ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 5 of 10  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  477   Wed Nov 20 12:59:37 2024 TylerUpdateElectronicsRIN UpdateI went ahead and compared the noise spectrum
of the ADC to those of the photodetectors
with the FROSTI on and off. As discussed
 ASD_plots.pdf 
  422   Mon Aug 12 16:24:34 2024 TylerUpdateCleanroomRIN Measurement Update 1[Tyler]


For some preliminary tests,
I moved the IR photodetectors outside of
the cleanroom and onto the other optical
 Basic_setup.jpgRP.jpg 
  417   Mon Jul 29 14:30:16 2024 TylerUpdateCleanroomRIN Measurement Set-up[Tyler]


I have begun moving parts
into the cleanroom for the upcoming FROSTI
RIN tests that will be conducted within the
 RIN_FROSTI.jpg 
  401   Thu Jul 11 15:53:39 2024 LukeUpdateVACRGA line upgrade [ Luke, Jon ]
Started work at 11:00
As mentioned in my previous post
 image_2024-07-11_154630323.pngimage_2024-07-11_154818191.pngimage_2024-07-11_154902840.png 
  427   Fri Aug 23 16:08:32 2024 LukeUpdateVACRGA line leak testing[Luke, Luis, Jon, Tyler]
On the 22nd Dr. Richardson showed
Luis, Tyler and I how to preform a leak test
  
  429   Tue Aug 27 15:01:26 2024 LukeUpdateVACRGA line leak testing[Luke, Tyler]
On the 27th Tyler and I ran the RGA
leak test again with the electron multiplier
  
  400   Wed Jul 10 17:31:07 2024 LukeUpdateVACRGA line disassembly and upgrade [ Luke, Cynthia, Michael, Xuesi, Anthony
]
Started work around 12:45
 image_2024-07-10_172112210.pngimage_2024-07-10_172431863.pngimage_2024-07-10_172603090.pngimage_2024-07-10_172823966.png 
  261   Fri Nov 10 08:32:34 2023 JonUpdateVACRGA experimentsI ran a 3-minute
degas cycle of the RGA filament for the first
time yesterday (in this process, the filament
  
  266   Tue Nov 14 17:21:40 2023 JonUpdateVACRGA best practicesAs a follow up ELOG 261,
I have received advice from one of the vacuum
experts at LIGO Hanford on best practices
  
  96   Wed May 10 10:49:34 2023 AidenUpdateGeneralRGA Software[Aiden, Cao]

Went over how to use the RGA
software, how to change the graph units,
scaling and mass detection. Also went over
  
  440   Mon Sep 16 13:51:23 2024 Luis MartinUpdateVACRGA Scans



   
    


 2024-09-11_PostBake1_ArO.png2024-09-13_PostBake1_ArO.png2024-09-16_PostBake1_ArO.png 
  448   Wed Sep 25 09:06:09 2024 Luis MartinUpdateVACRGA Scans



   
    
 24overlay.png24overlayNormalized.png 
  459   Wed Oct 16 13:58:59 2024 Luis MartinUpdateVACRGA ScanThe following figure displays data acquired
on 10/09, and it shows that we are no longer
below the cleanliness standard. Also, the
 2024-10-09_PostBake1_ArO.png 
  463   Wed Oct 23 12:08:36 2024 Luis MartinUpdateVACRGA Scan[Luke, Luis, Mary, Ma]
 On 10/22/24 Luke, Ma, Mary and myself
ran a RGA scan, the results are displayed
 2024-10-22_PostBake1_ArO.png 
  469   Wed Nov 6 13:48:55 2024 LiuUpdateInterferometer SimulationsQN modeling updateSlides   
  405   Mon Jul 15 13:30:49 2024 Luke UpdateVACProblem with 2.75" to 1.33" zero length reducer Last Friday while checking the depth of the
ZLR I got one of the screws stuck. Today
I tried a couple things to get it out. First
 IMG_1882.jpg 
  255   Mon Nov 6 11:29:24 2023 TylerUpdateElectronicsPreliminary RTD Calculations, RP Software Update
Preliminary RTD calculations are shown
below, given an input of 10 V and desiring
a few mA of current. It looks like R_ref
 cvt.pngVvC.pngIMG_7471.jpg 
  185   Tue Aug 1 12:48:41 2023 AidenUpdateCleanroomPre Filter Change
Changed the pre filter inside of the
3 stage HEPA system next to the soldering
station. It was rather dirty and I have attached
 IMG_4564.jpgIMG_4563.jpgIMG_4562.jpg 
  137   Wed Jun 28 15:58:56 2023 Shane, CaoInfrastructureVACPower trip problem remains, source of smoke is insulation[Shane, Cao] 


