ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 8 of 12  Not logged in ELOG logo
ID Date Author Type Category Subjectdown
  468   Tue Nov 5 11:08:40 2024 Luis MartinUpdateVACISO Test

[Luis, Luke, Ma Michael]

The isolation test was conducted on the vacuum system. Every pump was turned off under vacuum, and pressure measurements were taken every minute for 15 minutes. The results are displayed in the sheet linked at the end of this report. The pressure of the main volume dropped very slowly.

The pressure of the RGA Volume dropped in an exponential manner. The test had to be paused at 11 minutes due to concerns about the pressure exceeding the lowest permitted level for the RGA filament.

After the ISO test was performed, we attempted to tighten the bolts of the small turbo pump on the RGA Volume. However, we noticed that the pressure had increased by nearly an order of magnitude, going from 3.27 × 10-9 Torr to 1.45 × 10-8 Torr when both volumes were separated. We conducted a leak test for that particular flange and found a concerning leak of 2.15 × 10-8 Torr, which had previously been 1.9 × 10-9 Torr. We believe the copper seal was damaged during the ISO test.

View the results sheet

  6   Tue Jun 21 18:31:49 2022 Cassidy and PhoebeUpdateCamerasIR Absorbing Screen and FLIR Camera Setup
Today we set up the IR absorbing screen and the camera on the optical table, as well as tested that the camera was functioning as expected (picking up heat sources beyond the screen).

Screen Setup

The screen was set up by clamping it between two rectangular posts on each side. First, two posts were set up with 22 in. between them (thus allowing the screen to span a total distance of up to 24 in. when clamped down). To best stabilize the screen and to allow for it to be "pulled" taut by exploiting the give in the L-bracket, the L-bracket was bolted on the outside of the post, along the same axis as the screen itself.

On first attempt, the screen was too thin to be fully clamped between the posts. In order to have it fit snugly, sections of heat shrink tubing was used as a shim at the points where the posts were clamped together. The tubing was slid into the track of one optical post at the desired points. In order to accommodate the shim, the two posts had to be held together, ideally clamped, with the screen and shim in place. Then, the post clamps could be slid into the tracks of the post, moved to the optimal location, and tightened down. This required at least three people: two to tighten one side while the third holds up the screen on the other side. The screen was placed ~1/8" from the edge of the posts and flush with the top.

Camera Stage Setup

Once the screen was in place, the camera stage was set up by placing the XY-Translational with Rotation stage on four 3" optical posts. Then, the z-axis stage was placed in the center of that, with another 3" optical post on top, which was then topped with the camera. This was set and clamped down ~22.5" from the screen. This was about 1" closer than expected based on our theoretical models.

Fine Alignment

We used the visible camera to fine align the screen and to test the setup. Notably, the visible camera is placed below the infrared and thus requires a calibration in order to ensure the two are aligned on the computer image. This can be set by hand using the FLIR proprietary software (FLIR CamWeb) and adjusting the "MSX alignment". The image mode "Thermal MSX" allows both the visible and IR camera to be displayed at once and the difference in their positioning can be seen. We found an offset of ~0.5m to be nearly accurate (note: using this method, although you can get more accurate than this, the displayed value only has one significant figure).

In order to align the camera, we first used the exposed top edge to judge whether the camera was appropriately centered on the screen. We set the rotation as close as possible to being in line by eye, then adjusted the y-axis until the gap on both corners was a similar size, thus indicating that the rotation and y-position were correctly set. Rotationally, the camera required only a refinement of -1/2 degree. The y-axis is set at 1.25. Then, the camera was pulled as far from the screen as possible using the x-axis to allow the screen to be easily centered using the z-axis. Once the outlined test mass was centered, the x-axis was used to bring the camera close until the screen just barely filled the field of view. The x-axis is at 2.25. The z axis is set to it full dynamic range at 10. Unfortunately, the camera is still slightly too tall for the screen, likely requiring the purchase of a new optical post about 0.5in shorter the current one. This interchange will likely require a new fine alignment after.

Basic Imaging Tests

The camera was also focused on the screen based on the manufacturer's printed distance on the camera itself (using 22.5", or 0.572 m). Using the FLIR proprietary software, the camera appears to be in focus in IR (a hand was used as a good focusing tool for this). Additionally, the camera does pick up heat on the other side of the screen. A hand can be lightly seen warming the screen, as can a soldering iron tip. This was a very imprecise visual tool, but does indicate that the camera and screen are working roughly as expected.

Next Steps

A new optical post that is ~2.5" tall should be ordered to replace the one under the camera currently. The heating system also needs to be ordered and set up. Currently we are debating between a parabolic reflector with a hole in the back, and one without, as each would require a different mounting mechanism for the cartridge heater.

Attachment 1: IMG_6751.png
IMG_6751.png
Attachment 2: IMG_1146.png
IMG_1146.png
Attachment 3: IMG_6756.png
IMG_6756.png
  60   Mon Apr 3 17:04:05 2023 AidenSummaryGeneralIDP Scroll Pump Assembly
Aiden installed the isolation valve and the exhaust silencer kits on the IDP-3 Scroll pump. The entire assembly still needs to be wiped down but overall no residue came off when putting on the kits.
Attachment 1: IMG_4244.jpg
IMG_4244.jpg
  1   Sun Apr 10 15:39:49 2022 Rutuja GuravHowToComputer Scripts/ProgramsHowTo: Renew the Let's Encrypt SSL certificate using certbot

Port 80 is kept closed by default. This might be causing the certbot auto-renewal cronjob to fail. Therefore we must renew the certificate manually.


