ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 7 of 9  Not logged in ELOG logo
Entry  Tue Jul 4 15:35:38 2023, Pamella, Update, FLIR, FLIR - reflexion problem AcquisitionImage(Jul-03-2023_14_29).jpgAcquisitionImage(Jul-03-2023_14_31).jpgAcquisitionImage(Jul-03-2023_14_49).jpgCaderno_sem_título_(26)-2.jpgparabol1.print.png
[Pamella]

I was testing all the positions we need to cover when moving the FLIR camera or the reflector. I tried to find out more about the problem so
I tested the position without the mask, just with the old bridge and I got the same problems, in the middle of the screen we have a very good image but
if we move we have the visualization problem and we don't see the reflection very well (intensity, emissivity) in FLIR.
For this test I used very low
Entry  Mon Jul 3 18:38:13 2023, Pamella, Update, FLIR, FLIR project Region.jpgtriangular_region_temperature-2.jpgheatmap.jpgisolation1-4.jpg
[Pamella]


I was able to work on the python code to do analysis on the FLIR-Reflector data.
I could plot images of total area (Tyler
help me on that) with csv file and also could have isolation area for triangles. I have attached examples below. Just for now the images are of different
data, so there are some differences in the shapes.
I'm working on getting a complete analysis code to work with the different positions of the
Entry  Mon Jul 3 16:26:21 2023, Cao, Infrastructure, DAQ, Access and control Red Pitaya remotely and run it on local machine 
[Cao]


To access and control the Red Pitaya using Python locally on a machine within the local network, one should follow these steps:

 

Start the SCPI server. This is achieved by first log onto the Red Piatay page 
rp-xxxxxx.local/ 
  Go to Development >> SCPI server and turn the server on. (Note : The server is currently running)

Entry  Mon Jul 3 14:32:24 2023, Cao, Infrastructure, VAC, Cooling down vacuum chamber 
[Cao]

 
After leaving the the chamber to bake at 120 deg C from Thursday 3:41 pm. Today I started to cool the chamber down to room temperature at
11:30 am (total bake duration: 91 hours 49 minutes). Ideally, this process should be ramped down slowly, approx. 6 degree per hour. However we had no ramping
function with out controller. The only method to tune this cool/ heat rate is to tune the PID parameters, which are:


  Pb : Proportional
Entry  Fri Jun 30 16:43:14 2023, Pamella, Update, FLIR, Updates: Small moving the FLIR camera AcquisitionImage(Jun-30-2023_16_23)_(3).jpgAcquisitionImage(Jun-30-2023_16_23)_(1)(1).jpgAcquisitionImage(Jun-30-2023_16_24).jpgAcquisitionImage(Jun-30-2023_16_22)_(1)(1).jpgAcquisitionImage(Jun-30-2023_16_22)_(1).jpg
     [Pamella] 

Today, I was able to make some adjustments to the FLIR camera angle, suggested by  Dr. Richardson, and we got small possible movements
keeping the same pattern in the shapes of the triangles. I have attached photos below. I was able to move left and right as well as up and down and it
worked in four points that I marked on the table.
The only problem is that it only worked on a part of the screen, if I try to place it farther
Entry  Fri Jun 30 15:57:28 2023, Pamella, Update, FLIR, Data and python code update  isolation1-2.jpgAcquisitionImage(Jun-29-2023_18_27)_(1).jpgAcquisitionImage(Jun-29-2023_18_38).jpgAcquisitionImage(Jun-29-2023_18_39).jpg

 [Pamella] 
 Updates: Problems with the emission intensity and python code. 
 Yesterday I was working on get data from FLIR
reflector but unfortunately we got some problems:  
 

 I realized than if I move the reflector a to left or right the screen
doesn't get data very well(I attached a photo below). This is a problem because our idea is have the same type of emission every part on screen. Tyler
Entry  Thu Jun 29 18:27:26 2023, Jon, Cao, Infrastructure, VAC, Vacuum bake attempt 3: success! NewInsulation.pngBypassLineInsulation.jpg
[Jon, Cao]


