ligo-ex
ligo-ds
|
Richardson Lab Experimental Log, Page 5 of 11 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Mon Sep 16 07:28:16 2024, Luke, Update, Interferometer Simulations, Ring heater update
|
Sat Jul 13 15:09:04 2024, Luke, Update, General, Ring heater COMSL model update   
|
Tue Feb 27 03:26:28 2024, Michael, Update, Interferometer Simulations, Reverse aLIGO Layout Created in Gtrace 
|
Wed Feb 28 12:02:08 2024, Tyler, Update, General, Resistors for Heater Elements Update
|
Wed Jan 17 15:47:49 2024, Aiden, Update, General, Resistors for Heater Elements
|
Tue Feb 18 11:19:13 2025, Luke , Configuration, VAC, Repositioning of the lid's temperature probe
|
Mon Jul 24 14:55:53 2023, Jon, Update, VAC, Removed extension power cable
|
Tue Oct 29 16:37:35 2024, Tyler, Update, Electronics, Red Pitaya OS Update
|
Tue Apr 25 11:56:37 2023, Jon, Update, VLC Electronics, Red Pataya has arrived
|
Mon May 13 13:03:41 2024, Tyler, Update, FLIR, Readout Code Updates
|
Fri Feb 2 16:56:56 2024, Jon, Update, CDS, RTS model implemented for FROSTI RTD readouts
|
Tue Jan 16 12:20:21 2024, Tyler, Configuration, Electronics, RTD Readout Chassis Update 2 
|
Tue Jan 9 12:08:59 2024, Tyler, Configuration, Electronics, RTD Readout Chassis Update
|
Thu May 2 22:43:36 2024, Tyler, Update, Electronics, RTD Readout Chassis Redesign
|
Fri Dec 29 16:02:27 2023, Jon, Configuration, Electronics, RTD Readout Chassis  
|
Thu Mar 21 16:56:42 2024, Tyler, Update, DAQ, RTD Parameter Calibration 
|
Mon Mar 25 10:55:33 2024, Tyler, Update, DAQ, RTD Parameter Calibration
|
Tue Mar 26 13:51:56 2024, Tyler, Update, DAQ, RTD Parameter Calibration
|
Mon Jul 29 13:39:16 2024, Tyler, Update, DAQ, RTD Parameter Calibration 
|
Mon Nov 20 10:10:50 2023, Tyler, Configuration, Electronics, RTD Logic/Schematic Diagrams 
|
Tue Jan 23 12:17:41 2024, Tyler, Update, Electronics, RTD Chassis
|
Tue Jan 30 11:36:19 2024, Tyler, Update, Electronics, RTD Chassis
|
Mon Nov 13 11:07:50 2023, Tyler, Update, VAC, RTD Analysis 
|
Tue Jan 14 10:27:14 2025, Tyler, Update, TCS, RIN Updates
|
Wed Dec 11 13:39:30 2024, Tyler, Update, Electronics, RIN Update 12/11/2024
|
Wed Oct 9 13:52:31 2024, Tyler, Update, TCS, RIN Update 10/09/2024
|
Wed Nov 13 14:03:32 2024, Tyler, Update, Electronics, RIN Update 
|
Wed Nov 20 12:59:37 2024, Tyler, Update, Electronics, RIN Update
|
Wed Nov 27 13:48:01 2024, Tyler, Update, Electronics, RIN Update
|
Tue Mar 4 10:28:58 2025, Tyler, Update, TCS, RIN Plot Updates 
|
Mon Aug 12 16:24:34 2024, Tyler, Update, Cleanroom, RIN Measurement Update 1 
|
Mon Jul 29 14:30:16 2024, Tyler, Update, Cleanroom, RIN Measurement Set-up
|
Thu Jul 11 15:53:39 2024, Luke, Update, VAC, RGA line upgrade  
|
Fri Aug 23 16:08:32 2024, Luke, Update, VAC, RGA line leak testing
|
Tue Aug 27 15:01:26 2024, Luke, Update, VAC, RGA line leak testing
|
Wed Jul 10 17:31:07 2024, Luke, Update, VAC, RGA line disassembly and upgrade   
|
Fri Nov 10 08:32:34 2023, Jon, Update, VAC, RGA experiments
|
Tue Nov 14 17:21:40 2023, Jon, Update, VAC, RGA best practices
|
Wed Dec 11 16:06:05 2024, Luis, Update, VAC, RGA Status
|
Wed May 10 10:49:34 2023, Aiden, Update, General, RGA Software
|
Mon Sep 16 13:51:23 2024, Luis Martin, Update, VAC, RGA Scans  
|
Wed Sep 25 09:06:09 2024, Luis Martin, Update, VAC, RGA Scans 
|
Thu Dec 12 13:06:39 2024, Luis, Update, VAC, RGA Scan and vacuum system updates 
|
Thu Dec 5 10:31:13 2024, Luis , Update, VAC, RGA Scan and RGA updates
|
Wed Oct 16 13:58:59 2024, Luis Martin, Update, VAC, RGA Scan
|
Wed Oct 23 12:08:36 2024, Luis Martin, Update, VAC, RGA Scan
|
Thu Feb 20 17:07:36 2025, Luis, Update, VAC, RGA Scan
|
Mon Feb 24 17:50:13 2025, Luis, Update, VAC, RGA Scan
|
Wed Nov 6 13:48:55 2024, Liu, Update, Interferometer Simulations, QN modeling update
|
Mon Jul 15 13:30:49 2024, Luke , Update, VAC, Problem with 2.75" to 1.33" zero length reducer
|
|