Step 1: Open port 80. (This is needed as the certificate renewal process runs some tests which requires client communication over port 80)


Step 2: Run the following command


sudo certbot certonly --force-renew -d richardsonlab.ucr.edu


Step 3: Confirm the certificate was renewed by running the following command


sudo certbot certificates

  98   Sun May 14 15:50:48 2023 CaoInfrastructureComputersHigh resolution display of logrus machine
[Cao]

The display resolution of the logrus has been 1064x768 and has been the only option, which is not great. While remote access to logrus using rdesktop allows rendering a virtual display of user's chosen resolution, it is not fast when using graphic-intensive program. NoMachine allows user to take over and control the machine remotely and thus appears as the same machine. However, NoMachine cannot render a virtual display like rdesktop. This has been limiting the resolution of using logrus via NoMachine.

On Friday, I found that even though we had NVIDIA Quadro P600 graphic card installed, we were not actually using it. The monitor has been connecting to the the integrated VGA display connector. This uses Microsoft Basic Display Adapter which limits the the resolution. Today I got a HDMI to Mini-display cable to connector the monitor to the Nvidia graphic card. Then in Display settings, go to Graphic settings, then enable Hardware-accelerated GPU scheduling. After restarting the machine, the machine recognised the Display 2using the Nvidia Quadro P600. In multiple displays field, selected "Show only on 2" and remove the VGA connection to the monitor. Logrus is now set at Nvidia Qadro P600 native display resolution of 1920x1080. This is now also the display resolution in NoMachine.

  543   Mon Mar 31 11:26:45 2025 Luke JohnsonUpdateScripts/ProgramsHeatmaps of power delivery performance
These plots show the required temperature to release 100W of power and the efficiency of a particular configuration with half-width w and distance away from the barrel z. I want to add to these heat maps a limit line that has restricts the proximity of the reflectors from the barrel.
Attachment 1: temp_required.png
temp_required.png
Attachment 2: efficiency.png
efficiency.png
  435   Fri Sep 6 14:34:52 2024 Luke UpdateVACHeating tape work

On the 5th I had tried to start baking the vacuum chamber however certain parts of the chamber were getting too hot and causing the controllers to shut off. So I turned them off so that the next day I could rearrange the temperature probes. I then on the 6th set them up so that instead of overshooting the temperature they would be a little low in places.

After being left over night the cooler parts of the vacuum chamber got much closer to the desired temperature of 120C.

Here is a table of the temperatures of the sections of the chamber. Note: After these measurements were taken the PID controllers were set to 125C.

Location   Temperature (C)
Lid (PID controller 1 emergency shutoff) 108
Barrel lower (PID controller 1) 120 
Barrel upper (PID controller 2 emergency shutoff) 118
RGA volume (PID controller 2) 120

Here is a table of temperature of the flanges that have electronics.

Electronics Temperature (C)
Pressure gauge (Main volume) 79
Main turbo pump 64
RGA 51
Pressure gauge (RGA volume) 55
Cal leak 47
Mini turbo pump 50
Pirani gauge 45 

Other temperatures of note:

The optical table was about 38C

The cleanroom was around 33C (~91F)

  124   Wed Jun 14 15:35:36 2023 PamellaUpdateVACHeating system installation
[Pamella and Cao]
    Heating system installation - Second day.
  • Today we kept installing the equipment for the heating system.
  • First: Started installing the two heating cable around the chamber vacuum, the arms and covered it with aluminum tape.
  • Second: Started installing the insulation stuff around the vacuum chamber and around the connections points (the arms) in the vacuum chamber.
  • Third:Started installing the heater system (electronic device) and tried testing.
    • Note: The around part of the chamber vacuum was difficult to cover, so we spent a little time on. Also one heater system electronic device wasn't working because one fuse is burned so we could not finished this part and we need wait for a new one to replace and working on it.
Attachment 1: heater_equipment_install.jpg
heater_equipment_install.jpg
  433   Tue Sep 3 15:52:56 2024 LukeUpdateVACHeater tape initilization

[Luke, Tyler, Jon]

On the 3rd we set up the pid controllers for the heater tapes and after putting on the insulation we started heating them up. We first brought it to ~50C and let it stabilize, there was about a 6-7 degree difference between the RGA and the barrel temperature, with the barrel being higher. We then brought it to 60 then 70C it still maintained the slight difference between the RGA and barrel temperatures.

Here is a table of the temperatures of the flanges connected to electronics as I left it.

Electronics Temperature (C)
Pressure gauge (Main volume) 58
Main turbo pump 45
RGA 37
Pressure gauge (RGA volume) 39
Cal leak 40
Mini tubo pump 36
Pirani gauge 37

Notes: I removed the electronics from the pressure gauge (main volume) because while it was below the required threshold it was still quite high compared to the other flanges.