With the new change
in wiring configuration described in elog
136,
 Pumpline_afterRemoveInsul.jpgRGAline_afterRemoeInsul.jpgMeltedInsulation1.jpgMeltedInsulation1.jpgMeltedInsulation2.jpg 
  330   Tue Feb 20 08:01:30 2024 JonInfrastructureGeneralPower and network equipment installed in 1129 rack[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On
Thursday we installed the power conditioning/distribution
equipment and networking equipment in the
 IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg 
  165   Tue Jul 18 16:35:06 2023 PamellaUpdateFLIRPlot-Data with the new configuration without the mask and reflector.[Pamella]

I was able to plot the
first graph for a result between the six
different positions on the screen, for now
 Gauss.plot.jpeg 
  431   Thu Aug 29 16:39:34 2024 LukeUpdateVACPhotos of heater tape   6x 
  94   Tue May 9 15:49:20 2023 JonInfrastructureVACPermanent cable routingToday I brought in a fresh supply of zip
ties (we now have 1500 in the tool chest)
and used them to permanentize the cable routing
  
  12   Mon Nov 28 18:10:23 2022 shaneUpdateELOGParticle counts in the clean roomParticle count stats for the clean room Nov
28, 2022: 
Took 10 sample runs in each of
5 regions in the clean room (5 runs per region
 clean_room_particle_counts_11_28_-_Sheet1.pdf 
  64   Tue Apr 4 16:52:08 2023 JonUpdateCleanroomParticle counter docking stationDue to the problems we have encountered trying
to serially communicate directly with the
Met One DR-528 particle counter, I went ahead
 Met_One_Dock.png 
  71   Wed Apr 12 16:17:50 2023 shaneUpdateGeneralParticle Counter movedWith the added height of the new docking station,
the particle counter no longer fits under
the Windows monitor in the electronics rack
 IMG_6693.HEIC 
  235   Mon Oct 9 11:29:37 2023 TylerUpdateElectronicsPSD/CSD Plot UpdatesContinuing from Sophia's SURF Project this
summer: Plotting the Power-Spectral Densities
(PSDs) and Cross-Spectral Densities of two
 Screenshot_2023-10-09_at_11.20.25_AM.pngwelch_csd-2.png 
  39   Wed Mar 1 21:27:20 2023 JonInfrastructureCleanroomOver-table shelf height raisedJon, Cao

Today we raised the height of the
shelf overhanging the cleanroom laser table
 cleanroom-shelf.jpg 
  16   Mon Jan 23 17:26:15 2023 Peter CarneyUpdateGeneralOven cleaningAiden and Cao 
Turned on the oven to 120
deg C for 12 hours. After 12 hours, put it
at 200 deg C for 48 hours. 
  
  17   Thu Jan 26 18:58:25 2023 AidenUpdateGeneralOven HeatingAiden cleaned the oven with methanol again
and set the oven to 260 degC for 12 hours.
  
  338   Fri Feb 23 18:03:27 2024 TylerUpdateFLIROptical Test Setup in Cleanroom[Tyler, Xuesi]

The FLIR and test mass
stand-in have been transferred into the cleanroom.
A software test will be run as soon as we
 IMG_0941.png 
  9   Tue Jul 26 14:10:35 2022 CassidyUpdateCamerasOptical Post Replacement and RealignmentToday I replaced the 3" optical post that
the camera rests on with a 2" optical post
in order for the screen to correctly fill
 YAxisAlignment.pngXRotZAlignment.pngNewOpticalPost.png 
  424   Mon Aug 12 17:09:04 2024 Cynthia UpdateInterferometer SimulationsO4 vs O5 cavity scans with ITM plume guess or ETMSo far the proposed solution for what to use
for O5 ITM mirror for SIS simulations is
either the plume guess file or using the
 O5_plots_and_tables.pdfO4_plots_and_tables.pdfETM12mapO5.pngScreenshot_2024-08-12_at_5.05.31_PM.png 
  392   Mon Jul 1 15:19:42 2024 Cynthia UpdateInterferometer SimulationsO4 and O5 mirror cavity scans with thermal effect   cavityScan_07_01.pdf 
  67   Tue Apr 11 13:15:40 2023 CaoInfrastructureClean & BakeNitrogen gas tank replacedThe nitrogen gas tank has been replaced with
a new unit. The new tank is ultra pure nitrogen
(>99.9% nitrogen).

