454
|
Wed Oct 2 13:38:00 2024 |
Cynthia | Update | Interferometer Simulations | cavity scan with averaged O4 ETM coating as plume | |
  |
|
526
|
Tue Feb 25 10:56:25 2025 |
Cynthia | Update | Interferometer Simulations | mirror coating added for simulation rerun | I have tried to rerun the simulation on finesse
after adding the mirror coating. The result
has a large fluctuation in required input |
|
|
530
|
Tue Mar 4 10:18:43 2025 |
Cynthia | Update | Interferometer Simulations | attempted to remove curvature and tilt for the coating | |
|
|
540
|
Tue Mar 11 11:28:52 2025 |
Cynthia | Update | Interferometer Simulations | flattening mirror to study power discrepency | |
|
|
554
|
Tue Apr 15 11:37:17 2025 |
Cynthia | Update | Interferometer Simulations | Finishing up mirror coating map step | |
|
|
686
|
Thu Feb 19 12:34:18 2026 |
Cynthia | Update | Interferometer Simulations | Point absorber simulation | |
|
|
692
|
Thu Mar 12 12:48:58 2026 |
Cynthia | Update | Interferometer Simulations | New Result of point absorber+miscentering | |
|
|
697
|
Thu Apr 9 12:50:28 2026 |
Cynthia | Update | Interferometer Simulations | O5 Test mass | https://docs.google.com/presentation/d/1vJPZ9H_umgsZacCLgsqAUZWjn7-6l77np3E_YgaSy_M/edit?usp=sharing |
|
|
698
|
Thu Apr 16 12:53:30 2026 |
Cynthia | Update | Interferometer Simulations | O5 Test mass | |
|
|
703
|
Thu Apr 23 12:47:05 2026 |
Cynthia | Update | Interferometer Simulations | O5 Test mass | |
|
|
707
|
Thu Apr 30 13:23:55 2026 |
Cynthia | Update | Interferometer Simulations | O5 Test mass | frequency locations of 5-8th order mode across
arm power of 0-800kW |
|
|
711
|
Thu May 7 13:35:14 2026 |
Cynthia | Update | Interferometer Simulations | O5 Test mass | |
|
|
712
|
Thu May 14 12:37:17 2026 |
Cynthia | Update | Measuring Noise in Interferometer | O5 Test mass design | |
|
|
713
|
Thu May 14 13:42:57 2026 |
Cynthia | Update | Interferometer Simulations | less-roll-off coating | |
|
|
714
|
Thu May 28 12:54:38 2026 |
Cynthia | Update | Interferometer Simulations | O5 Test mass | |
|
|
716
|
Thu Jun 4 13:30:46 2026 |
Cynthia | Update | Interferometer Simulations | O5 Test mass Presentation | |
|
|
723
|
Thu Jun 25 13:45:11 2026 |
Cynthia | Update | Interferometer Simulations | Poster Draft | https://docs.google.com/presentation/d/1tpYjs-gOfZgFFkffU0kv7rYKHu0xtfPyMZqF1qXHIOQ/edit?usp=sharing |
|
|
635
|
Tue Aug 26 12:45:41 2025 |
Christina, Ma, Tyler | Update | CDS | RIN Update | Slides |
|
|
600
|
Fri Jun 27 15:38:22 2025 |
Christina | Update | TCS | FROSTI Reconstruction | [Tyler, Ma, Christina, Luke]
We threaded the wiring of the
heater elements through the reflective surfaces |
|
|
601
|
Tue Jul 1 11:04:00 2025 |
Christina | Update | TCS | FROSTI Reconstruction II | [Ma, Tyler, Christina]
Finished
external reconstruction of the FROSTI by
installing all the pins to the 2 DB 25 connectors. |
|
|
604
|
Mon Jul 7 16:39:18 2025 |
Christina | Update | TCS | Pomona Box Drawings | Below are the drawings for the pomona
box modifications |
 |
|
608
|
Thu Jul 10 16:41:18 2025 |
Christina | Update | TCS | | [Christina, Ma, Tyler]
Pomona
Box completed and is now on the server rack
in 1119. Additionally, the photodetectors |
  |
|
611
|
Tue Jul 15 10:40:23 2025 |
Christina | Update | TCS | | [Christina, Ma, Tyler]
Yesterday,
Ma and I started taking data for the PSD/CSD
measurements while the photodetectors and |
|
|
614
|
Tue Jul 15 13:13:48 2025 |
Christina | Update | TCS | Photodetector optical post assembly | |
|
|
615
|
Tue Jul 22 12:20:29 2025 |
Christina | Update | TCS | | [Ma, Christina, Tyler]
Figure
1 shows the following PSDs for channels 0-15
from the 14 hour test. Figure 2 shows the |
 |
|
619
|
Tue Jul 29 12:30:00 2025 |
Christina | Update | TCS | 260 hour ADC update | [Ma, Christina, Tyler]
ADC CyMAC
260 hr, 8192Hz sampling rate channels V3
and Vref6 |
|
|
624
|
Mon Aug 11 22:19:50 2025 |
Christina | Update | TCS | Red Pitaya Data Streaming | [Ma, Tyler, Christina]
This past week, we were able to
set up the data streaming for continuous |
 |
|
629
|
Tue Aug 12 13:46:56 2025 |
Christina | Update | | | |
 |
|
631
|
Tue Aug 19 12:08:40 2025 |