  119   Mon Jun 12 18:52:00 2023 PamellaUpdateGeneralHeater system parts - Wiped and bagged
[Pamella]
    Cleaning the heater system parts.
  • 04:32 pm: Started wiping the heater system parts.
  • 06:38 pm: Finished wiping the heater and some parts to the system. I wiped, tagged and bagged the heater system, power cables, adapter cables and power connectors. Also I wiped, bagged and tagged the aluminum foil tape.
  • 06:43 pm: I putted all bags inside the cleanroom.
  • To do: I started but I was not able to finished wiping the heating and cords for the heater system so I will finished this parts after.
  • I attached the photos below.
    Attachment 1: heater_equipment_wiped.jpg
    heater_equipment_wiped.jpg
      128   Tue Jun 20 17:28:23 2023 PamellaUpdateElectronicsHeater system parts - Wiped
    [Pamella]
      Heating system
      Wiping the heater system parts.
    • 04:37 pm: Started wiping the electronic device part for the heater system (HL101 Series Digital Benchtop temperature limit control).
    • 05:19 pm: Finished wiping the parts to the heater system (HL101 Series Digital Benchtop temperature limit control). I wiped the HL101 Series Digital Benchtop temperature limit control and I didn't bagged and tagged because we should install that soon.
    • 05:23 pm: I putted heater electronic device inside the cleanroom without the bag. Also the electronic device is near to the vacuum chamber and the other parts to heater system.
    • I attached the photo below.
    Attachment 1: IMG_7696.jpg
    IMG_7696.jpg
      122   Tue Jun 13 21:08:46 2023 PamellaInfrastructureVACHeater system - Installation
    [Pamella, Cao and Jon]
      Heating system installation
    • Today we started installing the equipments for the heating system.
    • First: Started installing the heating cable on the top lid and covered it with aluminum tape.
    • Second: Started installing the insulation cover on top of the chamber lid.
    • Third:Started installing the heating cable from under the vacuum chamber and covered with aluminum tape.
    • Forth: Started installing the insulation cover under the vacuum chamber
    • Note: The under part of the chamber vacuum was very difficult to cover, so we spent a little time on it and we couldn't finish the whole installation today. So tomorrow we should be able to keep doing the installation.
    Attachment 1: IMG_7563.jpeg
    IMG_7563.jpeg
    Attachment 2: IMG_7561.jpeg
    IMG_7561.jpeg
      503   Mon Jan 27 11:29:38 2025 Xuesi MaUpdate Heater Element Test

    [Ma, Cece, Luke, Mary, Shane]

    On Friday (Jan 24), we installed the heater elements on the stand. The heater elements are arranged from 1 to 8, oriented from right to left as shown in Attachment 1. Each wire has been labeled according to its corresponding element number and type (e.g., RTD connections, heater connections).

    Note: We currently do not have enough PEEK zip ties, so standard zip ties have been used temporarily. These must be replaced with PEEK zip ties before the setup is placed in the vacuum chamber.

    Attachment 1: 20250124_165434.png
    20250124_165434.png
    Attachment 2: 20250124_165342.png
    20250124_165342.png
    Attachment 3: 20250214_132811.jpg
    20250214_132811.jpg
      316   Mon Feb 5 14:17:52 2024 AidenUpdateVACHeater Element RGA Scan
    Here are the new RGA scans for the powered Heater elements. The pressure at the time of taking data was 2.88 e-8 torr. The HC levels are at 40 e-10 torrl/s which is not bad but still higher than the lowest we have recorded.
    Attachment 1: bake10_240205_Elements_ArO.png
    bake10_240205_Elements_ArO.png
    Attachment 2: bake10_240205_Elements_ArC.png
    bake10_240205_Elements_ArC.png
      319   Thu Feb 8 17:37:48 2024 AidenUpdateVACHeater Element RGA Scan
    Took more RGA data now that the heaters are powered by 18V. The pressure of the system during the data taking was 3.8 e-8 torr. The RGA scans seem to have gotten worse as well with this power increase.
    Attachment 1: bake10_240208_Elements_ArO.png
    bake10_240208_Elements_ArO.png
    Attachment 2: bake10_240208_Elements_ArC.png
    bake10_240208_Elements_ArC.png
      320   Mon Feb 12 17:35:47 2024 AidenUpdateVACHeater Element RGA Scan
    Took more RGA data before and after increasing the heater elements to 300 degC and before heating them up.

    Started Bake 11 as well to hopefully prevent any hydrocarbons from getting captured by the room temperature walls of the chamber. The PID controllers were set to 100C.
    Attachment 1: bake10_240212_Elements_ArO.png
    bake10_240212_Elements_ArO.png
    Attachment 2: bake10_240212_Elements_ArC.png
    bake10_240212_Elements_ArC.png
    Attachment 3: bake10_240212_Elements_300C_ArC.png
    bake10_240212_Elements_300C_ArC.png
      328   Mon Feb 19 14:17:50 2024 AidenUpdateVACHeater Element RGA Scan
    Three days after the completion of Bake 11, the Heater elements RGA scan looks much cleaner. The HC level is back down to 33 e-10 torrl/s with the pressure at 2.13 e-8 torr. I could not take a= scan with the Argon closed as it was left open during the bake and not closed since then.
    Attachment 1: bake11_240219_Elements_ArO.png
    bake11_240219_Elements_ArO.png
      506   Fri Jan 31 15:03:09 2025 Xuesi MaUpdate Heater Element Circuit Check