 Summary : We resolved problems with heaters tripping power and were able to proceed with chamber baking


 1. Circuit connection adjustment 


After yesterday elog 137, today we resolved
most of these issues. After Jon contacted Facilities, the LP3B 6 circuit was reset and the cleanroom filter & light panels resumed to work as normal. 
Entry  Wed Jun 28 15:58:56 2023, Shane, Cao, Infrastructure, VAC, Power trip problem remains, source of smoke is insulation Pumpline_afterRemoveInsul.jpgRGAline_afterRemoeInsul.jpgMeltedInsulation1.jpgMeltedInsulation1.jpgMeltedInsulation2.jpg
[Shane, Cao] 


With the new change in wiring configuration described in elog 136, we tried
to power up the heaters for baking the vacuum chamber again.



Given that we were worried about the turbo pump overheats, we set the setpoints of of bother high temperature  controller and PID controller to
Entry  Wed Jun 21 20:25:05 2023, Cao, Infrastructure, VAC, Vacuum chamber bake attempt 1 6x
 TL;DR: 
We are not yet able to bake the chamber at 150 deg C due to some current limit, most likely caused power supply switching off. Also,
smoke was observed at some insulation points, mainly in the small arm sections, This is likely because the insulation does not fit well and the velcro
came into direct contact with heat tape. Some Velcro (made from Nylon/ Polyester) has lower melting temperature point (in 90-120 deg C range)

 Full
    Reply  Tue Jun 27 21:47:56 2023, Jon, Infrastructure, VAC, Vacuum chamber bake attempt 1 IMG_0256.pngIMG_0257.pngIMG_0254.png
The electrical overload problem encountered in ELOG 130 has been resolved. The two heater controllers,
which draw up to 14.1 A each, overloaded the UPS and tripped one of its circuit breakers, shutting off power to both power strips mounted above the optical
table.
Entry  Tue Jun 27 15:18:26 2023, Pamella, Update, FLIR, New data collection FLIR_data.002.jpegFLIR_data_2.002.jpeg
  
[Pamella]



  Yesterday, I did a new data collection.  I could get a better data in this time and I realized than I need use some
angle on the reflector for got a better shot. I need do that because the FLIR camera just is able to get the triangle shape for complete if I keep exactly
in same line for center point on the camera but for the data now I need move the refletor to go up and go down. So wasn't working very well if I keep the
Entry  Tue Jun 27 14:04:42 2023, Sophia A. , Update, Measuring Noise in Interferometer, Interferometer set up and connection to red pitaya IMG_6756.jpgIMG_6754.jpgIMG_6755.jpg
Today we (Sophia and Tyler) constructed the set-up for the electrical noise calculation that I will be conducting this summer. I have included images of
the setup below. Our system is effectively a green laser, that feeds into a type of polarizer, then into a beam splitter which sends the laser light down
two arms into detectors. We started by connecting the detectors to an oscilloscope to determine whether the signal will exceed 1V, as the red pitaya (our
Entry  Tue Jun 27 12:09:37 2023, Shane, Update, Cleanroom, cleanroom 5 zone particle count measurement 23.png
Attached is 5 zone measurement for cleanroom particulate count. Zone 3 (in front of vacuum chamber) higher than usual, likely due to recent vac work. Slightly
above ISO class 5 standard in 1.0 micron range, measuring 997 particles/cubic meter while ISO standard is 832 particles/cubic meter in this range. 

