ID Date Author Type Category Subject Text Attachments
  238   Wed Oct 11 20:47:11 2023 JonUpdateVACVacuum upgrade begins[Jon, Tyler, Aiden, Peter]
Upgrade of the UHV system to a larger
turbo pump began today. After obtaining a
 IMG_0619.pngIMG_0621.pngIMG_0618.png 
  237   Mon Oct 9 21:41:24 2023 AidenUpdateClean & BakeClean and Bake Batch 19Bagged and tagged the parts from batch 18.
Started the Copper batch that includes all
the gaskets needed to start the vacuum chamber
  
  236   Mon Oct 9 16:59:21 2023 Shane, JonUpdateCDStiming chassis power cable and AI chassis testing for CyMAC


[Shane, Jon]


Today's
CyMAC work: 

Finished assembling
external power supply cable for the timing
 IMG_1457.jpeg 
  235   Mon Oct 9 11:29:37 2023 TylerUpdateElectronicsPSD/CSD Plot UpdatesContinuing from Sophia's SURF Project this
summer: Plotting the Power-Spectral Densities
(PSDs) and Cross-Spectral Densities of two
 Screenshot_2023-10-09_at_11.20.25_AM.pngwelch_csd-2.png 
  234   Mon Oct 9 11:06:17 2023 PeterUpdateVLC UpdateVLC Launch ChainImplemented the new stage for the EOM. Took
power data at different positions in the
launch chain. Beam waist: 0.066mm (beam waist
 IMG-3540.jpgIMG-3538.jpgIMG-3533.jpgIMG-3522.jpg 
  233   Sat Oct 7 17:10:27 2023 AidenUpdateClean & BakeClean and Bake Batch 18Bagged and tagged the parts from Batch 17
and placed them in the clean room on the
optic table. Also started an aluminum batch
  
  232   Tue Oct 3 15:07:48 2023 AidenUpdateClean & BakeClean and Bake Batch 17Cleaned and baked all the stainless steel
parts in Batch 17. Check data base for more
details on this.
  
  231   Fri Sep 29 17:27:30 2023 Shane, JonUpdateCDSTiming chassis assembly progress (CyMAC)Worked on timing chassis assembly today for
the CyMAC, settled on layout (see attachment
1). Frequency synthesizer and frequency divider
 timing_chassis.jpegBI_chassis.jpeg 
  230   Fri Sep 29 11:53:54 2023 ShaneUpdateCleanroom5 zone particle count measurement in cleanroom Today's 5 zone measurement of cleanroom particulate
concentration is attached
 23.png23.png 
  228   Fri Sep 29 11:22:33 2023 Shane, AidenUpdateCleanroomcleaning and particle count


[Aiden, Shane]


cleaning
cleanroom and particle count


10:06 am: ran zero count
  
  227   Thu Sep 28 15:17:13 2023 AidenUpdateClean & BakeClean and Bake Batch 16Bagged and Tagged the parts from batch 15
and started baking batch 16 which includes
the 6" to 8" reducer.
  
  226   Fri Sep 15 17:33:35 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook some more RGA data and see that the chamber
has gotten much cleaner since monday. Next
step would be another bake with some focus
 bake5_230915_ArC.pngbake5_230915_ArO.png 
  225   Thu Sep 14 17:05:38 2023 Shane, JonUpdateCDSTiming chassis setup and testingTested the setup today for the timing chassis
(intended to provide the timing reference
for the CyMAC). Was able to read the correct
  
  224   Tue Sep 12 15:31:31 2023 AidenUpdateClean & BakeClean and Bake Batch 15Cleaned and Baked the SS screws for the heater
mount. Check the Clean and Bake data base
on the website to get a precise list of the
 IMG_4647.jpg 
  223   Mon Sep 11 16:02:42 2023 AidenUpdateVACVAC System Heating UpdateThe chamber has cooled down from bake 5 and
I took the first set of data. The pressure
measured during the RGA measurements reached
 bake5_230911_ArO.pngbake5_230911_ArC.png 
  222   Fri Sep 8 16:10:43 2023 AidenUpdateVACVAC System Heating UpdateTurned off the PID controllers to let the
chamber cool down. Final temperatures for
the RGA cross and Turbo pump cross were 113
  
