| [Pamella, Cao]  
  Fuse replacement 
 Replace blown 10A fuse in ucontroller outside cleanroom  Replace 10 A fuse in main power connection slot of the controller unit inside cleanroom  Pamella wiped down unit outside cleanroom.  Controller units turned on and temperature setpoint set to be 80 deg C  Temperature settle in approx. 15 minutes(as recorded by the RTD).  No problems with fuses observed   Recording of pressure gauges (in Torr) :
 Before turning heater on : 
 
 Gauge 1(main chamber): 3.73E-7 Gauge 2(RGA line): 3.65E-7 Gauge 3(Pump line): 3.8E-4 After 15 minutes : 
 
 Gauge 1(main chamber): 7.07E-7 Gauge 2(RGA line): 6.12E-7 Gauge 3(Pump line): 3.8E-4 Reduce setpoint temperature to 60 deg C due to Pinrani gauge (Gauge 3) temperature limit  Upon returned to lab to reduce temperature (35 minutes after turned on):
 
 Gauge 1(main chamber): 1.22E-6 Gauge 2(RGA line): 9.98E-7 Gauge 3(Pump line): 3.8E-4  Once temperature has settled to 60 C (approx 20 mins after changing setpoint), pressure readout showed:
 
 Gauge 1(main chamber): 1.37E-6 Gauge 2(RGA line): 1.10E-6 Gauge 3(Pump line): 3.8E-4  Heater left on for the whole afternoon, pressure readout upon returning to lab at 5:30 pm:
 
 Gauge 1(main chamber): 3.43E-6 Gauge 2(RGA line): 2.61E-6 Gauge 3(Pump line): 3.8E-4 |