ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Entry  Thu Jan 22 10:10:31 2026, Jon, Infrastructure, General, Lab floor plans Pre-Feb-2026.pngPost-Feb-2026.png
    Reply  Thu Jan 22 13:18:12 2026, Pooyan, Infrastructure, General, Lab floor plans 
    Reply  Thu Feb 5 11:42:47 2026, Jon, Infrastructure, General, Lab floor plans image.jpgimage_1.jpgimage_3.jpg
Message ID: 676     Entry time: Thu Feb 5 11:42:47 2026     In reply to: 670
Author: Jon 
Type: Infrastructure 
Category: General 
Subject: Lab floor plans 

[Audrey, Cece, Jon, Ma, Mary, Michael, Pooyan, Tyler, Shane]

We have completed the preliminary reorganization of our Physics 1119 lab space. This includes:

  • Moving all cabinets to their final positions
  • Clearing out all equipment from the cleanroom in prep for HVAC work, and storing them in either the HEPA cabinet or double-bagging in regular storage.
  • Moving all non-essential equipment into other lab spaces.
  • Wrapping vacuum system and VLC for protection
  • Removing all ceiling tiles and fans from the ceiling of the cleanroom
  • Moving the cleanroom frame towards the front of the room.

Prepping the new clean-and-bake station in 1125 will begin within the next week, along with the construction of the stainless steel table planned to be put into the cleanroom.

Quote:
Attached are the starting and final floor plans for the February 2026 expansion into the Physics 1125 lab.

 

Attachment 1: image.jpg  1.020 MB  | Hide | Hide all
image.jpg
Attachment 2: image_1.jpg  702 kB  | Hide | Hide all
image_1.jpg
Attachment 3: image_3.jpg  860 kB  | Hide | Hide all
image_3.jpg
ELOG V3.1.3-7933898