Tue Jul 29 11:27:57 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#  
|
|
Tue Aug 5 12:21:04 2025, Liu, Update, Interferometer Simulations, FROSTI A# optimization
|
A# multi-ring FROSTI optimization |
Tue Aug 12 12:16:21 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
|
Multi-ring FROSTI optimization for A# with static polishing |
Tue Aug 12 13:32:43 2025, Liu, Update, Interferometer Simulations, 
|
Differences in Fused Silica parameters. |
Tue Aug 26 12:14:24 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI design for A# with ring heater optimization
|
Multi-ring FROSTI design for A# with ring heater optimization |
Tue Aug 26 12:18:36 2025, Michael, Update, Interferometer Simulations, Squeezing Plots for SRC Parameter Space  
|
I've run a few plots of observed squeezing in the LIGO interferometer to fully ensure that the point we have selected is the optimal point for squeezing.
Contrary to what I expected, there seems to be much more degenerate "optimal" configurations. While the toroidal case may be near optimal, it seems that
the solution we found for a non astigmatic beam is not the only one. I will further explore this space to find more optimal/tolerant positions, which I |
Tue Sep 2 12:41:33 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI design for A# with ring heater optimization
|
[Tyler, Liu]
Ring heater optimization, continued |
Tue Sep 9 12:13:38 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A# with grid search
|
Multi-ring FROSTI optimization based on IFO metrics for A# with grid search |
Tue Sep 16 12:18:09 2025, Liu, Update, Interferometer Simulations, Grid search optimization for single-ring FROSTI
|
Grid search optimization for single-ring FROSTI |
Tue Sep 16 12:47:29 2025, Xuesi Ma, Update, Interferometer Simulations, Frosti actuation impact analysis
|
Slides |
Tue Sep 23 12:39:29 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
|
|
Tue Sep 30 12:26:15 2025, Liu, Update, Interferometer Simulations, FROSTI optimization for A#
|
|
Thu Oct 9 12:18:14 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
|
|
Thu Jun 2 16:14:58 2022, Jon, HowTo, General, Custom conda environment on JupyterHub
|
Cross-linking instructions: How to run a Jupyter notebook in your custom Conda environment |
Mon Jul 11 14:29:45 2022, Jon, Omnistructure, General, HEPA filter installed
|
Today I unpacked and installed the new HEPA filter for the lab. It is an Omni CleanAir OCA1210 capable of 1200 CFM. This flow rate is sufficient to turn
over the air in the room once every 4 minutes, or 14 times per hour. Hopefully this will cut down on our particulate accumulation issues. |
Mon Jan 23 17:26:15 2023, Peter Carney, Update, General, Oven cleaning
|
Aiden and Cao
Turned on the oven to 120 deg C for 12 hours. After 12 hours, put it at 200 deg C for 48 hours. |
Thu Jan 26 18:58:25 2023, Aiden, Update, General, Oven Heating
|
Aiden cleaned the oven with methanol again and set the oven to 260 degC for 12 hours. |
Fri Jan 27 18:44:31 2023, Julian , Update, General, Vacuum Chanmber Cleaning
|
I used the IPA wipes to wipe down the inside of the chamber the best I could. I cleaned the main chamber but not any of the connecting joints. When I finished
I did a once over with a fresh wipe and found no residue. |
Fri Feb 3 13:04:04 2023, shane, Summary, General, clean room particle counts 1/25/23
|
Clean room count graphs for each zone (as of January 25, 2023) attached |
Mon Feb 6 20:02:32 2023, Julian, Update, General, Cleanroom Update
|
I wiped down the main table (including frame, legs, and transparent shelf) and workbench using alcohol wipes. Once I cleaned all of the surfaces, I used
the Hepa vacuum to pick up any fallen debris. |
Fri Feb 10 15:15:30 2023, Aiden, Update, General, Bagging First Batch
|
Aiden Bagged and Tagged the first batch of stainless steel parts shown on the google spread sheet.
1. Removed two parts from the oven.
2. Place them
in the ESD bag.
3. Seal bag with Kapton Tape.
4. Create label including part name and number underneath it.
5. Put label onto the side of the bag where
it is not sealed with tape.