    [Ma] Wed 1/29/2025

    No short circuit between heater element ✓

    No short circuit to ground on any pin ✓

    No short circuit between connectors ✓

    Heater Number Power Resistor before (Ohm) Power Resistor now (Ohm) RTD Resistor before (Ohm) RTD Resistor now (Ohm)
    1 73.6 73.1 81.8 81.3
    2 70.4 69.6 82.1 81.6
    3 71 70.5 84.5 84
    4 71.5 71 80 79.4
    5 70.5 70.2 81.7 81.2
    6 72 71.6 79.4 78.7
    7 69.2 69 78.2 77.5
    8 71.1 70.6 84.2 83.6
      7   Mon Jul 11 14:29:45 2022 JonOmnistructureGeneralHEPA filter installed
    Today I unpacked and installed the new HEPA filter for the lab. It is an Omni CleanAir OCA1210 capable of 1200 CFM. This flow rate is sufficient to turn over the air in the room once every 4 minutes, or 14 times per hour. Hopefully this will cut down on our particulate accumulation issues.
    Attachment 1: IMG_1530.png
    IMG_1530.png
      515   Tue Feb 18 10:02:16 2025 Xuesi MaUpdate Group Meeting Slides 2/18/2025

    https://docs.google.com/presentation/d/1WiV2VqS0BzXNCK6VYYQ-Ty8xlHnzXatQaFbMf1-0rsY/edit?usp=sharing

      451   Wed Oct 2 10:31:46 2024 Xuesi MaConfiguration Group Meeting Slides 10/2/2024

    Group Meeting slides for Non-deterministic Heater Response.

    Attachment 1: Group_Meeting_10_2.pdf
    Group_Meeting_10_2.pdf
      82   Thu Apr 27 21:43:07 2023 JonPhysicsVACGrounding vacuum system

    This afternoon I made up a green 10 AWG grounding cable and connected it to the vacuum system.

    One end is tightly connected to the bottom flange of the vacuum chamber (photo 1). It is run along and up the table framing to the top of the cleanroom, where it exits into the overhead cable tray in the same location as the other power cables. It drops down from the top of the server rack all the way to the bottom, where the other end is connected to the lab's electrical ground in the rear of the 240 V UPS (photo 2).

    The connections were confirmed to be secure, but continuity testing with an ohmmeter remains to be done to confirm that the chamber and tabletop are indeed grounded.

    Attachment 1: IMG_0141.png
    IMG_0141.png
    Attachment 2: IMG_0140.png
    IMG_0140.png
      84   Fri Apr 28 18:16:57 2023 CaoPhysicsVACGrounding vacuum system

    Quote:

    This afternoon I made up a green 10 AWG grounding cable and connected it to the vacuum system.

    One end is tightly connected to the bottom flange of the vacuum chamber (photo 1). It is run along and up the table framing to the top of the cleanroom, where it exits into the overhead cable tray in the same location as the other power cables. It drops down from the top of the server rack all the way to the bottom, where the other end is connected to the lab's electrical ground in the rear of the 240 V UPS (photo 2).

    The connections were confirmed to be secure, but continuity testing with an ohmmeter remains to be done to confirm that the chamber and tabletop are indeed grounded.

     

    [Cao]

    Continuity Test

    Following from Jon's grounding work on the vacuum system, I did a continuity test with the afternoon with a multimeter. The chamber is indeed grounded:
    • Chamber wall to optical table: continuity confirmed, resistance: 0 Ohm
    • Chamber wall to ground point connection on chamber: continuity confirmed, resistance: 0 Ohm
    • Turbo pump to ground point connection on chamber: continuity confirmed, resistance: 0 Ohm
    • Turbo pump to optical table: continuity confirmed, resistance: 0 Ohm
    • Optical table to chassis frame outside cleanroom: continuity confirmed, resistance: 0 Ohm
    • Front of chassis frame to earth point: continuity confirmed, resistance: 0 Ohm

      187   Tue Aug 1 16:22:35 2023 CelesteUpdateTCSGraphical Updates to HOM RH Modification, Tuesday 8/1
    Slides 20-33 are newly added (data/graphs from parameter sweep feature-1/8th heater unit length varied from 10% of original to 100% of original).
    Attachment 1: HOM_RH_Simulation_Progress_80123.pdf
    HOM_RH_Simulation_Progress_80123.pdf
      180   Fri Jul 28 17:45:45 2023 CelesteUpdateTCSGraphical Updates to HOM RH Modification, Friday 7/28
    Updated 1/8th Heater simulation modification graphs. Slides 7, 10, 16-19 are new additions.
    Attachment 1: HOM_RH_Simulation_Progress.pdf
    HOM_RH_Simulation_Progress.pdf
      173   Thu Jul 27 10:18:43 2023 CelesteUpdateTCSGraphical Updates to HOM RH Modification
    Attached are updated graphs of the irradiance distribution from the 1/8th ring heater units (extruded and reduced in length).
    Attachment 1: HOM_RH_1_8_Unit_Modification_Graphs.pdf
    HOM_RH_1_8_Unit_Modification_Graphs.pdf
      158   Sun Jul 16 15:21:56 2023 PamellaUpdateGeneralGeneral update about some problems in the lab.
    [Pamella]
      General information about the lab facility.
      1. Changed sticky floor mats, because close to entrance the cleanroom, both sticky floor had a many died ants on top.
      2. The light on top of the internet cable bridge is burned out.. I just saw this today but I am not sure if was like this before.
      3. The ant bait traps seem very efficient and right now only a few ants are running around in the lab, most are dead in the bait traps, so probably in a day or two we can change those bait traps.
    Attachment 1: IMG_8637.jpg
    IMG_8637.jpg
    Attachment 2: IMG_8633.jpg
    IMG_8633.jpg
    Attachment 3: IMG_8631.jpg
    IMG_8631.jpg
      331   Tue Feb 20 11:31:49 2024 TylerUpdateCleanroomGarment Cabinet Door Replacement
    [Luis, Luke, Pooyan, Tyler]

    The replacement door for the HEPA garment cabinet arrived last week, and was installed on Thursday. However, it looks like there's a small gap between the door and where the hinge is attached to the cabinet frame. No screws were provided with the replacement door. If we want to perform any adjustments, we have to be very careful; the screws break very easily.

