.jpg
I created a new model for the vacuum chamber based on the ideas from last week's meeting.

It should be noted that we can not have the zero length
reducer and the gate valve on the same arm as they both have blind tapped holes. We need to decide if we want the gate valve or not as if we do, we will
need to use the 3 inch long reducer.
 Important Measurements:

From the back of the flange to the back of the RGA: 25.25 in

Height from
Entry  Mon May 13 13:03:41 2024, Tyler, Update, FLIR, Readout Code Updates AcquisitionImage(Jul-18-2023_15_24).jpg.png
[Tyler]


Some changes have been made to the FLIR readout code to help improve its functionality:


More accurate temperature readings
than before due to updates in the calculation procedure. A bug was causing one of the parameters to not update correctly; this is now fixed.
Saved
data now stored in HDF5 files rather than CSV.
User can now enable automatic data storage by specifying a collection interval (in minutes). The
Entry  Tue May 7 20:34:31 2024, shane, Update, CDS, frosti MEDM screen update FROSTIMEDMMay7.2024.png
[Luis, Shane]
Here is the updated MEDM screen, with new orientation and updated labeling to reflect the actual positions of the heater elements. Note that
indices start at T0 to be consistent with simulink model, though in the previous elog for the FROSTI layout the heater elements are labeled 1-8.
Also,
we finally learned how to take a screenshot on debian.
Entry  Thu May 2 22:43:36 2024, Tyler, Update, Electronics, RTD Readout Chassis Redesign IMG_9013.jpg
[Tyler, Jon]


Today the FROSTI RTD readout chassis underwent a redesign:



Instead of the original ratiometric method, which involved wiring the FROSTI RTDs in series, each element is individually powered by separate
excitations. Each element additionally possesses its own reference resistor of 100 Ohm. Now, if an RTD experiences an electrical short, it should not affect
Entry  Mon Apr 22 15:06:33 2024, Cynthia , Update, Interferometer Simulations, cavity scan update LIGO_4_22.pdf
[Cynthia,Pooyan]
Completed some simulations injecting 0-10th order modes. Some graphs will be used for the poster after some further titles, axis, and
range adjustments. 
Entry  Wed Apr 17 15:07:04 2024, Shane, Update, Cleanroom, Cleanroom cleaning and particle count 



[Mohak, Luke, Luis, Shane, Cynthia, Michael, Xuesi]


cleaning cleanroom and particle count

NOTE: particle counter was found dead, with the charging dock unplugged. For future reference, if you need to unplug
the dock, please either plug it back in when you're done, or make a note in an elog so someone else can come down and charge it.
Entry  Mon Apr 15 15:25:10 2024, Cynthia, Update, Interferometer Simulations, progress on simulation so far LIGO_update_week3_(2).pdf
 
Entry  Mon Apr 15 11:51:03 2024, Peter, Update, VLC Update, VLC VLC_Update_April_15_2024.pdf
An update on the VLC project is attached below:
Entry  Mon Apr 8 14:57:41 2024, Cynthia, Pooyan, Update, Interferometer Simulations, performed cavity scans for O4 O5, and coupled cavity  LIGO_update_week1.pdf
 
Entry  Mon Apr 8 14:43:29 2024, Pooyan, Update, Interferometer Simulations, SIS update single and coupled cavities IFOSim_SIS__update_4_8_24.pdfScreen_Recording_2024-03-31_at_2.46.29_AM.mov
[Pooyan, Cynthia]

Attached is a brief recap PDF file. A video file showing separate HOMs plots for the cavity scan with ETM08 surface map is also
attached. 