The new tank has been
  
  26   Fri Feb 10 16:34:45 2023 Huy Tuong CaoInfrastructureClean & BakeNitrogen gas tank ready to useCao,


Today I fixed the final bit related
to the nitrogen gas tank, which is to apply
sealing tape to M-NPT connector of the hose
 AirGunSealed.jpg 
  412   Fri Jul 26 17:25:42 2024 JonInfrastructureComputersNew workstation ws4 installed in 1129Today I installed the second desktop workstation
in 1129. The new machine is an Intel NUC13ANHi5,
with a 12-Core Intel i5-1340P CPU, 32GB DDR4
 ws4.jpg 
  379   Thu Jun 20 18:01:11 2024 JonInfrastructureComputersNew workstation ws3 in 1129I have repurposed a spare Intel NUC to serve
as the first of two planned workstations
in 1129. Today I set it up with a fresh installation
  
  385   Wed Jun 26 15:33:41 2024 JonInfrastructureComputersNew workstation ws3 in 1129
Set-up of the first CDS workstation for
1129, ws3, is complete and the machine is
ready for use. The login credentials are
 IMG_1368.jpg 
  198   Wed Aug 9 11:32:56 2023 JonInfrastructureGeneralNew power cablesI delivered new NEMA 5-15 (120V / 15 A)
power cables to the lab for the following
items:
 IMG_0299.jpg 
  135   Tue Jun 27 15:18:26 2023 PamellaUpdateFLIRNew data collection  
[Pamella]



  Yesterday,
I did a new data collection.  I could get
a better data in this time and I realized
 FLIR_data.002.jpegFLIR_data_2.002.jpeg 
  123   Tue Jun 13 21:33:46 2023 PamellaUpdateGeneralNew cabinet for PPI[Pamella and Dr.Richardson]

Dr. Richardson
installed the new cabinet outside the room
for the PPI equipments, and then I wiped
  
  157   Fri Jul 14 16:49:42 2023 PamellaUpdateFLIRNew bridge and calibration data[Pamella]


Aiden 3D printed a new
bridge for the heater and I installed the
new bridge yesterday. 
 I started
 IMG_8606.jpeg 
  367   Mon May 13 14:48:27 2024 AidenUpdateVACNew Vacuum Chamber DesignI created a new model for the vacuum chamber
based on the ideas from last week's meeting.

It
should be noted that we can not have the
 VaccumChamberAssembly__Redesign_v5.jpg 
  398   Mon Jul 8 17:01:45 2024 ShaneUpdateCDSNew CyMAC internal layout[Jon, Shane]

Internal layout of CyMAC has
been updated (labeled image attached) to
accommodate the replacement of the two ribbon
 updated_cymac.jpeg 
  108   Tue May 30 14:51:27 2023 PamellaUpdateFLIRNew 3D mask - Bigger triangles shapes.[Pamella]

 Change the 3D mask 

Started removing the old mask in the reflector.

Started cutting the new aluminum lid for
 AcquisitionImage(May-30-2023_14_38).jpgthumbnail_IMG-7303.jpg 
  172   Tue Jul 25 15:35:14 2023 ShaneUpdateElectronicsMore chassis movedFinished basic assembly of binary input and
output chassis today, and moved one to top
shelf of work bench. The other is in corner
 IMG_8409.HEIC 
  91   Wed May 3 19:03:47 2023 Julian,Pamella and CaoPhysicsVACModify vacuum asssembly and install RGA[Pamella, Julian, Cao]

   Today we
started re-configuring the vacuum chamber
components. 

 Particle count
 vaccum_chamber_re-configuration.jpg 
  111   Wed May 31 16:18:41 2023 AidenSummaryGeneralMock FROSTIFinished assembly on the Mock FROSTI so it
is ready for the fit test at LIGO lab.
 IMG_4394.jpg 
  397   Mon Jul 8 12:26:10 2024 MichaelUpdateInterferometer SimulationsMinimizing Astigmatic Effects in the SRC of LIGOThis is the first look and analysis of the
effects of astigmatism in the aLIGO optical
layout which can lead to mode mismatch and
  
ELOG V3.1.3-7933898