Entry  Sat Mar 4 00:34:46 2023, Julian, Update, General, Cleanroom Update 
Today I was able to finish cleaning the frame of the laser table, and for good measure I wiped down the tabletop and exterior of the vacuum chamber when
I was finished. I was also able to go through and wipe down the bags containing the vacuum parts as well as the tabletop of the workbench.
Entry  Mon Mar 6 15:32:58 2023, Jon, Infrastructure, General, Cabinet installation completed IMG_0088.jpgIMG_0089.jpg
Jon, Cao, Peter
This morning Facilities delivered and installed two new cabinets with sliding glass doors.
The smaller of the two (36" W x 13" D x 84" H) has been installed in the Clean & Bake area adjacent the flow bench. The larger one (48" x 16"
Entry  Mon Mar 6 18:48:43 2023, Pamella, Update, General, Cleanroom update  203863E0-106A-465E-8D9C-461B0358FB60.jpeg779F360D-CAD0-4C49-AE0B-973F97F6D099.jpeg276B9F0C-6661-441F-AD34-D79DA61E1FC3.jpeg
Today Pamella and Julian finished cleaning of the new lab cabinets. Also we wiped the computer and  put inside the cleanroom so now the computer is not
move out side anymore.
We saw some dirty parts in the cleanroom floor again and is possible for the next step we should be clearing the floor one more
time. 
Possible is necessary order more IPA wipes for keep cleaning in nexts weeks.
A photos of the cabinets and the computer are attached below. 
Entry  Wed Mar 8 19:29:00 2023, Aiden, Summary, General, Clean and Bake batch 7 IMG_4180.jpgIMG_4182.jpg
Today gave another cleaning to the MDC gate valve. It is still very dirty an will need more cleaning. I also cleaned the other 3 valves and the argon leak.
These are also in bags inside the clean room. I cleaned them by hand with IPA wipes and had to specifically give the MDC up to air valve a harder clean
with acetone as it was not getting clean with the IPA. This valve still has a ring around the face as shown in the first image. Be very cautious when moving
Entry  Thu Mar 9 13:51:42 2023, Shane, Update, General, Clean room counts 3/9/23 particlecounts3.9.23.pdfclean_room_zones.JPG
Here's the clean room counts from this morning. Also attached is rough diagram of where the five zones are in the clean room. Counts taken with 2 minute
sample time, three samples in each zone.
Entry  Tue Mar 14 18:21:41 2023, Aiden, Summary, General, Clean and Bake batch 8 
Starting off Peter and I refilled the deionized water barrel.

Then Aiden Cleaned and Bake the FROSTI arms and bases in liquinox for 5 minutes. Then placed
them in the oven where they will undergo the following steps;
1. Ramp to 100 degC in 15 min.
2. Dwell at 100 degC for 30 min.
3. Ramp to 120 degC in
30 min.
4. Dwell at 120 degC for 48 hours.
5. OFF

Also cleaned the 2.75 MDC Gate valve for 20 minutes (10 minutes each side) in liquinox. It looks
Entry  Fri Mar 17 19:46:39 2023, Aiden, Summary, General, Clean and Bake batch 9 IMG-4208.jpgIMG-4209.jpg
Bagged and Tagged the reflector arms and bases and placed them inside the clean room. Total of 2 bags used. Cleaned and Baked parts in batch 9 on the spread
sheet and used the following procedure;

1. Ramp to 100 degC in 15 min.
2. Dwell at 100 degC for 30 min.
3. Ramp to 200 degC in 30 min.
4. Dwell at
200 degC for 48 hours.
5. OFF