6. Placed bagged items into clean room on work table.
ps. total bags in first batch = 4 |
Sat Feb 11 00:17:27 2023, Julian, Update, General, Vacuum Chamber Cleaning   
|
Today I finished wiping down the rest of the vacuum chamber, specifically focusing on the connecting ports and outside surface of the chamber. When I was
finished, I test wiped every surface of the chamber and took pictures confirming the current state of cleanliness; Attachment 1 "Wipes for top and bottom
of chamber's upper lip." Attachment 2 " Top and bottom of chamber's lower lip." Attachment 3 "Inside and Outside main chamber." Attachment 4 "Inside connecting |
Sat Feb 11 17:09:29 2023, Shane, Update, General, clean room particle counts 2/10/23  
|
Took a round of clean room counts after the latest clean of vacuum chamber on Feb 10. Used 60 second sample time, 5 samples for each of the 5 zones. Plots
attached for both occupied clean room (one person inside, attachment 1) and unoccupied clean room (empty attachment 2), as well as the raw data from the
particle counter (attachment 3). |
Mon Feb 13 18:57:53 2023, Aiden, Summary, General, Clean and Bake batch 2
|
Cleaned second batch of SS parts with liquinox for 20 min. Then put in oven for 5 steps; 1. Ramp, 100 degC, 15 min 2. Const, 100 degC, 30 min 3. Ramp, 200
degC, 30 min 4. Const, 200 degC, 48 hours 5. Ramp, 25 degC, (off). |
Fri Feb 17 19:12:39 2023, Aiden, Update, General, Clean and Bake batch 3 
|
Bagged and Tagged batch 2 parts by placing no more than two parts per ESD bag then taped them with kapton tape and tagged them with their name and part
number. Than placed them inside the clean room on the work bench. Total of 3 Bags used.
For Batch 3- Cleaned all copper gaskets with liquinox for 10
minutes, dried them off with nitrogen, then placed into oven where the are currently undergoing the following steps;
1. Ramp to 100 deg C in 15 minutes.
2. |
Tue Feb 21 17:51:04 2023, Aiden, Summary, General, Clean and Bake batch 4 
|
Bagged and Tagged batch 3 parts by placing no more than two part numbers per bag and taped them with kapton tape and labeled them with their name and part
number. Then placed them in the clean room on the work bench.
Cleaned batch 4 parts with liquinox and placed the into the oven for 5 steps;
1. Ramp
to 100 degC in 15 minutes.
2. Dwell at 100 degC for 30 minutes.
3. Ramp to 200 degC in 30 minutes.
4. Dwell at 200 degC for 48 hours.
5. Turn off and |
Thu Feb 23 13:32:55 2023, Shane, Update, General, Clean room floor particle counts
|
Here are the counts from the clean room floor today. The counts should be dated- the ones from today (2/23/23) are the last 8 in the chart. The first set
of 2 measurements from today were under the table by the clean room entrance, the next two were under the table by the vacuum chamber, the next two were
on the floor by the vacuum chamber lid, and the last two were on top of the table for comparison. All measurements were taken using 2 minute sample time. |
Thu Feb 23 21:12:33 2023, Julian, Update, General, Vacuum Chamber Cleaning  
|
Today I was able to come in and wipe down both sides of the vacuum chamber lid using the regular alcohol wipes and also wipes that were left to dry in the
fume hood then saturated with acetone. I managed to get a good amount of the residue off both the inside and outside surfaces of the lid, then did a test
wipe of both sides using acetone-soaked wipes; pictures of the wipes are attached below. Once I finished with the lid, I used another acetone wipe to test |
Mon Feb 27 17:09:04 2023, Pamella , Update, General, Vacuum Chamber Cleaning 
|
Pamella and Julian finished cleaning the interior of the chamber, chamber lid, and the table. We found some black residue on the side of the table but not
sure what the issue is. A picture of the specific area of the table that is giving off the black residue is attached below. The next step from here would
be to flip the chamber on its side and finish the cleaning the exterior. |
Tue Feb 28 13:53:17 2023, Pamella, Update, General, Vacuum chamber cleaning   
|
Pamella, Dr. Richardson and Dr.Cao finished checking and cleaning the interior of the chamber, chamber lid, and exterior of the chamber with Vectra Alpha
wipes, IPA and in some parts we used acetone . We flip the chamber and put chamber on the table again. A picture of the specific situation is attached
below. The next step from here would be to finish the cleaning the floor .