    Attachment 1: image_67190529.JPG
    image_67190529.JPG
    Attachment 2: image_67177473.JPG
    image_67177473.JPG
      500   Tue Jan 21 10:12:02 2025 Luke SummaryGeneralFrosti toy model

    [Luke, Liu]

    Over the winter break I have been working on this desmos toy model of the Frosti. There are still a few rough spots but I belive that it is a good visual representation of a 2D slice of the frosti. 

      389   Fri Jun 28 10:43:13 2024 XuejunUpdateCleanroomFrosti
    [Xuejun, Tyler]

    We moved Frosti into the cleanroom and debugged it to make sure everything was working. One of the DB25 pins broke off at the connector for element 1 so it needed to be recrimped. Element 6 short circuited but fixed with adjustment to the heater power pin position. We connected the power and sensor connectors to the power box and recalibrated the RTD sensors.

    Attachment 1: frosti.jpg
    frosti.jpg
    Attachment 2: chassis.jpg
    chassis.jpg
      393   Fri Jul 5 13:17:44 2024 LiuUpdateInterferometer SimulationsFour-quadrant FROSTI-like RH for astigmatic thermal actuation for CE optics
    In the CE corner layout design and down selection study, interferometer layouts with large incidence angles on some of the curved optics are being considered, such as the folding mirrors in the "long crab". This however generates astigmatic beams upon reflection and results in mode mismatches in coupled cavities that need to be mitigated. Astigmatic thermal actuation for the optics involved is thus essential. One way we are considering is to implement a FROSTI-like barrel RH that delivers different irradiance for the four quadrants. This post summarizes primitive results on the astigmatic thermal actuation for the HR surface by powering the heater elements from one diagonal differently compared to the other.

    For this study, we looked at a simple case with an aLIGO-like test mass geometry (R=0.17m, H=0.2m) plus a barrel RH with 0.02m width at 0.03m from the AR surface with FEniCSx. The irradiance profiles are constant inside the width along the longitudinal direction, and zero outside the width. For the baseline non-astigmatic actuation with constant irradiance azimuthally. We have obtained roughly equal quadratic actuations along the x and y directions, as shown in figure. The total delivered power on the entire barrel is normalized to 1 W. The actuation on the curvature per power Delta S/Delta P in this non-astigmatic case thus is 0.835 uD/W.

    For the astigmatic case however, the irradiance for the regions from one diagonal is increased by a given amount, compared to the non-astigmatic case, whereas for the other diagonal regions is decreased by the same amount (thus the total power is unchanged at 1 W). The HR deformation when the power is changed by 50%, for instance, is shown in picture, where the deformation along the x direction is larger than the y direction. The deformation in each direction however remains quadratic, with different curvature per powers for the x and y components, as shown in plot. The actuation on the curvature per power for an increasing amount of astigmatism is shown in plot. In terms of Zernike polynomials, the maximum amount of Z22 (astigmatism) for 1 W of total power is 2um while the remaining curvature content (Z20) is 6nm. This is shown in plot.

    Attachment 1: SURF_05.png
    SURF_05.png
    Attachment 2: SURF_xy.pdf
    SURF_xy.pdf
    Attachment 3: SURF_dsdp_converge.pdf
    SURF_dsdp_converge.pdf
    Attachment 4: SURF_dsdp_astigs.pdf
    SURF_dsdp_astigs.pdf
    Attachment 5: overlaps_zers.pdf
    overlaps_zers.pdf
    Attachment 6: SURF_xy_nonastig.pdf
    SURF_xy_nonastig.pdf
    Attachment 7: SURF_xy_nonastig.pdf
    SURF_xy_nonastig.pdf
      556   Mon Apr 21 16:56:42 2025 MichaelUpdateInterferometer SimulationsFixed Observed Squeezing Curve for Toroidal Mirror Case
    We've resolved the issue with the observed squeezing curve for the toroidal mirror case showing worse performance at lower frequencies and better performance at higher frequencies compared to the nominal case. This issue was caused by the beam parameter at the squeezer being fixed before changing the radii of curvature of the mirrors. This has been changed to be fixed after changing the mirrors, and we see an improvement in the toroidal mirror case.
    Attachment 1: updated_observed_squeezing_plot.png
    updated_observed_squeezing_plot.png
      90   Tue May 2 17:03:14 2023 Jon, CaoPhysicsVACFirst pump-down test of vacuum chamber

    [Jon, Cao]

    1. Re-routing of cables

    We re-routed the connections between the turbo pump and its fan to the controller. Instead of going through the side of the server rack, they are now routed along the the cable tray and came down from the top of the server rack.