Zero
count test on particle counter performed prior to today's measurement. 
Entry  Fri Jun 23 15:47:06 2023, Pamella, Update, FLIR, Collecting data - Moving horizontal and vertical on screen. 6x
[Pamella]

 
 02:09 pm: Turned on the device (current on) 
 02:42 pm: Started taking snap on position one (Reference point: 0,-0.062).
Parameters:0.10A,1.5V,41.5C   
 I took multiplier snap on the same position for compare after on data analyzes. I just wanted one/two minute
break between the snaps.  I did that same for every position.  
 02:55 pm: Started taking snap on position two (Reference point:-0.10,-0.062
Entry  Thu Jun 22 13:58:00 2023, Pamella, Julian and Shane, Update, Cleanroom, Cleaning and Particle Count 



[Pamella, Shane, and Julian]
cleaning cleanroom and particle count



12:00 pm: started particle
count

 Zone 3
 0.3u: 3533
0.5u: 540
1.0u: 166


 Zone 4
 0.3u: 290
0.5u:
124
1.0u: 41


12:31 pm: Started checking the surface inside the cleanroom and began surface wipedown
12:50
Entry  Tue Jun 20 22:14:24 2023, Pamella, Cao, Infrastructure, VAC, Short term testing of vacuum heater controller units 
[Pamella, Cao]

 
 Fuse replacement 

 Replace blown 10A fuse in ucontroller outside cleanroom 
 Replace 10 A fuse in
main power connection slot of the controller unit inside cleanroom 
 Pamella wiped down unit outside cleanroom.  
 Controller units
turned on and temperature setpoint set to be 80 deg C 
 Temperature settle in approx. 15 minutes(as recorded by the RTD).  No problems with
Entry  Tue Jun 20 17:28:23 2023, Pamella, Update, Electronics, Heater system parts - Wiped  IMG_7696.jpg
[Pamella]

    
Heating system 

    Wiping the heater system parts.
     04:37 pm: Started wiping the electronic device
part for the heater system (HL101 Series Digital Benchtop temperature limit control).
     05:19 pm: Finished wiping the parts to the heater
system (HL101 Series Digital Benchtop temperature limit control). I wiped the HL101 Series Digital Benchtop temperature limit control and I didn't bagged
Entry  Mon Jun 19 11:20:57 2023, Pamella, Update, FLIR, FLIR - Fixed some problems AcquisitionImage(Jun-19-2023_11_00).jpg
[Pamella]

    08:59 am: Turned on the electronic device (current on) for started taking data.
    09:37 am: Tried understanding the
error in the focal point. I realized the pillars was in the wrong place and because of that we got problems to keep the reflector in the correct position
to FLIR focus.
    09:58 am: Started checking the temperature and the parameters.Changed the pillars to the original position (0.5645m) just
Entry  Fri Jun 16 17:40:28 2023, Aiden, Update, Clean & Bake, Clean and Bake Batch 14 IMG_4441.jpgIMG_4440.jpg
Cleaned and Baked the new and 2.75" copper gaskets for the vacuum system. Cleaned them with liquinox in the ultra sonic washer for 10 minutes. Then dried
them with nitrogen. Then put the copper parts into the oven for the following steps; 1. Ramp to 100 degC in 15 minutes 2. Dwell at 100 degC for 30 minutes
3. Ramp to 175 degC in 30 minutes 4. Dwell at 175 degC for 24 hours 5. Turn off

Also bagged and tagged the parts from Batch 13 and placed them into
Entry  Fri Jun 16 16:17:13 2023, Pamella, Update, FLIR, FLIR - Change the position IMG-7637.jpg
[Pamella]

    Today I change the distance between the FLIR camera and reflector (3D-Mask with mirrors and light). Now the distance is 0.3282 m.

   Note: In this distance is possible move up and down the reflector and take data to compare.
    The focal point inside the reflector keeping
like little problem, every time I tried adjust this I got some triangles is not with "perfect emission" (looks like different than the others). Also if
Entry  Wed Jun 14 15:35:36 2023, Pamella, Update, VAC, Heating system installation  heater_equipment_install.jpg
[Pamella and Cao]

    Heating system installation - Second day.


    Today we kept installing the equipment for the heating system.

