ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Entry  Thu Jan 22 10:10:31 2026, Jon, Infrastructure, General, Lab floor plans Pre-Feb-2026.pngPost-Feb-2026.png
    Reply  Thu Jan 22 13:18:12 2026, Pooyan, Infrastructure, General, Lab floor plans 
Message ID: 670     Entry time: Thu Jan 22 10:10:31 2026     Reply to this: 672
Author: Jon 
Type: Infrastructure 
Category: General 
Subject: Lab floor plans 
Attached are the starting and final floor plans for the February 2026 expansion into the Physics 1125 lab.
Attachment 1: Pre-Feb-2026.png  157 kB  | Hide | Hide all
Pre-Feb-2026.png
Attachment 2: Post-Feb-2026.png  181 kB  | Hide | Hide all
Post-Feb-2026.png
ELOG V3.1.3-7933898