    2. Planning for vacuum assembly re-configuration

    While preparing for our first pump-down, we notices that RGA pump line gate valve, at its fully closed position, is higher than the height of the chamber lid. The full range gauge attached to the RGA line, while not that high, can also cause obstruction during removal/ installation of the vacuum lid. The calibrated leak, eventhough is now running within the perimeter of the optical table, it stills introduce weak points that are susceptible to damage if personnel installing chamber lid may lean onto it. Thus we made a few suggested modification to the vacuum chamber assembly:
    • Move the entire RGA arm to the mirrored CF port, where the Up-to-Air valve is at
    • Move the Up-to-Air valve to the calibrated leak port
    • Move the calibrated Ar leak the main chamber full-range gauge port
    • Move the full-range gauge to the RGA line port

    3. First test pump-down

    1. With all valves closed, we started scroll pump, pump line quickly got down to 6.08 mbar from atmospheric 1000 mbar (measured by Pirani gauge, channel 3 on controller )
    2. We open Lesker angled valve and let the RGA arm pumped down, Pirani gauge read 6.3 mbar while the full-range guage on RGA line reads 4.9 mbar ( channel 1 on controller )
    3. We open the pump line gate to expose the pump to the main volume, all gaugues readout immediate rise back up 1000 mbar. After 3 minutes, we started to see channel 3 slowly dropped down. A minute later channel 1 and 2 (main body) also dropped down. The slow pressure dropping speed and 6.3 mbar measured earlier got us suspected that there is some large leaks
    4. We proceed to tighten all the ports as the vacuum is pumped down. In particular, we found that large feedthrough port still required a lot of tightening up
    5. As we tighten up all the ports, after 40 minutes, the gauges are now
      • Channel 1 : RGA line full-range gauge: 2.55E-1 mbar
      • Channel 2 : Main chamber full-range gauge: 2.60E-1 mbar
      • Channel 3 : Pump line Pirani gauge: 2.94E-1 mbar
      Compare this to the scroll pump manual , Table 1, page 3, the ultimate pressure of the scroll pump is 2.5E-1 Torr (3.3E-1 mbar), we thus managed to achieve scroll pump ultimate pressure
    6. Turn on turbo pump : Change turbo pump controller from REMOTE to FRONT PANEL mode by pressing both "COUNTERS" and "MEASURE" buttons at the same time, select "MODE=FRONT"
    7. Shorting interlock pin: since we do not have an interlock signal for the controller, use the provided DB-9 connector that has pin 3 and 8 shorted and connect this to the P1 IN connection at the rear of the controller (see attachment 1 )
    8. Press "START" on the controller to start the turbo pump
    9. The pressure readout from the gauges quickly dropped down. After 3 minutes, the Pirani range is maxed out at 0.5E-3 mbar. After 20 minutes, we recorded the following values:
      • Channel 1 : RGA line full-range gauge: 1.50E-5 mbar
      • Channel 2 : Main chamber full-range gauge: 1.89E-5 mbar
      • Channel 3 : Pump line Pirani gauge: 5.0E-4 mbar
      This is Medium vacuum , we want to further reduce this by 2 orders of magnitude. However, we can run RGA test + helium leak test at this pressure
    10. Turn off turbo pump, wait for 10 minutes, turn off scroll pump, open Up-to-Air valve, all pressure gauges indicated pressure returned back to atmospheric pressure

    3. To-do actions

    • Run RGA test to get information about contamination status of vacuum
    • Implement suggested changes in section 2
    • Check and modify suspected poor connection: Pirani gauge on pump line. A gap can be seen between connection. There's no good way to tighten it with the screw. Maybe use threaded pin + hex bolt?
    • Controller communications
    Attachment 1: PXL_20230502_203343616.jpg
    PXL_20230502_203343616.jpg
    Attachment 2: PXL_20230502_210234897.MP.jpg
    PXL_20230502_210234897.MP.jpg
      554   Tue Apr 15 11:37:17 2025 CynthiaUpdateInterferometer SimulationsFinishing up mirror coating map step
    Attachment 1: updates_4_15_2025.pdf
    updates_4_15_2025.pdf
      181   Fri Jul 28 18:03:07 2023 PamellaUpdateFLIRFinal plot - FLIR
    [Pamella]
      1. I was able to plot the final result with the data to the heater. I attached below the "3Combined_HighTemp_Gaussian_Plot." in this plot we can see better behavior on the Gaussian compared to the plot in ELOG 169, I was using the same data but with a different approach. On the ELOG 169, we have the center point isolated data and this new plot is the temperature more than 70 C isolated because we have a very good heater temperature distinguish do background. For the all data I got I was using a power current of 0.20A. To get the data I waited for 30 minutes until the heater became stable and after that, I started to take snaps, I took more than one snap for each one different 6 positions on the screen, and We can see the positions on ELOG 167.
      2. Also I attached the calibration plot ("calibration_plot") between the measurements with the FLIR camera and thermocouple and we can see looks good if we compare the final plot.
      3. For better analyses I attached a plot of the calibration line on the Gaussian plot.
      4. To do: I will finish the final report.
    Attachment 1: 29Combined_HighTemp_Gaussian_Plot.jpg
    29Combined_HighTemp_Gaussian_Plot.jpg
    Attachment 2: 3Combined_HighTemp_Gaussian_Plot.jpg
    3Combined_HighTemp_Gaussian_Plot.jpg
    Attachment 3: calibration_plot(2).png
    calibration_plot(2).png
      516   Tue Feb 18 10:12:39 2025 TylerUpdateTCSFinal RIN Plot Update

    Below is a preview of the final RIN figure that will be included in the FROSTI instrument paper. A quick summary of what is shown below:

    The original RIN CSD measurement is shown on the top panel in red. Frequency bins that exhibit external electronics noise (ex. ADC, photodetector noise, etc.) are identified and shaded in gray. These noisy bins are then excluded from the dataset before beginning the next step in the analysis process: rebinning. Here, the resolution of the spectrum can be changed by averaging frequency bins together within a specified interval, with the goal of pushing the measurement curve closer to the A+ requirement shown in the figure. For demonstration below, the spectrum goes from a resolution of ~0.93 Hz to 14.90 Hz.