   First: Started installing the two heating cable around the chamber vacuum, the arms and covered it with aluminum tape.
    Second: Started
installing the insulation stuff around the vacuum chamber and around the connections points (the arms) in the vacuum chamber.
    Third:Started
Entry  Tue Jun 13 21:33:46 2023, Pamella, Update, General, New cabinet for PPI 
[Pamella and Dr.Richardson]

Dr. Richardson installed the new cabinet outside the room for the PPI equipments, and then I wiped all surfaces inside
and outside of the new cabinet. 
 Dr.Richardson and I have finished organizing the PPI within the new cabinet. Also we have new supplies of gloves,
and will likely have more supplies for other PPIs soon. 
Entry  Tue Jun 13 21:08:46 2023, Pamella, Infrastructure, VAC, Heater system - Installation IMG_7563.jpegIMG_7561.jpeg
[Pamella, Cao and Jon]


 Heating system installation 

 Today we started installing the equipments for the heating system. 

 First: Started installing the heating cable on the top lid and covered it with aluminum tape.
Second: Started installing the insulation
cover on top of the chamber lid.
Third:Started installing the heating cable from under the vacuum chamber and covered with aluminum tape. 
Entry  Tue Jun 13 13:25:05 2023, Aiden, Summary, Clean & Bake, Clean and Bake Batch 13 
Cleaned and Baked the new 1.33" and 2.75" blanks for the vacuum system. Cleaned them with liquinox in the ultra sonic washer for 10 minutes. Then dried
them with nitrogen. Then put the two stainless steel parts into the oven for the following steps;
1. Ramp to 100 degC in 15 minutes
2. Dwell at 100 degC
for 30 minutes
3. Ramp to 200 degC in 30 minutes
4. Dwell at 200 degC for 48 hours
5. Turn off
Entry  Tue Jun 13 10:28:50 2023, Pamella, Update, General, Wiped and bagged the heating and cords. heater_cords_wiped.jpg
[Pamella]


    Cleaning the heater system parts.
    09:13 am: Started wiping the last parts for the heater system (heating and cords).

   10:18 am: Finished wiping the parts to the heater system (heating and cords). I wiped, tagged and bagged the heating and cords. 
    
Note: In some parts looks like the silicone insulation material is having some sort of residue on the wipe so I wiped very careful this part and just for
Entry  Mon Jun 12 18:52:00 2023, Pamella, Update, General, Heater system parts - Wiped and bagged heater_equipment_wiped.jpg
[Pamella]
  Cleaning the heater system parts.
 04:32 pm: Started wiping the heater system parts.  
 06:38 pm: Finished wiping the heater
and some parts to the system. I wiped, tagged and bagged the heater system, power cables, adapter cables and power connectors. Also I wiped, bagged and
tagged the aluminum foil tape.
 06:43 pm: I putted all bags inside the cleanroom. 
 To do: I started but I was not able to finished
Entry  Mon Jun 12 12:15:10 2023, Pamella, Update, FLIR, FLIR- Take data in the closest point. AcquisitionImage(Jun-12-2023_12_04).jpg
[Pamella]

 Used the closest point possible for the reflector in front of the FLIR camera. 
11:32 am : Turned on the electronic device
(current on) for started taking data.
11:50 am: Started checking the temperature and the parameters. 
12:04 pm: Started taking snap
after waited for 30 minutes with the current on. Parameters:  Current: 0.13A , Volt: 1.8V and Temperature: 51.4 C.
Note: This snap is in the
Entry  Thu Jun 8 14:51:58 2023, Pamella, Update, FLIR, FLIR- Distance AcquisitionImage(Jun-08-2023_14_33).jpgthumbnail_IMG_7441.jpg
[Pamella, Tyler]


 Today we change the distance between the FLIR camera and reflector (3D-Mask with mirrors and light). Now the distance is
0.2032 m.
 Note: This distance is just for take a snap most close possible but we need move again for a little far way because in this distance
we can't move up and down the reflector for have data to compare. 
Entry  Tue Jun 6 16:15:09 2023, Peter, Update, VLC Update, Launch Optics for Visible Light Cavity IMG-0882.jpgIMG-0883.jpg
I assembled the first few components of the launch optics for the visible light cavity. Below is an image of the current table configuration, and the image
is how the cavity will be oriented on the table. 
Entry  Tue Jun 6 16:04:46 2023, Aiden, Update, General, Water 
Aiden went and refilled the de-ionized water to continue clean and bake batches.
Entry  Fri Jun 2 14:28:40 2023, Pamella, Update, FLIR, FLIR project - Test without the black wall. 1Axis_y___tests.jpg
[Pamella]

    
Test without the black wall. 