Also soaked the 2.75" CF gate valve in acetone to try and clean the open threads around the part. Then cleaned it in
Entry  Wed Mar 22 15:25:00 2023, Shane, Update, General, Clean room recertification particle counts  counts3.22.23.pdf
Attached are the five zone particle measurements for the clean room now that the fan speeds have been set to MEDIUM. 2 min sample time, 3 samples per zone.
The occupied clean room measurements were unusual in that they generally got larger towards minute 6 instead of settling and going to zero, and for this
reason didn't stay beneath the class 5 requirement at the end of the samples. The unoccupied counts look more similar to what was expected, and generally
Entry  Thu Mar 23 18:40:08 2023, Julian, Update, General, Cleanroom Update 
Today Pamella and I came in to Hepa vacuum and mop the floor of the cleanroom for general maintenance. 
Entry  Fri Mar 24 13:36:17 2023, Pamella, Update, General, Clean and Bake batch 10 260AEB73-02D0-4635-93B3-B2EB3269FB84.jpeg59FD199A-A444-439A-8D51-C242B65BBECD.jpeg9A48A0EE-5EFE-409D-ACC0-17011F6F7EBF.jpeg950F85B7-D304-4724-AB3D-B606E422F1E3.jpeg
Today I bagged and tagged batch 10.
 I wiped the RGA vacuum component for around 25 minutes after that I bagged and tagged this part and put inside the
cleanroom. The RGA vacuum component have a big size and because off that i used the big bag.
I wiped one power cable (2 meters), bagged and tagged that
and inside the cleanroom.
For the parts in the oven, a bunch of screws, I bagged and tagged the screws and put inside the cleanroom.
I put photos below
Entry  Fri Mar 31 14:23:13 2023, Pamella, Update, General, Clean and bake batch 11 4AC705B8-D906-47E3-86E4-49E4967910E7.jpeg
Today I bagged and tagged batch 11. I wiped the some tools: Centering ring alum( 2 pieces), reversible ratcheting, gasket removal (CF). After wiped that
I bagged and tagged this parts and put inside the cleanroom. 
Also I wiped one power cable (3 meters), bagged and tagged that and inside the cleanroom.

I put photo below.
Entry  Mon Apr 3 17:04:05 2023, Aiden, Summary, General, IDP Scroll Pump Assembly IMG_4244.jpg
Aiden installed the isolation valve and the exhaust silencer kits on the IDP-3 Scroll pump. The entire assembly still needs to be wiped down but overall
no residue came off when putting on the kits.
Entry  Fri Apr 7 09:48:09 2023, Pamella, Update, General, Clean the system parts 7x
Pamella and Julian wiped and tag system parts for the vacuum machine. We used isopropyl and vectra wipes in the most import pieces: 
Inverted magnetron
pirani gauge and the air cooling kit 81. The other parts we uses the IPA wipe for cleaning.
So for now we finished with ever system parts which was in
the gabinetes.
I put photos below.  The photos is for all part we cleaning, tag and which puted inside the cleaning room.
Entry  Tue Apr 11 17:56:15 2023, Pamella, Update, General, Lab cleaning  
Today Pamella and Julian finished cleaning of the cleanroom, starting with the HEPA vacuuming, mopping and clearing all floor with IPA wipes. Also we wiped
down some surfaces of the blue table, computer table and the top of chamber.
Entry  Wed Apr 12 10:53:02 2023, Aiden, Summary, General, Valve Cleaning 
Bagged and Tagged the parts from batch 10 and placed them inside the clean room. 

Then cleaned the last gate valve in liquinox for 20 minutes (10 minutes
each side). Then dried the valve, bagged, tagged, and placed it inside the clean room.
Entry  Wed Apr 12 16:17:50 2023, shane, Update, General, Particle Counter moved IMG_6693.HEIC
With the added height of the new docking station, the particle counter no longer fits under the Windows monitor in the electronics rack and has been moved
to the desk in the corner of the lab.
Entry  Mon Apr 17 17:06:49 2023, Aiden, Summary, General, Clean and Bake batch 11 IMG_4262.jpg
Cleaned the Viton O-Ring for the main chamber in Liquinox for 10 minutes. Then put it in the oven to back for;

1. Ramp to 100 degC in 15 min.
2. Dwell
at 100 degC for 30 min.
3. Ramp to 180 degC in 30 min.
4. Dwell at 180 degC for 24 hours.
5. Off

Note: There were three viton -rings in the bag sent
to us. I cleaned and baked 2 of them and left the third in the bag.
Entry  Fri Apr 21 16:51:26 2023, Pamella, Update, General, Cleaning cables. IMG_5416.jpeg
Cables for the vacuum system.
 
 Today i wiped, bagged and tagged two cables for the vacuum system. I used IPA wipes for cleaning this two split
power cord. I attached a image below.  
Entry  Mon Apr 24 17:38:45 2023, Aiden, Summary, General, Clean and Bake Batch 12 IMG_4269.jpgIMG_4268.jpg
Today I Bagged and tagged the o-rings from batch 11 and placed them inside the clean room. I also cleaned batch 12 parts in liquinox for 10 minutes and
them placed them into the oven where they will undergo the following steps;

1. Ramp to 100 degC in 15 min.
2. Dwell at 100 degC for 30 min.
3. Ramp
to 200 deg C in 30 min.
4. Dwell at 200 deg C for 48 hours.
5. Off
Entry  Thu Apr 27 09:48:34 2023, Aiden, Summary, General, Batch 12 Bagging IMG_4279.jpgIMG_4278.jpg
I took batch 12 out of the oven and put them in a bag and placed the bag inside the clean room in the first large stainless steel container.