The codes are available at https://git.ligo.org/uc_riverside/hom-rh/-/tree/main/SIS
Entry  Sun Apr 7 13:42:51 2024, Michael, Update, Interferometer Simulations, Update on status of gtrace project Sequential_beam_trace_crab1.pngangle_of_incidence_yaml_example.png
[Pooyan, Michael]

After meeting and discussing the current state of our work with Prof. Fulda a few weeks ago, we have decided that the best next
step for the gtrace project is its integration into finesse work. Our first step towards this integration involved creating a sequential beam trace in
contrast to the previous non sequential gtrace simulations. A sequential beam trace not only allows for faster runtimes of the simulation (
Entry  Wed Mar 27 00:03:57 2024, Pooyan, Update, Computers, Chimay relocation to Physics 1129 Chima_front.jpgChimay_back.jpg
 [Jon, Pooyan]

 Moved Chimay from the server rack in Physics 1119 to a new rack in Physics 1129. It is connected to the switch in that rack
and has the same ip address as before.
 All services are up and running. 

 It appears that JupyterHub creates some processes whenever a user
connects to an instance of it, but in some cases does not stop those processes after the user is not using that instance. This results in having lots of
Entry  Sun Mar 24 11:50:37 2024, Aiden, Update, Clean & Bake, Cal Tech FROSTI Parts 
Bagged the FROSTI legs and feet after the conclusion of the clean and bake. They are double bagged and sitting in the flow bench.
Entry  Sun Mar 24 11:49:27 2024, Aiden, Update, General, FROSTI RGA Scan bake13_240324_FROSTI_ArC.pngbake13_240324_FROSTI_ArO.png
Took RGA data 1 day after the conclusion of Bake 13. Bake 13 ended on Saturday March 23, the RGA data shown was taken on Sunday March 24. The scan shows
that the FROSTI is very clean with no outgassing. The HC levels are at 25 e-10. The pressure in the chamber was also a 1.64 e-8 Torr.
Entry  Tue Mar 19 15:22:27 2024, Aiden, Update, Clean & Bake, FROSTI Legs Clean and Bake 
[Aiden, Luke]

Cleaned and baked the Cal Tech FROSTI legs and showed Luke the procedure on how to clean parts.
Entry  Tue Mar 19 10:55:30 2024, Tyler, Update, FLIR, In-Air Optical Test FroSTI_Thermal_Profile.png
Below is an image I took using the FLIR just before leaving for the LVK meeting. The profile is roughly what we would expect (annular). Any distortions
seen are likely from the screen not being completely parallel to the plane of the FroSTI (i.e. the screen slightly bends in various locations). Next step:
In-vacuum test at CIT.
Entry  Fri Mar 15 16:58:55 2024, Aiden, Update, VAC, Vacuum Chamber Frosti Testing bake12_240314_Empty_ArC.pngbake12_240314_Empty_ArO.png
[Luke, Luis, Aiden]

On Thursday, March 14 - Took preliminary RGA scans of the empty chamber to compare later on. Vented the chamber and placed the FROSTI
into the chamber. Plugged in the DB-25 connectors into the feed through port and checked the connection to make sure there were no shorts before closing
the chamber and starting the pumps again.

On Friday, March 15 - The pressure in the chamber has come down to 7 e-6 torr. It seems to be coming down
Entry  Wed Mar 6 09:57:52 2024, Tyler, Update, TCS, FROSTI Wiring 
 Upon finishing the FROSTI assembly last week, we ran into some electrical issues. An electrical short was found between two of the d-sub pins (2 and
8). It appears that the pins were somehow coming into contact with the aluminum surrounding them. This was causing the power supply to trip. The issue
was seemingly fixed by adjusting the positioning of the cabling leading out of the reflector. When handling the device in the future, please make sure
Entry  Thu Feb 29 17:16:48 2024, Shane, Update, CDS, MEDM screen for FROSTI T/P readouts IMG_6259.jpeg
Here's the latest draft of the MEDM screen for the FROSTI temp and power readouts, now with a button linking to the c1msc file display. Size/color/label
are all changeable, if adjustment is needed. Checked in execute mode as well, and it's working correctly. Also noticed that the MEDM file name has been
changed to FROSTI.adl, which I'm noting here for future reference. Still in medm_sandbox directory. 
Entry  Mon Feb 26 21:23:27 2024, Jon, Update, TCS, FROSTI Assembly - Day 1 7x
[Jon, Tyler, Luis, Luke, Mohak, Cynthia, Michael, Aiden]
FROSTI assembly began today. After a final set of RGA scans were taken, the vacuum chamber
was vented and the reflectors were removed. The chamber was then resealed and pumped down again. 
Today we completed the installation of the Macor hardware and heater elements between the two reflector halves. Tomorrow we will route, bundle,
    Reply  Wed Feb 28 17:49:18 2024, Tyler, Update, TCS, FROSTI Assembly - Days 2-3 IMG_0947.pngIMG_0956.pngIMG_0957.pngIMG_0959.png
[Aiden, Jon, Luis, Luke, Michael, Tyler]