    Note: So today i collected data for some positions in axis Y (height) for starting
analyses and compares the triangles shapes. I tried keep the same parameters every time.


 
    First position:
   01:20 pm :
Started testing and collection data. Parameters: 0.10 A, 1.6V. Reference position: (0,0.05).
    01:30 pm : Started snapping the screen. Parameters:
Entry  Thu Jun 1 14:41:36 2023, Pamella, Update, FLIR, FLIR project - Test without the black wall. thumbnail_IMG_7316.jpgAcquisitionImage(Jun-01-2023_14_14).jpgthumbnail_IMG_7320.jpg
[Pamella]


Test without the black wall.
 General test:.
 11:15 am : Started running the code. Parameters: 0.11 A, 1.9V and
focus distance around 0.55m.
 11:28 am : Started snapping the screen. Parameters: 0.12 A, 1.8V and 44.1 C .
 First trying: 

01:18 pm : Started testing and collection data. Parameters: 0.09 A, 1.4V. Reference position: (0,0). 
 01:28 pm : Started snapping the screen.
Entry  Wed May 31 16:55:55 2023, Pamella, Update, FLIR, FLIR- Focus distance AcquisitionImage(May-31-2023_16_40).jpgthumbnail_IMG_7310.jpg
[Pamella and Tyler]

We changed the FLIR Focus Distance for around 0.55 m.
Note: The old focus distance was 1.3 m.

We
tested this new focus distances and looks good. I attached a snap below. 
Parameters: 0.1 A , 1.5 V and 38.4 C.
Entry  Wed May 31 16:18:41 2023, Aiden, Summary, General, Mock FROSTI IMG_4394.jpg
Finished assembly on the Mock FROSTI so it is ready for the fit test at LIGO lab.
Entry  Wed May 31 12:16:28 2023, Shane, Update, Cleanroom, cleanroom particle counts (full 5 zone measurement) 23.png
Attached is the full 5 zone particle measurement for the cleanroom after this week's cleaning, 5/31/23.
Entry  Wed May 31 11:42:16 2023, Pamella, Julian and Shane, Update, General, Cleaning room and particle count 
[Pamella, Shane and Julian]


 Cleaning room and particle count 

  09:58 am: Started the particle count 
Zone
3:  
     0.3u : 1,995 
     0.5u : 540 
     1.0u : 0 


    Zone 4:  
     0.3u : 124 
  
  0.5u : 0 
     1.0u : 0 




 10:25 am: Started checking the surfaces inside the cleanroom. 
 10:30
Entry  Tue May 30 14:51:27 2023, Pamella, Update, FLIR, New 3D mask - Bigger triangles shapes. AcquisitionImage(May-30-2023_14_38).jpgthumbnail_IMG-7303.jpg
[Pamella]