I also looked
at the small gauge that we felt like needed to be baked and I can confirm that without further cleaning around the inside of the gauge it should not be
connected to the main vacuum. I have attached a photo of the inside of the gauge.
    Reply  Fri Apr 28 19:39:19 2023, Cao, Summary, General, Clean and Bake Leybold TTR 91 Pirani Gauge 




Quote:

I took batch 12 out of the oven and put
them in a bag and placed the bag inside the clean room in the first large stainless steel container.

I also looked at the small gauge that we felt like
Entry  Mon May 8 12:00:03 2023, Pamella, Shane, Julian, Update, General, Cleanroom particle counts and cleaning the cleanroom. 
[Pamella,Julian, Shane]


Today we cleaned the clean-room (floor, surfaces) and particle count.



10:00 am: Started particle count.


 Zone 3:  
 0.3u: 1330 
 0.5u: 540 
 1.0u: 415 

 Zone 4: 
 0.3u: 290 
 0.5u:
83 
 1.0u: 0 





Clean-room:
 10:30 am: Started wiping down the surfaces inside the clean-room 
 10:41 am:
Entry  Wed May 10 10:49:34 2023, Aiden, Update, General, RGA Software 
[Aiden, Cao]

Went over how to use the RGA software, how to change the graph units, scaling and mass detection. Also went over how to remove the RGA from
the vacuum system as well as procedure for turning it on.
Entry  Wed May 17 12:18:08 2023, Pamella, Julian and Shane , Update, General, Cleaning room and particle count 
[Pamella, Julian and Shane]



Particle count: 
  10 am: Started particle count 

 Zone 3 :

 0.3u: 1288  

0.5u: 332 
 1.0u: 124 


 Zone 4 :

 0.3u: 498 
 0.5u: 166 
 1.0u: 83 




10:40 am: Checked the surfaces inside the cleanroom. 
 10:50 am: Started vacuuming the cleanroom. 
 11:15 am: Started mopping the cleanroom.
Entry  Wed May 31 11:42:16 2023, Pamella, Julian and Shane, Update, General, Cleaning room and particle count 
[Pamella, Shane and Julian]


 Cleaning room and particle count 

  09:58 am: Started the particle count 
Zone
3:  
     0.3u : 1,995 
     0.5u : 540 
     1.0u : 0 


    Zone 4:  
     0.3u : 124 
  
  0.5u : 0 
     1.0u : 0 




 10:25 am: Started checking the surfaces inside the cleanroom. 
 10:30
Entry  Wed May 31 16:18:41 2023, Aiden, Summary, General, Mock FROSTI IMG_4394.jpg
Finished assembly on the Mock FROSTI so it is ready for the fit test at LIGO lab.
Entry  Tue Jun 6 16:04:46 2023, Aiden, Update, General, Water 
Aiden went and refilled the de-ionized water to continue clean and bake batches.
Entry  Mon Jun 12 18:52:00 2023, Pamella, Update, General, Heater system parts - Wiped and bagged heater_equipment_wiped.jpg
[Pamella]
  Cleaning the heater system parts.
 04:32 pm: Started wiping the heater system parts.  
 06:38 pm: Finished wiping the heater
and some parts to the system. I wiped, tagged and bagged the heater system, power cables, adapter cables and power connectors. Also I wiped, bagged and
tagged the aluminum foil tape.
 06:43 pm: I putted all bags inside the cleanroom. 
 To do: I started but I was not able to finished
Entry  Tue Jun 13 10:28:50 2023, Pamella, Update, General, Wiped and bagged the heating and cords. heater_cords_wiped.jpg
[Pamella]


    Cleaning the heater system parts.
    09:13 am: Started wiping the last parts for the heater system (heating and cords).

   10:18 am: Finished wiping the parts to the heater system (heating and cords). I wiped, tagged and bagged the heating and cords. 
    
