Entry  Wed Oct 2 13:38:00 2024, Cynthia, Update, Interferometer Simulations, cavity scan with averaged O4 ETM coating as plume O5plumevsCoating.pngO5CoatAvgpt5.pngO5AVgcoatingFROSTIpt5.PNG
 
Entry  Tue Feb 25 10:56:25 2025, Cynthia, Update, Interferometer Simulations, mirror coating added for simulation rerun updats_(3).pdf
I have tried to rerun the simulation on finesse after adding the mirror coating. The result has a large fluctuation in required input power vs arm power
that is concerning. I am currently working on potentially resolve this issue and get a reasonable graph before I proceed to optimizing the thermal maps.
Entry  Tue Mar 4 10:18:43 2025, Cynthia, Update, Interferometer Simulations, attempted to remove curvature and tilt for the coating  3_4_updates.pdf
 
Entry  Tue Mar 11 11:28:52 2025, Cynthia, Update, Interferometer Simulations, flattening mirror to study power discrepency updates_3_11_(1).pdf
 
Entry  Tue Apr 15 11:37:17 2025, Cynthia, Update, Interferometer Simulations, Finishing up mirror coating map step updates_4_15_2025.pdf
 
Entry  Thu Feb 19 12:34:18 2026, Cynthia, Update, Interferometer Simulations, Point absorber simulation update_2_18.pdf
 
Entry  Thu Mar 12 12:48:58 2026, Cynthia, Update, Interferometer Simulations, New Result of point absorber+miscentering Untitled_presentation_(1).pdf
 
Entry  Thu Apr 9 12:50:28 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass  
https://docs.google.com/presentation/d/1vJPZ9H_umgsZacCLgsqAUZWjn7-6l77np3E_YgaSy_M/edit?usp=sharing
Entry  Thu Apr 16 12:53:30 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass  4_16_update.pdf
 
Entry  Thu Apr 23 12:47:05 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass  4_23_26.pdf
 
Entry  Thu Apr 30 13:23:55 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass  scan_5-8.png
frequency locations of 5-8th order mode across arm power of 0-800kW
Entry  Thu May 7 13:35:14 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass  Screenshot_2026-05-07_133453.png
 
Entry  Thu May 14 12:37:17 2026, Cynthia, Update, Measuring Noise in Interferometer, O5 Test mass design update_5_13.pdf
 
Entry  Thu May 14 13:42:57 2026, Cynthia, Update, Interferometer Simulations, less-roll-off coating  e6caa8cf-2a96-49d8-a8b7-b84feab55404.png
 
Entry  Thu May 28 12:54:38 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass  5_28_update_(1).pdf
 
Entry  Thu Jun 4 13:30:46 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass Presentation Nonspherical_polishing_profile_design_recommendation.pdf
 
Entry  Thu Jun 25 13:45:11 2026, Cynthia, Update, Interferometer Simulations, Poster Draft 
https://docs.google.com/presentation/d/1tpYjs-gOfZgFFkffU0kv7rYKHu0xtfPyMZqF1qXHIOQ/edit?usp=sharing
Entry  Tue Aug 26 12:45:41 2025, Christina, Ma, Tyler, Update, CDS, RIN Update 
Slides
Entry  Fri Jun 27 15:38:22 2025, Christina, Update, TCS, FROSTI Reconstruction IMG_4009.png
 [Tyler, Ma, Christina, Luke] 

 We threaded the wiring of the heater elements through the reflective surfaces and were able to attach each piece with the Macor spacers and
connect both sides. We used the guide rails and screws to ensure proper alignment. The only necessary step left is to add the additional external screws
Entry  Tue Jul 1 11:04:00 2025, Christina, Update, TCS, FROSTI Reconstruction II IMG_4042.png
 [Ma, Tyler, Christina] 

 Finished external reconstruction of the FROSTI by installing all the pins to the 2 DB 25 connectors. To ensure everything
was operating correctly, we did electrical testing by testing continuity and by checking each of the heater elements' RTD and power resistance values and
comparing them to what was tabulated in January. Additionally, we organized the wires and added the stands. 
Entry  Mon Jul 7 16:39:18 2025, Christina, Update, TCS, Pomona Box Drawings pbdwg1.PDFpbdwg2.pdf
 Below are the drawings for the pomona box modifications 
Entry  Thu Jul 10 16:41:18 2025, Christina, Update, TCS,  2994921113032912040.JPG4717009101108174053.JPG5782646701589802125.JPG
 [Christina, Ma, Tyler] 

