ligo-ex
ligo-ds
|
Richardson Lab Experimental Log, Page 1 of 10 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Thu Apr 3 13:23:37 2025, shane, Update, CDS, UPS interfacing
|
Tue Apr 1 11:47:08 2025, Liu, Update, ,
|
Mon Mar 31 15:41:56 2025, Xuesi Ma, Update, ,
|
Mon Mar 31 11:26:45 2025, Luke Johnson, Update, Scripts/Programs, Heatmaps of power delivery performance 
|
Tue Mar 25 12:56:47 2025, Tyler, Update, TCS, FROSTI Analysis Finalization 
|
Sun Mar 23 15:39:06 2025, Luke Johnson, Update, Scripts/Programs, Ringheater Location optimization   
|
Tue Mar 11 11:28:52 2025, Cynthia, Update, Interferometer Simulations, flattening mirror to study power discrepency
|
Tue Mar 11 10:43:57 2025, Xuesi Ma, Update, ,
|
Mon Mar 10 21:32:29 2025, Nathan, Physics, Electronics, Beam Profiling and PBS Measurements  
|
Mon Mar 10 21:13:12 2025, Nathan, Update, VLC Update, PDH Lock Progress and Next Steps   
|
Mon Mar 10 17:03:52 2025, Shane, Update, CDS, Pressure Gauge successful connect
|
Wed Mar 5 18:13:20 2025, Shane, Update, CDS, vac system comms
|
Wed Mar 5 12:16:28 2025, Shane, Update, CDS, Vac system communications update
|
Tue Mar 4 10:47:03 2025, Shane, Update, CDS, Vac system pinouts 
|
Tue Mar 4 10:28:58 2025, Tyler, Update, TCS, RIN Plot Updates 
|
Tue Mar 4 10:18:43 2025, Cynthia, Update, Interferometer Simulations, attempted to remove curvature and tilt for the coating
|
Tue Mar 4 03:33:18 2025, Xuesi Ma, Update, , Update 6x
|
Tue Mar 4 03:05:42 2025, Xuesi Ma, Update, ELOG, LOG
|
Thu Feb 27 18:22:21 2025, Shane, Update, CDS, Ongoing work in server rack and desk area (1119)
|
Tue Feb 25 10:56:25 2025, Cynthia, Update, Interferometer Simulations, mirror coating added for simulation rerun
|
Tue Feb 25 10:02:32 2025, Xuesi Ma, Update, ,   
|
Tue Feb 25 01:37:00 2025, Michael, Update, Interferometer Simulations, Updates and Current Next Steps for Toroidal Mirrors Project
|
Mon Feb 24 17:50:13 2025, Luis, Update, VAC, RGA Scan
|
Sun Feb 23 16:00:07 2025, Luke , Update, Scripts/Programs, Ringheater modeling Update 
|
Sun Feb 23 12:11:43 2025, Luke , Summary, Cleanroom, Cleanroom cleaning
|
Thu Feb 20 17:07:36 2025, Luis, Update, VAC, RGA Scan
|
Wed Feb 19 13:44:48 2025, Shane, Update, CDS, Vac serial interfacing update
|
Tue Feb 18 11:19:13 2025, Luke , Configuration, VAC, Repositioning of the lid's temperature probe
|
Tue Feb 18 10:12:39 2025, Tyler, Update, TCS, Final RIN Plot Update   
|
Tue Feb 18 10:02:16 2025, Xuesi Ma, Update, , Group Meeting Slides 2/18/2025
|
Tue Feb 18 10:01:07 2025, Xuesi Ma, Update, ,  
|
Sun Feb 16 16:45:18 2025, Luke , Update, General, Ringheater position optimization   
|
Fri Feb 14 12:15:23 2025, Luis, Update, VAC, Vacuum sytem staus 
|
Fri Feb 14 11:57:50 2025, Luis, Update, VAC, Vacuum Update
|
Tue Feb 11 08:07:02 2025, Luis, Update, VAC, Bake stopped
|
Fri Feb 7 12:25:56 2025, Luke , Summary, VAC, Started bake
|
Mon Feb 3 13:17:21 2025, Xuesi Ma, Update, , 
|
Sat Feb 1 17:25:52 2025, Luke , Summary, General, Cleanroom cleaning
|
Fri Jan 31 15:03:09 2025, Xuesi Ma, Update, , Heater Element Circuit Check
|
Tue Jan 28 13:30:46 2025, shane, Update, CDS, Serial comms testing update
|
Mon Jan 27 23:35:28 2025, Xuesi Ma, Update, ,  
|
Mon Jan 27 11:29:38 2025, Xuesi Ma, Update, , Heater Element Test 
|
Sat Jan 25 18:19:39 2025, Luke , Update, General, Ringheater modeling Update
|
Wed Jan 22 10:50:08 2025, Tyler, Update, TCS, FROSTI Disassembly   
|
Tue Jan 21 10:12:02 2025, Luke , Summary, General, Frosti toy model
|
Fri Jan 17 13:27:07 2025, Tyler, Update, TCS, FROSTI Pre-disassembly 
|
Tue Jan 14 10:27:14 2025, Tyler, Update, TCS, RIN Updates
|
Wed Jan 8 17:35:57 2025, Luke , Summary, Cleanroom, Cleanroom cleaning
|
Thu Jan 2 17:52:58 2025, Luis, Update, VAC, MR Testing Continuation  
|
Mon Dec 23 14:33:36 2024, Tyler, Update, TCS, Latest RIN Measurement Results   
|
|