Note: In some parts looks like the silicone insulation material is having some sort of residue on the wipe so I wiped very careful this part and just for
Entry  Tue Jun 13 21:33:46 2023, Pamella, Update, General, New cabinet for PPI 
[Pamella and Dr.Richardson]

Dr. Richardson installed the new cabinet outside the room for the PPI equipments, and then I wiped all surfaces inside
and outside of the new cabinet. 
 Dr.Richardson and I have finished organizing the PPI within the new cabinet. Also we have new supplies of gloves,
and will likely have more supplies for other PPIs soon. 
Entry  Thu Jul 13 15:31:21 2023, Jon, Update, General, Ant traps placed around lab 
In response to reports that ants have been observed in the lab, I placed five ant bait traps around the room today. Each is sitting on the floor on top
of a piece of aluminum foil, in areas unlikely to be inadvertently stepped on. They contain liquid which will spill
out if picked up, so please take care not to disturb them.
    Reply  Thu Jul 13 16:59:03 2023, Jon, Update, General, Ant traps placed around lab 
Update: After seeing the strong response to the first set, I redistributed them to the hottest spots and added one more trap.



Quote:



In response to reports that ants have been observed in the lab,
Entry  Sun Jul 16 15:21:56 2023, Pamella, Update, General, General update about some problems in the lab. IMG_8637.jpgIMG_8633.jpgIMG_8631.jpg
[Pamella]

 General information about the lab facility. 
 
  Changed sticky floor mats, because close to entrance the cleanroom,
both sticky floor had a many died ants on top. 
The light on top of the internet cable bridge is burned out.. I just saw this today but I am
not sure if was like this before.
The ant bait traps seem very efficient and right now only a few ants are running around in the lab, most are
Entry  Wed Aug 9 11:32:56 2023, Jon, Infrastructure, General, New power cables IMG_0299.jpg
I delivered new NEMA 5-15 (120V / 15 A) power cables to the lab for the following items:

WS2 (cleanroom) cart - 10ft cable
Electronics workbench overhead LED - 10ft cable
Both PI heater controller sets - (2)
6ft cables

I installed the new cables on the WS2 cart and the workbench myself, and left the two 6ft cables (as pictured below) for Aiden
Entry  Tue Aug 29 22:07:38 2023, Aiden, Update, General, Electronic Bench IMG_4632.jpg
Dr Richardson is working on mounting more power supplies in the server rack and is using the electronics bench. Be aware to not move anything on the bench
itself.
Entry  Tue Sep 5 16:43:19 2023, Aiden, Update, General, VAC System Heating Update 
Checked on bake 5 today after 3 days of equilibrium. The RGA cross is at 106 C and the turbo pump cross is at 74 C. This was reached while the PID controllers
were at 140 C. I will now slowly raise the temperature to 150 on the PID controllers and see if the difference in the RGA cross can be reduced.
Entry  Wed Nov 8 17:55:49 2023, Jon, Update, General, Lab Clean-Up Day 1 
[Jon, Tyler, Shane, Peter, Luis]
Today we completed the first phase of lab clean-up. Activities included:

CF/KF parts stored under the cleanroom table were removed and transferred to Physics 1129
Cleanroom workbench cleared, with all
Entry  Tue Nov 21 22:09:44 2023, Aiden, Update, General, Testing Parts 8x
[Aiden, Luis]


Luis and Aiden vented the chamber today. We closed off the RGA section and then proceeded to open the the vent on the main body after
turning off the turbo and backing pump. We then opened the lid and placed in all the stainless steel hardware that will be used in evaluating the FROSTI
optics and heater elements. We also inspected the weldments before closing it up. Check the clean and bake data base where there is now a new section outlining
    Reply  Sat Dec 9 12:34:12 2023, Jon, Update, General, Electronics workshop migrated to 1129 IMG_0765.jpgIMG_0767.jpeg
[Jon, Tyler, Shane, Luis]
On Wednesday we completed the migration of the electronics workshop from 1119 to the large new workbenches in 1129. The two workstations pictured
closest to the front of the room are for electronics assembly and testing, while the two in the rear will house LIGO CDS workstations. We moved all of
Entry  Mon Jan 8 20:24:53 2024, Aiden, Update, General,  IMG_4888.jpgIMG_4886.jpgIMG_4887.jpg
[Jon, Aiden]