 Pomona Box completed and is now on the server rack in 1119. Additionally, the photodetectors were connected to the
box and set up in front of the heater elements. 
Entry  Tue Jul 15 10:40:23 2025, Christina, Update, TCS,  rpon.png
 [Christina, Ma, Tyler] 

 Yesterday, Ma and I started taking data for the PSD/CSD measurements while the photodetectors and one of the heater
elements are on (8) and are using the Red Pitaya to compare it to the data we took for the same measurements on the CyMAC. It will be finished Wednesday
morning, and then we plan on starting to take additional recordings in order to conduct the same type of comparison for the dark noise measurements. 
Entry  Tue Jul 15 13:13:48 2025, Christina, Update, TCS, Photodetector optical post assembly pdreassembly.png
 
Entry  Tue Jul 22 12:20:29 2025, Christina, Update, TCS,  PSDch0-15.pngCSD2hz_16hz.png
 [Ma, Christina, Tyler] 
 Figure 1 shows the following PSDs for channels 0-15 from the 14 hour test. Figure 2 shows the reduced chi squared and
CSD plots for both the 2 Hz and 16 Hz resolutions.
Entry  Tue Jul 29 12:30:00 2025, Christina, Update, TCS, 260 hour ADC update CSD_06_28_25_270hr.png
 [Ma, Christina, Tyler] 

ADC CyMAC 260 hr, 8192Hz sampling rate channels V3 and Vref6
Entry  Mon Aug 11 22:19:50 2025, Christina, Update, TCS, Red Pitaya Data Streaming 3.png3-1.png
 [Ma, Tyler, Christina] 

 This past week, we were able to set up the data streaming for continuous acquisition to the PCs, and can conduct the initial tests now. We were
able to do this by:


 Installing the correct OS ecosystems to each Red Pitaya 
 Installing the terminal streaming client 
Entry  Tue Aug 12 13:46:56 2025, Christina, Update, ,  3.png3-1.png
 
Entry  Tue Aug 19 12:08:40 2025, Christina, Update, TCS, RP Initial vs CyMAC Plot Comparisons 11hzCSD.png11hzstrain.png
[Tyler, Ma, Christina]


These are the frequency averaged and veto binned plots for the initial Red Pitaya and CyMAC systems.
Entry  Thu Jul 27 10:18:43 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification HOM_RH_1_8_Unit_Modification_Graphs.pdf
Attached are updated graphs of the irradiance distribution from the 1/8th ring heater units (extruded and reduced in length). 
Entry  Fri Jul 28 17:45:45 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification, Friday 7/28 HOM_RH_Simulation_Progress.pdf
Updated 1/8th Heater simulation modification graphs. Slides 7, 10, 16-19 are new additions.
Entry  Tue Aug 1 16:22:35 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification, Tuesday 8/1 HOM_RH_Simulation_Progress_80123.pdf
Slides 20-33 are newly added (data/graphs from parameter sweep feature-1/8th heater unit length varied from 10% of original to 100% of original). 
Entry  Thu Aug 10 14:13:38 2023, Celeste, Update, TCS, 8/10/23, Simulation Graphical Progress Simulation_Progress__8_10_23.pdf
 
Entry  Fri Aug 11 10:57:20 2023, Celeste, Update, TCS, 8/11/23 Simulation Progress Simulation_Progress__1_32nd_Model_(1).pdf
 
Entry  Tue Aug 15 16:10:06 2023, Celeste, Update, TCS, 8/15/2023 Simulation Progress Simulation_Progress__1_32nd_Model_(2).pdf
 
Entry  Tue Jun 3 11:54:06 2025, Cece Ochoa, Update, , CE Cavity Design Update CE_Arm_Cavity_.pdf
Update on the design for the CE Cavity Mirrors
Entry  Thu Nov 6 12:39:43 2025, Cece Ochoa, Update, ELOG, CE Cavity Design Update base_0_6_plot.pdfbase_0_7_plot.pdf
Updated mode placements and ROC. No thermal effects added yet.
Entry  Thu Nov 20 13:03:58 2025, Cece Ochoa, Update, ELOG, CE Cavity Design Update 11_20_update.pdf
Update on grouping 0+8th Order Modes
Entry  Thu Jan 29 12:46:22 2026, Cece Ochoa, Update, , CE Cavity Design Update (4) 
Update for CE Cavity Arms + Modes 


https://docs.google.com/presentation/d/1-dXYylkAbNpHR4WVCx9Q8ryL_xGlH-JSSLXEUQg6b7Q/edit?usp=sharing  
Entry  Thu Feb 12 12:53:51 2026, Cece Ochoa, Update, ELOG, CE Cavity Design Update 2_12_short_update.pdf
Update on HOM placement w/ cavity locking. Still verifying mode placement