FROSTI assembly was completed today. The RTD and power wires were terminated at the DB-25 connectors and
the legs were put on. It is currently placed in front of the stand-in test mass (~5 cm away). The FLIR has also been moved back to it's nominal position.
As of now, it appears there are some shorts within the power cabling. This will be a focus of tomorrow's work.


Entry  Wed Jan 17 15:47:49 2024, Aiden, Update, General, Resistors for Heater Elements 
Power         Res (Ohm) RTD Res (Ohm)

Heater 1= 73.6; 81.8

Heater 2= 70.4; 82.1

Heater 3= 71; 84.5

Heater 4= 71.5; 80

Heater
5= 70.5; 81.7

Heater 6= 72; 79.4

Heater 7= 69.2; 78.2

Heater 8= 71.1; 84.2
    Reply  Wed Feb 28 12:02:08 2024, Tyler, Update, General, Resistors for Heater Elements Update 
Power         Res (Ohm) RTD Res (Ohm)

Heater 1= 72.8; 80.6

Heater 2= 69.5; 80.8

Heater 3= 70; 83.2

Heater 4= 70.6; 78.7

Heater
5= 69.9; 80.6

Heater 6= 71.1; 78.2

Heater 7= 68.5; 76.8

Heater 8= 70.1; 82.8







Quote:

Entry  Tue Feb 27 09:06:29 2024, Cynthia , Update, Interferometer Simulations, cavity scan with higher order input laser ligoPre_2_27.pdf
I performed a few cavity scan with the inputing laser with a different mode (not pure 00). For each laser I included a graph for just plotting the order
with highest power (for example 1st order laser input the first plot only scanned for 1st order in that cavity), and I have also included a graph scanning
for order 1-10. 
Entry  Tue Feb 27 03:26:28 2024, Michael, Update, Interferometer Simulations, Reverse aLIGO Layout Created in Gtrace reverse_aligo_desmos.JPGreverse_aligo_dxf.JPG
I've created the simulation for reverse aLIGO layout in gtrace. Attached are the desmos model and the output dxf file. From here Pooyan and I plan to create
a brief report of our progress to the CE optical design group.
Entry  Mon Feb 26 15:15:39 2024, Aiden, Update, General, Vacuum Chamber Baking Update 
Started Bake 12 on Wednesday Feb. 21 and turned the bake off on Saturday Feb. 24. This was a normal low temp bake with the PID controllers set to 110 degC.
Entry  Sat Feb 24 08:53:38 2024, Jon, Infrastructure, Computers, Matlab upgraded to 2023b on Chimay 
I upgraded Matlab on chimay to the latest stable release, 2023b. From some quick tests, it appears to be in working order. Let me know of any issues.
Entry  Fri Feb 23 18:03:27 2024, Tyler, Update, FLIR, Optical Test Setup in Cleanroom IMG_0941.png
[Tyler, Xuesi]