Christina | Update | TCS | RP Initial vs CyMAC Plot Comparisons | [Tyler, Ma, Christina]
These are the
frequency averaged and veto binned plots
for the initial Red Pitaya and CyMAC systems. |
 |
|
173
|
Thu Jul 27 10:18:43 2023 |
Celeste | Update | TCS | Graphical Updates to HOM RH Modification | Attached are updated graphs of the irradiance
distribution from the 1/8th ring heater units
(extruded and reduced in length). |
|
|
180
|
Fri Jul 28 17:45:45 2023 |
Celeste | Update | TCS | Graphical Updates to HOM RH Modification, Friday 7/28 | Updated 1/8th Heater simulation modification
graphs. Slides 7, 10, 16-19 are new additions. |
|
|
187
|
Tue Aug 1 16:22:35 2023 |
Celeste | Update | TCS | Graphical Updates to HOM RH Modification, Tuesday 8/1 | Slides 20-33 are newly added (data/graphs
from parameter sweep feature-1/8th heater
unit length varied from 10% of original to |
|
|
200
|
Thu Aug 10 14:13:38 2023 |
Celeste | Update | TCS | 8/10/23, Simulation Graphical Progress | |
|
|
204
|
Fri Aug 11 10:57:20 2023 |
Celeste | Update | TCS | 8/11/23 Simulation Progress | |
|
|
209
|
Tue Aug 15 16:10:06 2023 |
Celeste | Update | TCS | 8/15/2023 Simulation Progress | |
|
|
586
|
Tue Jun 3 11:54:06 2025 |
Cece Ochoa | Update | | CE Cavity Design Update | Update on the design for the CE Cavity Mirrors |
|
|
659
|
Thu Nov 6 12:39:43 2025 |
Cece Ochoa | Update | ELOG | CE Cavity Design Update | Updated mode placements and ROC. No thermal
effects added yet. |
 |
|
663
|
Thu Nov 20 13:03:58 2025 |
Cece Ochoa | Update | ELOG | CE Cavity Design Update | Update on grouping 0+8th Order Modes |
|
|
675
|
Thu Jan 29 12:46:22 2026 |
Cece Ochoa | Update | | CE Cavity Design Update (4) | Update for CE Cavity Arms + Modes
https://docs.google.com/presentation/d/1-dXYylkAbNpHR4WVCx9Q8ryL_xGlH-JSSLXEUQg6b7Q/edit?usp=sharing
|
|
|
683
|
Thu Feb 12 12:53:51 2026 |
Cece Ochoa | Update | ELOG | CE Cavity Design Update | Update on HOM placement w/ cavity locking.
Still verifying mode placement
RoC: 28340m
and 26874m |
|
|
Draft
|
Thu Mar 12 13:18:49 2026 |
Cece Ochoa | Update | Interferometer Simulations | CE Cavity Design Update | Animation showing how modes shift in the CE
arm cavity for radius 27581m and mirror radius
of40cm as the laser powers up the 1.5 MW. |
|
|
702
|
Thu Apr 23 11:32:48 2026 |
Cece Ochoa | Update | Interferometer Simulations | CE Cavity Design Update | Update on CE Mirror RoC, simulation with FROSTI
and cavity locking
View Presentation |
|
|
717
|
Mon Jun 15 22:30:09 2026 |
Cece Ochoa | Infrastructure | Inventory | Optics Inventory | Spreadsheet of all tabletop optical parts
in 1129 (Cabinet 1)
linked here
Note that a couple |
 |
|
724
|
Thu Jul 2 11:09:09 2026 |
Cece Ochoa | Update | Inventory | PPE/Cleaning Supplies Inventory | [Shane, Cece]
Shane has made a Google Form
to take inventory of PPE
and cleaning supplies.
Additionally, |
|
|
722
|
Thu Jun 25 13:21:31 2026 |
Cece | Update | Inventory | Optics Inventory Update | [Shane, Ma, Cece]
Updated optics inventory here.
Changes made: removed thrown out optics |
|
|
6
|
Tue Jun 21 18:31:49 2022 |
Cassidy and Phoebe | Update | Cameras | IR Absorbing Screen and FLIR Camera Setup | Today we set up the IR absorbing screen and
the camera on the optical table, as well
as tested that the camera was functioning |
  |
|
9
|
Tue Jul 26 14:10:35 2022 |
Cassidy | Update | Cameras | Optical Post Replacement and Realignment | Today I replaced the 3" optical post that
the camera rests on with a 2" optical post
in order for the screen to correctly fill |
  |
|
81
|
Thu Apr 27 16:23:44 2023 |
Cao, Pamella and Julian | Physics | VAC | Installing vacuum system (cont.) |
[Pamella, Cao and Julian, Shane]
Particles account
10:37 am: Starting the particles account |
 |
|
11
|
Mon Oct 3 17:21:39 2022 |
Cao | Update | TCS | Inspection of macor parts | The macor parts arrived and inspected today.
These include:
Macor spacer
(drawing: LIGO_Redesign_Macor_Spacer_Drawing_v4.pdf |
7x |
|
67
|
Tue Apr 11 13:15:40 2023 |
Cao | Infrastructure | Clean & Bake | Nitrogen gas tank replaced | The nitrogen gas tank has been replaced with
a new unit. The new tank is ultra pure nitrogen
(>99.9% nitrogen).
The new tank has been |
|