ligo-ex
ligo-ds
Richardson Lab Experimental Log, Page 12 of 15
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded | Collapse |
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Infrastructure
Physics
-- Category --
General
CDS
TCS
VAC
DAQ
Safety
Computers
Scripts/Programs
Electronics
Cameras
Wiki
ELOG
Equipment Loan
Lore
VLC Electronics
Clean & Bake
Cleanroom
VLC Update
FLIR
Measuring Noise in Interferometer
Interferometer Simulations
Inventory
731 Entries
Goto page
Previous
1
,
2
,
3
...
11
, 12,
13
,
14
,
15
Next
Tue Feb 27 09:06:29 2024, Cynthia , Update, Interferometer Simulations, cavity scan with higher order input laser
Mon Apr 22 15:06:33 2024, Cynthia , Update, Interferometer Simulations, cavity scan update
Mon Jun 24 14:28:51 2024, Cynthia , Update, Interferometer Simulations, SIS cavity with thermal effect
Mon Jul 1 15:19:42 2024, Cynthia , Update, Interferometer Simulations, O4 and O5 mirror cavity scans with thermal effect
Mon Jul 15 15:44:52 2024, Cynthia , Update, Interferometer Simulations, performed cavity scans with thermal effects and ring heater
Mon Aug 12 17:09:04 2024, Cynthia , Update, Interferometer Simulations, O4 vs O5 cavity scans with ITM plume guess or ETM
Mon Aug 26 14:42:04 2024, Cynthia , Update, Interferometer Simulations, current status on cavity scan with effects of FROSTI
Mon Sep 16 15:18:59 2024, Cynthia , Update, Interferometer Simulations, a breakdown of FROSTI and thermal effects and the resulting cavity scan
Mon Sep 23 15:00:41 2024, Cynthia , Update, Interferometer Simulations, corrections on assumption for O5 coating
Tue Jun 3 12:16:13 2025, Cynthia , Update, Interferometer Simulations, Point absorber simulation on radially averaged profile
Thu Feb 5 13:34:13 2026, Cynthia , Update, Interferometer Simulations, Point absorber + miscentering simulation
Mon Apr 15 15:25:10 2024, Cynthia, Update, Interferometer Simulations, progress on simulation so far
Mon Jun 3 14:59:44 2024, Cynthia, Update, Interferometer Simulations, Created cavity scan with LG modes
Mon Aug 19 07:11:55 2024, Cynthia, Update, Interferometer Simulations, cavity scans with FROSTI effects
Wed Oct 2 13:38:00 2024, Cynthia, Update, Interferometer Simulations, cavity scan with averaged O4 ETM coating as plume
Tue Feb 25 10:56:25 2025, Cynthia, Update, Interferometer Simulations, mirror coating added for simulation rerun
Tue Mar 4 10:18:43 2025, Cynthia, Update, Interferometer Simulations, attempted to remove curvature and tilt for the coating
Tue Mar 11 11:28:52 2025, Cynthia, Update, Interferometer Simulations, flattening mirror to study power discrepency
Tue Apr 15 11:37:17 2025, Cynthia, Update, Interferometer Simulations, Finishing up mirror coating map step
Thu Feb 19 12:34:18 2026, Cynthia, Update, Interferometer Simulations, Point absorber simulation
Thu Mar 12 12:48:58 2026, Cynthia, Update, Interferometer Simulations, New Result of point absorber+miscentering
Thu Apr 9 12:50:28 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass
Thu Apr 16 12:53:30 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass
Thu Apr 23 12:47:05 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass
Thu Apr 30 13:23:55 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass
Thu May 7 13:35:14 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass
Thu May 14 12:37:17 2026, Cynthia, Update, Measuring Noise in Interferometer, O5 Test mass design
Thu May 14 13:42:57 2026, Cynthia, Update, Interferometer Simulations, less-roll-off coating
Thu May 28 12:54:38 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass
Thu Jun 4 13:30:46 2026, Cynthia, Update, Interferometer Simulations, O5 Test mass Presentation
Thu Jun 25 13:45:11 2026, Cynthia, Update, Interferometer Simulations, Poster Draft
Thu Jul 16 13:14:26 2026, Cynthia, Update, Interferometer Simulations, LIGO pre-figuring team meeting summary
Wed Jul 29 23:56:29 2026, Cynthia, Update, Interferometer Simulations, Pre-figuring meeting 7/28 summery
Tue Aug 26 12:45:41 2025, Christina, Ma, Tyler, Update, CDS, RIN Update
Fri Jun 27 15:38:22 2025, Christina, Update, TCS, FROSTI Reconstruction
Tue Jul 1 11:04:00 2025, Christina, Update, TCS, FROSTI Reconstruction II
Mon Jul 7 16:39:18 2025, Christina, Update, TCS, Pomona Box Drawings
Thu Jul 10 16:41:18 2025, Christina, Update, TCS,
Tue Jul 15 10:40:23 2025, Christina, Update, TCS,
Tue Jul 15 13:13:48 2025, Christina, Update, TCS, Photodetector optical post assembly
Tue Jul 22 12:20:29 2025, Christina, Update, TCS,
Tue Jul 29 12:30:00 2025, Christina, Update, TCS, 260 hour ADC update
Mon Aug 11 22:19:50 2025, Christina, Update, TCS, Red Pitaya Data Streaming
Tue Aug 12 13:46:56 2025, Christina, Update, ,
Tue Aug 19 12:08:40 2025, Christina, Update, TCS, RP Initial vs CyMAC Plot Comparisons
Thu Jul 27 10:18:43 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification
Fri Jul 28 17:45:45 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification, Friday 7/28
Tue Aug 1 16:22:35 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification, Tuesday 8/1
Thu Aug 10 14:13:38 2023, Celeste, Update, TCS, 8/10/23, Simulation Graphical Progress
Fri Aug 11 10:57:20 2023, Celeste, Update, TCS, 8/11/23 Simulation Progress
Goto page
Previous
1
,
2
,
3
...
11
, 12,
13
,
14
,
15
Next
ELOG V3.1.3-7933898