RoC: 28340m and 26874m
Entry  Thu Mar 12 13:18:49 2026, Cece Ochoa, Update, Interferometer Simulations, CE Cavity Design Update 
Animation showing how modes shift in the CE arm cavity for radius 27581m and mirror radius of40cm as the laser powers up the 1.5 MW. 

https://drive.google.com/file/d/1UNvWmONWYDzroelC5j_Z2emGSotyzcCC/view?usp=sharing
Entry  Thu Apr 23 11:32:48 2026, Cece Ochoa, Update, Interferometer Simulations, CE Cavity Design Update 
Update on CE Mirror RoC, simulation with FROSTI and cavity locking

View Presentation
Entry  Mon Jun 15 22:30:09 2026, Cece Ochoa, Infrastructure, Inventory, Optics Inventory  Optics_Inventory_(1).xlsxOptics_Inventory_-_Sheet1.pdf
Spreadsheet of all tabletop optical parts in 1129 (Cabinet 1) 
linked here
 
Note that a couple of the optical posts still need to be measured for their diameters. Images are located in a Google Folder and
linked on the spreadsheet so to view them you have to go to the Google Sheet. 
Entry  Thu Jul 2 11:09:09 2026, Cece Ochoa, Update, Inventory, PPE/Cleaning Supplies Inventory 
[Shane, Cece]

Shane has made a Google Form to take inventory of  PPE
and cleaning supplies.

Additionally, she has made a form for purchase
order requests. 

Please use the first form to take inventory when NEW supplies arrive, and in future cleanings use the form to take inventory so
Entry  Thu Jun 25 13:21:31 2026, Cece, Update, Inventory, Optics Inventory Update 
[Shane, Ma, Cece]

Updated optics inventory here.

Changes made: removed thrown out optics from sheet, added new optics found during Ma and Shane's cleaning, updated optics location (now all in 1119
Entry  Tue Jun 21 18:31:49 2022, Cassidy and Phoebe, Update, Cameras, IR Absorbing Screen and FLIR Camera Setup IMG_6751.pngIMG_1146.pngIMG_6756.png
Today we set up the IR absorbing screen and the camera on the optical table, as well as tested that the camera was functioning as expected (picking up heat
sources beyond the screen).

Screen Setup
The screen was set up by clamping it between two rectangular posts on each side. First, two posts
were set up with 22 in. between them (thus allowing the screen to span a total distance of up to 24 in. when clamped down). To best stabilize the screen
Entry  Tue Jul 26 14:10:35 2022, Cassidy, Update, Cameras, Optical Post Replacement and Realignment YAxisAlignment.pngXRotZAlignment.pngNewOpticalPost.png
Today I replaced the 3" optical post that the camera rests on with a 2" optical post in order for the screen to correctly fill out the camera's FOV. The
3" post is now in the glass optics cabinet next to the FLIR camera configuration box, wrapped in the protective materials from the 2" post for safekeeping.


There were no issues with the physical replacement of the post, except that the fork clamp on the post needs to be on one of the perpendicular,
Entry  Thu Apr 27 16:23:44 2023, Cao, Pamella and Julian, Physics, VAC, Installing vacuum system (cont.) IMG_0139.pngIMG_0136.png

 
[Pamella, Cao and Julian, Shane] 


 Particles account 
 10:37 am: Starting the particles account 

 
Zone 3:

 0.3u: 1662 
 0.5u: 872 
 1.0u: 415 


  Zone 4:

 0.3u: 831 

0.5u: 124 
 1.0u: 0 



 11:14 am: Start removal of calibrated leak to install 45 deg elbow 
 11:21 am:
Entry  Mon Oct 3 17:21:39 2022, Cao, Update, TCS, Inspection of macor parts 7x
The macor parts arrived and inspected today. These include:


 Macor spacer (drawing:  LIGO_Redesign_Macor_Spacer_Drawing_v4.pdf 
attached below), quantities: 40

 No defects, damages observed 
 Parts are free from grease/ machining fluid 
 Wall thickness
of 1 mm appear to provide sufficient stiffness to part 
 Images of parts:  Macor_spacer_0.jpg, Macor_spacer_1.jpg  


Entry  Tue Apr 11 13:15:40 2023, Cao, Infrastructure, Clean & Bake, Nitrogen gas tank replaced 
The nitrogen gas tank has been replaced with a new unit. The new tank is ultra pure nitrogen (>99.9% nitrogen).

The new tank has been placed and secured
to the rack where the old one is; cap is removed and regulator is reinstalled onto the new tank. 
ELOG V3.1.3-7933898