  221   Thu Sep 7 19:24:25 2023 PeterUpdateVLC UpdateVLC Launch ChainThe launch optics up to the Faraday Isolator
have been added to the breadboard. In the
first image, the optics are (from L to R)
 IMG-3404(1).jpgIMG-3408(1).jpg 
  220   Tue Sep 5 16:43:19 2023 AidenUpdateGeneralVAC System Heating UpdateChecked on bake 5 today after 3 days of equilibrium.
The RGA cross is at 106 C and the turbo pump
cross is at 74 C. This was reached while
  
  219   Fri Sep 1 19:21:19 2023 AidenUpdateVACVAC System Heating UpdateStarted bake 5 today. This will hopefully
be a longer and hotter bake with it lasting
6-7 days at around 150 C. The pressure in
  
  218   Thu Aug 31 12:56:29 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook some more RGA data to see if the HC levels
have further declined since bake 4 and it
seems that it has started to plateau with
 bake4_230831_ArC.pngbake4_230831_ArO.pngbake4_230829_ArO.png 
  217   Tue Aug 29 22:07:38 2023 AidenUpdateGeneralElectronic BenchDr Richardson is working on mounting more
power supplies in the server rack and is
using the electronics bench. Be aware to
 IMG_4632.jpg 
  216   Tue Aug 29 19:09:21 2023 AidenUpdateVACVacuum Chamber Baking UpdateHere are some more plots with the RGA data
take August 29. It seems that more pumping
time has led to the HC levels being dramatically
 bake4_230829_ArO.pngbake4_230829_ArC.png 
  215   Mon Aug 28 14:43:50 2023 AidenUpdateVACVacuum Chamber Baking UpdateThe PID controllers were turned off on Friday
and the chamber was left to cool over the
weekend. Just took data and it looks like
 bake4_230828_ArC.pngbake4_230828_ArO.png 
  214   Mon Aug 21 17:13:25 2023 AidenUpdateVACVacuum Chamber Baking Update
Came in to take RGA data and found the
turbo pump drawing .38 Amps. This was much
higher than what it was on Friday. I investigated
 bake3_230821_ArC.pngbake3_230821_ArO.png 
  213   Thu Aug 17 15:18:48 2023 AidenUpdateVACVAC Heating System UpdateRelocated the PID controllers so that the
heating tape could be plugged in. In the
picture the left one controls the top half
 IMG_4628.jpg 
  212   Thu Aug 17 15:02:44 2023 AidenUpdateVACVAC Heating System Update
Put the heating tape back on and made
sure to have 4 coils around the barrel of
the chamber. To make this happen I did not
 11x 
  211   Wed Aug 16 17:17:02 2023 Shane, JonUpdateCDSBinary input chassis powering correctly Binary input chassis passed power-on test,
and is lighting up as expected. Binary output
chassis also successfully powered on. AA
 IMG_9253.jpeg 
  210   Wed Aug 16 16:55:40 2023 Shane, JonUpdateCDSexternal power supply cables finishedAll four external power supply cables for
the CyMAC chassis are now assembled. Using
them now to test if chassis power up correctly.
 IMG_9251.jpeg 
  209   Tue Aug 15 16:10:06 2023 CelesteUpdateTCS8/15/2023 Simulation Progress   Simulation_Progress__1_32nd_Model_(2).pdf 
  208   Tue Aug 15 16:04:23 2023 AidenUpdateVACVAC Heating System Update
Pulled off the rest of the heater tape
along with the aluminum tape left behind.
The aluminum tape adhesive left behind a
 6x 
  207   Tue Aug 15 13:32:37 2023 SophiaUpdateScripts/ProgramsUpdate on Laser Noise Data Collection and Analysis: Dynamic CSD and PSD PlotsI have now fixed all issues that I was having
this morning, and have added text boxes which
show the peak values of both PSD's and the
 Screenshot_2023-08-15_at_4.27.58_PM.pngScreenshot_2023-08-15_at_2.21.18_PM.pngScreenshot_2023-08-15_at_5.25.05_PM.png 
  206   Tue Aug 15 10:35:00 2023 SophiaUpdateScripts/ProgramsUpdate on Laser Noise Data Collection and Analysis: Dynamic CSD and PSD PlotsI have successfully added a button to my graphics,
but it has posed a strange issue with the
CSD and PSD values. When I plot my original
 Screenshot_2023-08-14_at_8.18.49_PM.pngScreenshot_2023-08-14_at_8.18.43_PM.pngScreen_Recording_2023-08-14_at_8.17.50_PM.movScreenshot_2023-08-15_at_1.24.54_PM.pngScreenshot_2023-08-15_at_1.32.30_PM.png 
  205   Fri Aug 11 18:32:00 2023 AidenUpdateVACVAC System Heating Update
[Dr. Richardson, Aiden] Large Update