 Change the 3D mask 
 Started removing the old mask in the reflector.
 Started cutting the new aluminum lid for the
new 3D mask and assembling in the 3D mask.  
 Started doing the new cable connections for the light. 
 Started testing the resistance
in the new cable connections. The multimeter show us 14.2 Ω. 
 Started attaching the mask with the light and the thermometer sensor. 
Entry  Wed May 24 14:28:26 2023, Peter, Update, VLC Electronics, Laser intensity/polarization drift measurements Time_Series_Trial_7_16hrs.pngPower_vs_Time_16hrs.pngPolar_angle_vs_time_16hrs.pngRel_Intens_vs_time_16hrs.png
I went in and took polarization drift data for 16 hours. The run started at 6:08pm and finished at 9:15am the next day. The four plots below are the same
plots shown for the 2 hour collection and previous trials, except they extend to 16 hours. The only one that is different is the Power vs. Time graph.
This is a graph of the actual incoming power of the laser (as opposed to the signal voltage that the PDA's output into the red pitaya). This was done using
Entry  Wed May 24 14:06:27 2023, Pamella, Update, FLIR, FLIR project - Tests AcquisitionImage(May-24-2023_10_50).jpgthumbnail_IMG-7146.jpgAcquisitionImage(May-24-2023_14_30).jpg
[Pamella]


 Initial tests 
 10:30 am : Started trying take some test with the new position/configuration between the 3D reflector-mask
and the FLIR camera. 
 10:41 am : Started running the python code and take a snap. Parameters: 0.10 A, 1.4 V.
 10:50 am : Started take
the snap.It is possible see the triangles, this is a good thing. Negative thing: The middle/center point for the light maybe would be some problems for
Entry  Tue May 23 16:52:56 2023, Pamella, Update, FLIR, FLIR project - Reinstalling the mask and Reconfiguration FLIR position. AcquisitionImage(May-23-2023_16_36).jpgReconfiguration.jpg
[Pamella]


 Reinstalling the mask and Reconfiguration FLIR position.
 Today i change the aluminum foil inside the 3D mask. After some
 tries i was able to have a better shape for the triangles. 
 I reinstalled the connections (the light with the thermometer point). Also i checked
for the focal point inside the reflector, looks fine. 
 I did a reconfiguration for the initial tests, without the black wall. I moved the FLIR
Entry  Mon May 22 17:08:50 2023, Pamella, Update, FLIR, FLIR project - Installing the mask. Mask.jpgAcquisitionImage(May-22-2023_16_35).jpgAcquisitionImage(May-22-2023_16_01).jpg
[Pamella]



 The new mask for the reflector.  


 1:40 pm: Started reconfiguration on the FLIR camera project. Changed the
old bridge for the new mask-bridge. 
 2:00 pm: Started figure out the best way to cutting the aluminum foil with the new mask. Unfortunately,
I had been some problems for cutting the perfect shape triangles with the mask because the size inside the triangle is different (smaller) than  cutter/knife,
Entry  Mon May 22 16:43:28 2023, Peter, Update, VLC Electronics, Laser intensity/polarization drift measurements S-P_Polarization_Diagram.svgPolar_angle_vs_time.pngRel_Intens_vs_time.png
In order to fully analyze the polarization data taken last Thursday, I needed to convert the signal output (which is in volts) to power (units of watts).
I used the power meter to accomplish this. Keeping the exact same configuration of PD's and beam splitting, opened the red pitaya's oscilloscope package.
I then took the power meter, and held it in front of the PD to measure the amount of Watts at each PD. I then wrote down the corresponding voltage being
Entry  Thu May 18 14:07:08 2023, Peter, Update, VLC Update, 532nm Intensity Measurement Time_Series_Trial_4.pngTime_Series_Trial_5_2hrs.png
I figured out a method in which to capture power measurements including the initial seconds in which the beam is first turned on. I first clear and restart
the kernel of the python notebook. Then I run the command to connect the red pitaya oscilloscope package to the input data being taken in both channels.
To my understanding, this allows for data acquisition as the code compiles. I then started looping the 1.074s trigger bunches, and then roughly 2 seconds
Entry  Wed May 17 12:18:08 2023, Pamella, Julian and Shane , Update, General, Cleaning room and particle count 
[Pamella, Julian and Shane]



Particle count: 
  10 am: Started particle count 

 Zone 3 :

 0.3u: 1288  

0.5u: 332 
 1.0u: 124 


 Zone 4 :