The black residues on the side of the table probably is some reaction between |
Tue Feb 28 19:37:22 2023, Aiden, Summary, General, Clean and Bake batch 5  
|
Bagged and Tagged batch 4 parts by placing no more than two part numbers per bag and taped them with kapton tape and labeled them with their name and part
number. Then placed them in the clean room on the work bench. Cleaned batch 5 part (Viton O-Ring) with liquinox and placed the into the oven for 5 steps;
1. Ramp to 100 degC in 15 minutes. 2. Dwell at 100 degC for 30 minutes. 3. Ramp to 180 degC in 30 minutes. 4. Dwell at 180 degC for 48 hours. 5. Turn off |
Thu Mar 2 20:53:56 2023, Julian, Update, General, Cleanroom Update
|
Today Pamella and Julian began the final cleaning of the cleanroom, starting with the HEPA vacuuming and mopping then wiping down every surface of the laser
table. We wiped the main tabletop as well as the legs, but we were unable to completely wipe down the upper frame of the table before we had to leave.
For next steps, Julian will come in on Friday and finish cleaning the frame, then both of us will come in on Monday to finish the final cleaning. |
Fri Mar 3 19:13:33 2023, Aiden, Summary, General, Clean and Bake Batch 6 
|
Started to clean the dirtiest of the valves. I could not finish but I definitely made good progress on it. The MDC valve is very dirty and there are many
places I could not reach with my fingers. I used Acetone and IPA for this first round of cleaning on it.
I also was going to bag the viton O-Ring from
the previous Batch, however it seems to have broken during the bake and I am leaving it inside the oven for now. |
Sat Mar 4 00:34:46 2023, Julian, Update, General, Cleanroom Update
|
Today I was able to finish cleaning the frame of the laser table, and for good measure I wiped down the tabletop and exterior of the vacuum chamber when
I was finished. I was also able to go through and wipe down the bags containing the vacuum parts as well as the tabletop of the workbench. |
Mon Mar 6 15:32:58 2023, Jon, Infrastructure, General, Cabinet installation completed 
|
Jon, Cao, Peter
This morning Facilities delivered and installed two new cabinets with sliding glass doors.
The smaller of the two (36" W x 13" D x 84" H) has been installed in the Clean & Bake area adjacent the flow bench. The larger one (48" x 16" |
Mon Mar 6 18:48:43 2023, Pamella, Update, General, Cleanroom update  
|
Today Pamella and Julian finished cleaning of the new lab cabinets. Also we wiped the computer and put inside the cleanroom so now the computer is not
move out side anymore.
We saw some dirty parts in the cleanroom floor again and is possible for the next step we should be clearing the floor one more
time.
Possible is necessary order more IPA wipes for keep cleaning in nexts weeks.
A photos of the cabinets and the computer are attached below. |
Wed Mar 8 19:29:00 2023, Aiden, Summary, General, Clean and Bake batch 7 
|
Today gave another cleaning to the MDC gate valve. It is still very dirty an will need more cleaning. I also cleaned the other 3 valves and the argon leak.
These are also in bags inside the clean room. I cleaned them by hand with IPA wipes and had to specifically give the MDC up to air valve a harder clean
with acetone as it was not getting clean with the IPA. This valve still has a ring around the face as shown in the first image. Be very cautious when moving |
Thu Mar 9 13:51:42 2023, Shane, Update, General, Clean room counts 3/9/23 
|
Here's the clean room counts from this morning. Also attached is rough diagram of where the five zones are in the clean room. Counts taken with 2 minute
sample time, three samples in each zone. |
Tue Mar 14 18:21:41 2023, Aiden, Summary, General, Clean and Bake batch 8
|
Starting off Peter and I refilled the deionized water barrel.
Then Aiden Cleaned and Bake the FROSTI arms and bases in liquinox for 5 minutes. Then placed
them in the oven where they will undergo the following steps;
1. Ramp to 100 degC in 15 min.
2. Dwell at 100 degC for 30 min.
3. Ramp to 120 degC in
30 min.
4. Dwell at 120 degC for 48 hours.
5. OFF
Also cleaned the 2.75 MDC Gate valve for 20 minutes (10 minutes each side) in liquinox. It looks |
Fri Mar 17 19:46:39 2023, Aiden, Summary, General, Clean and Bake batch 9 
|
Bagged and Tagged the reflector arms and bases and placed them inside the clean room. Total of 2 bags used. Cleaned and Baked parts in batch 9 on the spread
sheet and used the following procedure;
1. Ramp to 100 degC in 15 min.
2. Dwell at 100 degC for 30 min.
3. Ramp to 200 degC in 30 min.
4. Dwell at
200 degC for 48 hours.