    Attachment 1: Preliminary_RIN_plot.pdf
    Preliminary_RIN_plot.pdf
    Attachment 2: FROSTI_ON.pdf
    FROSTI_ON.pdf
    Attachment 3: Dark_Noise.pdf
    Dark_Noise.pdf
    Attachment 4: ADC_Noise.pdf
    ADC_Noise.pdf
      460   Wed Oct 16 14:13:31 2024 LiuUpdate FROSTI with non uniform absorption scattering sources
    Slides
      347   Wed Mar 6 09:57:52 2024 TylerUpdateTCSFROSTI Wiring

    Upon finishing the FROSTI assembly last week, we ran into some electrical issues. An electrical short was found between two of the d-sub pins (2 and 8). It appears that the pins were somehow coming into contact with the aluminum surrounding them. This was causing the power supply to trip. The issue was seemingly fixed by adjusting the positioning of the cabling leading out of the reflector. When handling the device in the future, please make sure to keep the wiring as undisturbed as possible. The setup is rather fragile, and moving the cabling around could potentially reintroduce a short like this.

      600   Fri Jun 27 15:38:22 2025 ChristinaUpdateTCSFROSTI Reconstruction

    [Tyler, Ma, Christina, Luke]

    We threaded the wiring of the heater elements through the reflective surfaces and were able to attach each piece with the Macor spacers and connect both sides. We used the guide rails and screws to ensure proper alignment. The only necessary step left is to add the additional external screws for the reconstruction.

    Attachment 1: IMG_4009.png
    IMG_4009.png
      492   Wed Dec 18 15:41:56 2024 TylerUpdateTCSFROSTI RIN
    [Tyler]

    I have begun the (hopefully) final RIN measurements at 3:30 PM today. If you need to go into the cleanroom at any time between now and Sunday (the 22nd), please do not touch the FROSTI, the Red Pitaya, the photodetectors, or any of the wiring.

      352   Sun Mar 24 11:49:27 2024 AidenUpdateGeneralFROSTI RGA Scan
    Took RGA data 1 day after the conclusion of Bake 13. Bake 13 ended on Saturday March 23, the RGA data shown was taken on Sunday March 24. The scan shows that the FROSTI is very clean with no outgassing. The HC levels are at 25 e-10. The pressure in the chamber was also a 1.64 e-8 Torr.
    Attachment 1: bake13_240324_FROSTI_ArC.png
    bake13_240324_FROSTI_ArC.png
    Attachment 2: bake13_240324_FROSTI_ArO.png
    bake13_240324_FROSTI_ArO.png
      499   Fri Jan 17 13:27:07 2025 TylerUpdateTCSFROSTI Pre-disassembly
    [Tyler, Ma, Cece, Jon, Luke, Cynthia, Michael]

    On Tuesday, we prepared the FROSTI for disassembly in anticipation of the APS filming that is set to take place in the labs. The FROSTI has been unbolted from the optical table in the cleanroom, with its wires weighted down and the majority of its screws removed to ensure an easy removal of the reflectors during the filming process.

    Attachment 1: IMG_1828.jpeg
    IMG_1828.jpeg
    Attachment 2: IMG_1830.jpeg
    IMG_1830.jpeg
      350   Tue Mar 19 15:22:27 2024 AidenUpdateClean & BakeFROSTI Legs Clean and Bake
    [Aiden, Luke]

    Cleaned and baked the Cal Tech FROSTI legs and showed Luke the procedure on how to clean parts.

      455   Wed Oct 2 14:49:59 2024 LiuUpdate FROSTI ETM actuation
    Proposed FROSTI ETM actuation on the HOM7 resonance. Animation
      501   Wed Jan 22 10:50:08 2025 TylerUpdateTCSFROSTI Disassembly
    [Tyler, Ma, Cece, Luis, Shane, Luke, Cynthia, Liu, Jon]

    On Tuesday (Jan 21), we took the FROSTI apart in front of a filming crew. It was a success! The footage is going to be used in an APS video detailing the experimental cosmology research conducted in the department.

    The FROSTI reflectors, heater elements, and legs were all bagged separately and a currently being stored in the cleanroom. If you need to do any work in there, please be mindful of these parts. The elements are currently on the shelf above the optical table, and the reflectors are placed on the table in the back corner.

    Attachment 1: IMG_1843.png
    IMG_1843.png
    Attachment 2: IMG_1844.png
    IMG_1844.png
    Attachment 3: IMG_1849.png
    IMG_1849.png
    Attachment 4: IMG_1850.png
    IMG_1850.png
      291   Mon Dec 11 16:20:17 2023 JonSummaryTCSFROSTI Assembly Procedure

    Below is the procedure we will follow to assemble the FROSTI prototype.