 0.3u: 498 
 0.5u: 166 
 1.0u: 83 




10:40 am: Checked the surfaces inside the cleanroom. 
 10:50 am: Started vacuuming the cleanroom. 
 11:15 am: Started mopping the cleanroom.
Entry  Tue May 16 11:56:33 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement Time_Series_Trial_3.png
With the configuration the exact same as before, I used the Jupyter notebook in the red pitaya's development package to collect data from both input channels.
Last week, I was able to take data, yet only for a very short period of time, and I did not know how to change it. I went online to the red pitaya's user
manual to figure out how to change the sampling period for longer. The link to the page is here:    https://redpitaya.readthedocs.io/en/latest/appsFeatures/examples/acqRF-samp-and-dec.html#s-rate-and-dec
Entry  Sun May 14 15:50:48 2023, Cao, Infrastructure, Computers, High resolution display of logrus machine 
[Cao]

 
The display resolution of the logrus has been 1064x768 and has been the only option, which is not great. While remote access to logrus using
rdesktop allows rendering a virtual display of user's chosen resolution, it is not fast when using graphic-intensive program. NoMachine allows user to
take over and control the machine remotely and thus appears as the same machine. However, NoMachine cannot render a virtual display like rdesktop. This
Entry  Fri May 12 20:28:34 2023, Aiden, Cao, Physics, VAC, Vacuum chamber Helium leak test PXL_20230512_211717602.jpgArLeak_230512.png
 [Aiden, Cao] 

 
 1. Helium leak test 

 2:00 pm: Uninstall regulator from nitrogen gas tank and move to helium gas tank. Place helium onto
cart and move to the rear door of the clean tent. With the tank remaining outside, feed hose through the flexible wall to use in clean tent -  See attached
Entry  Wed May 10 10:49:34 2023, Aiden, Update, General, RGA Software 
[Aiden, Cao]

Went over how to use the RGA software, how to change the graph units, scaling and mass detection. Also went over how to remove the RGA from
the vacuum system as well as procedure for turning it on.
Entry  Tue May 9 20:55:12 2023, Jon, Infrastructure, VAC, Calibrated Ar leak rate VTI-Calibrated-Ar-Leak.jpeg
For future reference, the calibrated Argon source has a leak rate of 7.55E-8 atm cc/s, or equivalently 5.74E-8
torr L/s. This can be used to calibrate RGA scans to units of physical leakage (outgassing) rate.
Entry  Wed May 3 19:03:47 2023, Julian,Pamella and Cao, Physics, VAC, Modify vacuum asssembly and install RGA vaccum_chamber_re-configuration.jpg
[Pamella, Julian, Cao]

   Today we started re-configuring the vacuum chamber components. 

 Particle count 

 10:45 am : Starting
the particle count in the clean room. 
 11:13 am : Finished the particle count in the clean room. 




  Zone 3 :


 0.3 u: 2535 
 0.5 u: 1413 
 1.0 u: 789 


  Zone 4 :
  0.3 u: 457  
      0.5
    Reply  Tue May 9 15:49:20 2023, Jon, Infrastructure, VAC, Permanent cable routing 
Today I brought in a fresh supply of zip ties (we now have 1500 in the tool chest) and used them to permanentize the cable routing for the gauges, pumps,
and RGA.
I also brought and installed a 3-foot 15A extension cable for powering the scroll pump. Installing the cable required shutting down the pumps,
Entry  Mon May 8 12:00:03 2023, Pamella, Shane, Julian, Update, General, Cleanroom particle counts and cleaning the cleanroom. 
[Pamella,Julian, Shane]


Today we cleaned the clean-room (floor, surfaces) and particle count.



10:00 am: Started particle count.


 Zone 3:  
 0.3u: 1330 
 0.5u: 540 
 1.0u: 415 

 Zone 4: 
 0.3u: 290 
 0.5u:
83 
 1.0u: 0 





Clean-room:
 10:30 am: Started wiping down the surfaces inside the clean-room 
 10:41 am:
ELOG V3.1.3-7933898