5. OFF
Also soaked the 2.75" CF gate valve in acetone to try and clean the open threads around the part. Then cleaned it in |
Wed Mar 22 15:25:00 2023, Shane, Update, General, Clean room recertification particle counts
|
Attached are the five zone particle measurements for the clean room now that the fan speeds have been set to MEDIUM. 2 min sample time, 3 samples per zone.
The occupied clean room measurements were unusual in that they generally got larger towards minute 6 instead of settling and going to zero, and for this
reason didn't stay beneath the class 5 requirement at the end of the samples. The unoccupied counts look more similar to what was expected, and generally |
Thu Mar 23 18:40:08 2023, Julian, Update, General, Cleanroom Update
|
Today Pamella and I came in to Hepa vacuum and mop the floor of the cleanroom for general maintenance. |
Fri Mar 24 13:36:17 2023, Pamella, Update, General, Clean and Bake batch 10   
|
Today I bagged and tagged batch 10.
I wiped the RGA vacuum component for around 25 minutes after that I bagged and tagged this part and put inside the
cleanroom. The RGA vacuum component have a big size and because off that i used the big bag.
I wiped one power cable (2 meters), bagged and tagged that
and inside the cleanroom.
For the parts in the oven, a bunch of screws, I bagged and tagged the screws and put inside the cleanroom.
I put photos below |
Fri Mar 31 14:23:13 2023, Pamella, Update, General, Clean and bake batch 11
|
Today I bagged and tagged batch 11. I wiped the some tools: Centering ring alum( 2 pieces), reversible ratcheting, gasket removal (CF). After wiped that
I bagged and tagged this parts and put inside the cleanroom.
Also I wiped one power cable (3 meters), bagged and tagged that and inside the cleanroom.
I put photo below. |
Mon Apr 3 17:04:05 2023, Aiden, Summary, General, IDP Scroll Pump Assembly
|
Aiden installed the isolation valve and the exhaust silencer kits on the IDP-3 Scroll pump. The entire assembly still needs to be wiped down but overall
no residue came off when putting on the kits. |
Fri Apr 7 09:48:09 2023, Pamella, Update, General, Clean the system parts 7x
|
Pamella and Julian wiped and tag system parts for the vacuum machine. We used isopropyl and vectra wipes in the most import pieces:
Inverted magnetron
pirani gauge and the air cooling kit 81. The other parts we uses the IPA wipe for cleaning.
So for now we finished with ever system parts which was in
the gabinetes.
I put photos below. The photos is for all part we cleaning, tag and which puted inside the cleaning room. |
Tue Apr 11 17:56:15 2023, Pamella, Update, General, Lab cleaning
|
Today Pamella and Julian finished cleaning of the cleanroom, starting with the HEPA vacuuming, mopping and clearing all floor with IPA wipes. Also we wiped
down some surfaces of the blue table, computer table and the top of chamber. |
Wed Apr 12 10:53:02 2023, Aiden, Summary, General, Valve Cleaning
|
Bagged and Tagged the parts from batch 10 and placed them inside the clean room.
Then cleaned the last gate valve in liquinox for 20 minutes (10 minutes
each side). Then dried the valve, bagged, tagged, and placed it inside the clean room. |
Wed Apr 12 16:17:50 2023, shane, Update, General, Particle Counter moved
|
With the added height of the new docking station, the particle counter no longer fits under the Windows monitor in the electronics rack and has been moved
to the desk in the corner of the lab. |
Mon Apr 17 17:06:49 2023, Aiden, Summary, General, Clean and Bake batch 11
|
Cleaned the Viton O-Ring for the main chamber in Liquinox for 10 minutes. Then put it in the oven to back for;
1. Ramp to 100 degC in 15 min.
2. Dwell
at 100 degC for 30 min.
3. Ramp to 180 degC in 30 min.
4. Dwell at 180 degC for 24 hours.
5. Off
Note: There were three viton -rings in the bag sent
to us. I cleaned and baked 2 of them and left the third in the bag. |