    1. Install SS guide rods and bottom Macor spacers in bottom reflector
    2. Install AlN elements on top of bottom Macor spacers
    3. Install upper Macor spacers on top of AlN elements
    4. Feed unterminated power and RTD leads through slots in upper reflector
    5. Install upper reflector, using guide rods to slowly lower into position
    6. Install vented SS bolts for reflectors; Macor bolts for heater elements
    7. Remove SS guide rods
    8. Bundle power and sensing cable with PEEK cable ties and SS cable mounts
    9. Terminate power and sensing cable bundles with PEEK DB25M connectors
      345   Wed Feb 28 17:49:18 2024 TylerUpdateTCSFROSTI Assembly - Days 2-3
    [Aiden, Jon, Luis, Luke, Michael, Tyler]

    FROSTI assembly was completed today. The RTD and power wires were terminated at the DB-25 connectors and the legs were put on. It is currently placed in front of the stand-in test mass (~5 cm away). The FLIR has also been moved back to it's nominal position. As of now, it appears there are some shorts within the power cabling. This will be a focus of tomorrow's work.

    Quote:
    [Jon, Tyler, Luis, Luke, Mohak, Cynthia, Michael, Aiden]

    FROSTI assembly began today. After a final set of RGA scans were taken, the vacuum chamber was vented and the reflectors were removed. The chamber was then resealed and pumped down again. 

    Today we completed the installation of the Macor hardware and heater elements between the two reflector halves. Tomorrow we will route, bundle, and terminate the power and sensor cables. 

     

    Attachment 1: IMG_0947.png
    IMG_0947.png
    Attachment 2: IMG_0956.png
    IMG_0956.png
    Attachment 3: IMG_0957.png
    IMG_0957.png
    Attachment 4: IMG_0959.png
    IMG_0959.png
      341   Mon Feb 26 21:23:27 2024 JonUpdateTCSFROSTI Assembly - Day 1
    [Jon, Tyler, Luis, Luke, Mohak, Cynthia, Michael, Aiden]

    FROSTI assembly began today. After a final set of RGA scans were taken, the vacuum chamber was vented and the reflectors were removed. The chamber was then resealed and pumped down again. 

    Today we completed the installation of the Macor hardware and heater elements between the two reflector halves. Tomorrow we will route, bundle, and terminate the power and sensor cables. 

    Attachment 1: IMG-20240226-WA0008.jpg
    IMG-20240226-WA0008.jpg
    Attachment 2: IMG-20240226-WA0006.jpg
    IMG-20240226-WA0006.jpg
    Attachment 3: IMG-20240226-WA0011.jpg
    IMG-20240226-WA0011.jpg
    Attachment 4: IMG-20240226-WA0010.jpg
    IMG-20240226-WA0010.jpg
    Attachment 5: IMG-20240226-WA0012.jpg
    IMG-20240226-WA0012.jpg
    Attachment 6: IMG_0944.png
    IMG_0944.png
    Attachment 7: IMG_0946.png
    IMG_0946.png
      542   Tue Mar 25 12:56:47 2025 TylerUpdateTCSFROSTI Analysis Finalization

    Upon final review of the FROSTI analysis included in the (hopefully) soon-to-be submitted instrument paper, I've made some adjustments to the reflectivity analysis that estimates the amount of power delivered to the test mass by the FROSTI. Initially, as detailed in elog 447, the delivered power was approximated to be 12.6 W (later adjusted to 12.9 W), with roughly 18% of this power being reflected by the test mass. After some final adjustments, this value now is closer to 12.0 W, with 10.2 W absorbed (15% power reflection). Below is a table showing the updated values for the FROSTI prototype tests:

    Old Value New Value
    Delivered Power 12.9 W 12.0 W
    Absorbed Power 10.6 W (18% reflectivity) 10.2 W (15% reflectivity)
    Measured Peak Temperature Difference 5.39 +/- 0.03 K 5.26 +/- 0.03 K
    Model Peak Temperature Difference 5.42 K 5.21 K
    Measured Peak OPD 765 +/- 9 nm 771 +/- 7 nm
    Model Peak OPD 630 nm 654 nm
    Attachment 1: FROSTI_OPD_profile.pdf
    FROSTI_OPD_profile.pdf
    Attachment 2: FROSTI_temperature_profile.pdf
    FROSTI_temperature_profile.pdf
      118   Mon Jun 12 12:15:10 2023 PamellaUpdateFLIRFLIR- Take data in the closest point.
    [Pamella]
    • Used the closest point possible for the reflector in front of the FLIR camera.
    • 11:32 am : Turned on the electronic device (current on) for started taking data.
    • 11:50 am: Started checking the temperature and the parameters.
    • 12:04 pm: Started taking snap after waited for 30 minutes with the current on. Parameters: Current: 0.13A , Volt: 1.8V and Temperature: 51.4 C.
    • Note: This snap is in the most close point possible, after that I should be change the reflector position and also the optical focus distance in the FLIR camera.
    • We can see, in the photo attached below, thought in this closest position the cable connect to reflector is a bit problem to take a good snap also the have issues to keep very uniform triangles (temperature) in the reflector.
    • To do: I'll change the position on the light inside to see if the problem it is in the focal point inside the reflector (mirror).
    Attachment 1: AcquisitionImage(Jun-12-2023_12_04).jpg
    AcquisitionImage(Jun-12-2023_12_04).jpg
    ELOG V3.1.3-7933898