The FLIR and test mass stand-in have been transferred into the cleanroom. A software test will be run as soon as we get an ethernet
cable long enough to reach into the cleanroom where the camera is set up. Once this is finished, the FLIR will be moved aside for construction of the FROSTI!
When completed, the camera will be placed back into position for in-air optical testing.
Entry  Fri Feb 23 15:01:48 2024, Shane, Update, CDS, Latest draft of MEDM screen for FROSTI readouts IMG_6128.jpg23.jpg
Here's the latest draft of the MEDM screen for the FrOSTI temp and power readouts. Also, debugged the text readout boxes so they're now correctly reading
out the live temperature and power values. 
Entry  Thu Feb 22 21:48:16 2024, Jon, Update, VAC, Vacuum vent for RGA testing of reflector IMG_0938.pngIMG_0939.png
[Jon, Tyler, Luke, Aiden]
Summary
Following Wednesday's cleanroom cleaning [333],
we proceeded to vent the vacuum chamber, remove the heater elements and their mount structure, and install the FROSTI reflectors. The reflectors are the
final components to undergo RGA testing before the FROSTI prototype can be assembled. After installing the reflectors, we pumped the chamber
Entry  Wed Feb 21 23:15:07 2024, Michael, Update, Interferometer Simulations, Long Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in Beamsplitter long_shoelaces1_desmos.JPGAR_side_with_reflection.PNGAR_side_without_reflection.PNG
I have created the long shoelaces 1 layout for cosmic explorer using gtrace, a slight modification from the shoelaces 1 layout design. I also modified the
simulation code slightly to remove ghosting effects in the beamsplitter. Originally the python code specified that the HR and AR sides of the beamsplitter
both have the same transmission/reflection. I modified this to the ideal case of: Refl_AR = 0, Trans_AR = 1. I have attached two images below to show the
Entry  Wed Feb 21 11:58:30 2024, Shane, Update, Cleanroom, cleanroom cleaning and particle count 



[Luke, Shane, Tyler]


cleaning cleanroom and particle count


11:50 am: ran zero count test on particle counter 
11:55 am: started particle count
zone 3:  0.3 u: 17870.5
u: 5811.0 u: 166

zone 4:  0.3 u: 6230.5 u: 2901.0 u: 124



12:17
Entry  Tue Feb 20 18:08:24 2024, Aiden, Update, General, Degassing the RGA bake11_240220_Elements_postdegas_ArO.pngbake11_240220_Elements_predegas_ArO.png
I took an RGA measurement before and after degassing the RGA. Both data was taken with the Argon open. The pressure before taking data was 2.39 e-8 torr
in the main volume. Note that the main chamber was fully valved off for the degas and the main chamber pressure quickly rose to e-6 torr. Further investigation
of this rise should be done as this might be the main culprit for the leaking.
Entry  Tue Feb 20 11:31:49 2024, Tyler, Update, Cleanroom, Garment Cabinet Door Replacement image_67190529.JPGimage_67177473.JPG
[Luis, Luke, Pooyan, Tyler]


The replacement door for the HEPA garment cabinet arrived last week, and was installed on Thursday. However, it looks
like there's a small gap between the door and where the hinge is attached to the cabinet frame. No screws were provided with the replacement door. If we
want to perform any adjustments, we have to be very careful; the screws break very easily. 
Entry  Mon Jan 15 22:29:34 2024, Jon, Infrastructure, General, Cabinet installation & lab clean-up completed 1129.png1119.png
[Jon, Tyler, Aiden, Shane, Pooyan, Michael, Cynthia, Luke]
On Wednesday, we completed long list of work towards making the new lab (1129) fully operational and enabling the next phase of FROSTI testing. 
Cabinet Installation
Three new VWR cabinets with sliding glass doors were installed in 1129. Each unit measures 48"
    Reply  Tue Feb 20 08:01:30 2024, Jon, Infrastructure, General, Power and network equipment installed in 1129 rack IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg
[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On Thursday we installed the power conditioning/distribution equipment and networking equipment in the new 1129
rack. The hardware is identical to the setup in the 1119 rack and includes:

Tripp Lite SU5KRT3UTF - 208V, 5kVA on-line UPS with 120V transformer
CyberPower PDU20M2F12R - metered power distribution unit,
ELOG V3.1.3-7933898