Installed the heater elements into their fixture and prepped the cables by twisting the wires into pairs. We also installed the pins
onto the wires and placed them into the peek DB 25 connector. The installation tool we had did not fit the pin size we had so the pins needed to be installed
by hand by opening the connector and holding them in place. In the future we will need to make sure we twist the wires together, group them, and then splice
Entry  Mon Jan 15 22:29:34 2024, Jon, Infrastructure, General, Cabinet installation & lab clean-up completed 1129.png1119.png
[Jon, Tyler, Aiden, Shane, Pooyan, Michael, Cynthia, Luke]
On Wednesday, we completed long list of work towards making the new lab (1129) fully operational and enabling the next phase of FROSTI testing. 
Cabinet Installation
Three new VWR cabinets with sliding glass doors were installed in 1129. Each unit measures 48"
Entry  Wed Jan 17 15:47:49 2024, Aiden, Update, General, Resistors for Heater Elements 
Power         Res (Ohm) RTD Res (Ohm)

Heater 1= 73.6; 81.8

Heater 2= 70.4; 82.1

Heater 3= 71; 84.5

Heater 4= 71.5; 80

Heater
5= 70.5; 81.7

Heater 6= 72; 79.4

Heater 7= 69.2; 78.2

Heater 8= 71.1; 84.2
    Reply  Tue Feb 20 08:01:30 2024, Jon, Infrastructure, General, Power and network equipment installed in 1129 rack IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg
[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On Thursday we installed the power conditioning/distribution equipment and networking equipment in the new 1129
rack. The hardware is identical to the setup in the 1119 rack and includes:

Tripp Lite SU5KRT3UTF - 208V, 5kVA on-line UPS with 120V transformer
CyberPower PDU20M2F12R - metered power distribution unit,
Entry  Tue Feb 20 18:08:24 2024, Aiden, Update, General, Degassing the RGA bake11_240220_Elements_postdegas_ArO.pngbake11_240220_Elements_predegas_ArO.png
I took an RGA measurement before and after degassing the RGA. Both data was taken with the Argon open. The pressure before taking data was 2.39 e-8 torr
in the main volume. Note that the main chamber was fully valved off for the degas and the main chamber pressure quickly rose to e-6 torr. Further investigation
of this rise should be done as this might be the main culprit for the leaking.
Entry  Mon Feb 26 15:15:39 2024, Aiden, Update, General, Vacuum Chamber Baking Update 
Started Bake 12 on Wednesday Feb. 21 and turned the bake off on Saturday Feb. 24. This was a normal low temp bake with the PID controllers set to 110 degC.
    Reply  Wed Feb 28 12:02:08 2024, Tyler, Update, General, Resistors for Heater Elements Update 
Power         Res (Ohm) RTD Res (Ohm)

Heater 1= 72.8; 80.6

Heater 2= 69.5; 80.8

Heater 3= 70; 83.2

Heater 4= 70.6; 78.7

Heater
5= 69.9; 80.6

Heater 6= 71.1; 78.2

Heater 7= 68.5; 76.8

Heater 8= 70.1; 82.8







Quote:

Entry  Sun Mar 24 11:49:27 2024, Aiden, Update, General, FROSTI RGA Scan bake13_240324_FROSTI_ArC.pngbake13_240324_FROSTI_ArO.png
Took RGA data 1 day after the conclusion of Bake 13. Bake 13 ended on Saturday March 23, the RGA data shown was taken on Sunday March 24. The scan shows
that the FROSTI is very clean with no outgassing. The HC levels are at 25 e-10. The pressure in the chamber was also a 1.64 e-8 Torr.
Entry  Mon Jun 17 11:47:46 2024, Liu, Infrastructure, General, Temporary cooling units for the labs 1119.jpg1129.jpg
Below are the temporary cooling units installed last week in labs 1119 and 1129. They are the temp. replacement for the building AC system, which will be
shut down during the Physics roof replacement. 
Entry  Thu Jul 11 21:01:37 2024, Jon, Infrastructure, General, Cable tray installed in 1129 IMG_1395.pngIMG_1396.png
Today I installed a 10' cable tray in 1129, for permanently routing Ethernet lines to the workstations. It is securely bolted to C-channels in the side
wall and in the center cable tray.
Entry  Sat Jul 13 15:09:04 2024, Luke, Update, General, Ring heater COMSL model update image_2024-07-13_150654436.pngimage_2024-07-13_150704735.pngimage_2024-07-13_150716079.pngimage_2024-07-13_150726593.png
After the feedback from last meeting and Liu's help narrowing down what I should do to improve the model. I made some changes: First with Liu's help
I made the proportions of the test mass and ring heater much more reasonable and parametrized by constants. Second from Cao's paper "FROSTI Nonimaging
Reflector Design" Liu showed me what I should do to define the elliptical mirrors. Third during Friday's modeling/programming meeting walked me through