Removed
most of the insulation on the chamber in
order to pull back some of the heater tape
 11x 
  204   Fri Aug 11 10:57:20 2023 CelesteUpdateTCS8/11/23 Simulation Progress   Simulation_Progress__1_32nd_Model_(1).pdf 
  203   Thu Aug 10 18:32:39 2023 AidenUpdateVACVAC System Heating Update
[Dr. Richardson, Aiden]


DO NOT TOUCH ANY VALVES ON THE
CHAMBER. THERE IS A PRESSURE DIFFERENTIAL
 IMG_4588.jpg 
  202   Thu Aug 10 15:10:12 2023 JonUpdateVACVAC System Heating UpdateI shut down the turbo pump since this is evidently
a large leak. We CANNOT turn on the RGA for
leak checking with the pressure above 1E-5
  
  201   Thu Aug 10 14:36:00 2023 AidenUpdateVACVAC System Heating UpdateCame in to install one of the Full range gauges.
Checked the temperature first of the cross
and it was reading 30 C. After installing
  
  200   Thu Aug 10 14:13:38 2023 CelesteUpdateTCS8/10/23, Simulation Graphical Progress   Simulation_Progress__8_10_23.pdf 
  199   Wed Aug 9 17:35:26 2023 ShaneUpdateCDSBinary output chassis finishedFinished the internal wiring for the binary
output chassis today, which completes its
assembly. Also secured ribbon cables and
 IMG_8685.jpegIMG_8686.jpeg 
  198   Wed Aug 9 11:32:56 2023 JonInfrastructureGeneralNew power cablesI delivered new NEMA 5-15 (120V / 15 A)
power cables to the lab for the following
items:
 IMG_0299.jpg 
  197   Tue Aug 8 17:03:22 2023 Shane, JonUpdateCDSBinary input chassis finishedFinished assembly of the binary input chassis
today, including DC on/off switch and LED
installation. external cable assemblies still
 IMG_8681.jpeg 
  196   Tue Aug 8 16:47:11 2023 SophiaUpdateScripts/ProgramsUpdate on Dynamic CSD and PSD PlotsWe have fixed our rapid plotting error, and
realized that this has not been affecting
our data intake! Below is a video of the
 Screen_Recording_2023-08-08_at_7.42.30_PM.movScreenshot_2023-08-08_at_2.22.50_PM.pngScreenshot_2023-08-08_at_5.16.08_PM.png 
  195   Tue Aug 8 15:31:26 2023 AidenUpdateVACVAC Heating System Update
Vacuum Chamber equilibrium temperature
for bake 3 are 126 C and 88 C for the chamber
wall and turbo pump flange respectively.
 10x 
  194   Mon Aug 7 15:36:18 2023 SophiaUpdateScripts/ProgramsUpdate on Laser Noise Data Collection and Analysis: Dynamic CSD and PSD PlotsToday I was able to fix the red pitaya's plotting
problem, and get my code to recognize driving
frequencies from the function generator to
 7x 
  193   Mon Aug 7 13:58:46 2023 shaneUpdateCDSinternal power supply cables done for AI chassisFinished assembling and installing the aLigo
chassis internal power supply cables in the
anti-imaging chassis today. Tested for continuity
 IMG_8674.jpeg 
  192   Fri Aug 4 15:21:33 2023 AidenUpdateVACVAC System Heating UpdateChecked on Bake 3 today and the temperature
sensors read 126 C and 91 C for the chamber
barrel and turbo pump flange respectively.
  
  191   Thu Aug 3 18:03:42 2023 Shane, JonUpdateCDSAnti-Aliasing chassis completeWe finished installing the internal power
supply cables in the anti-aliasing chassis
today, which concludes its assembly. Work
 IMG_8544.jpeg 
  190   Thu Aug 3 17:47:51 2023 AidenUpdateVACVAC Heating System Update
Did some further testing to determine
if it was within reason to increase the temperature
of the chamber. I used a thermometer and
  
  189   Thu Aug 3 16:00:25 2023 AidenUpdateVACVAC System Heating UpdateCheck on the temperature of the bake today
to see the equilibrium temperatures. With
both of the PID controllers set to 150 C,
  
  188   Wed Aug 2 17:02:38 2023 AidenUpdateVACVAC System Heating Update
Moved the temperature sensor on the PID
controller to one of the switch backs on
the lid.


Also started the next
  