|
ligo-ex
ligo-ds
|
| Richardson Lab Experimental Log, Page 13 of 15 |
Not logged in |
 |
|
| New entries since: | Wed Dec 31 16:00:00 1969 | |
Tue Jun 13 13:25:05 2023, Aiden, Summary, Clean & Bake, Clean and Bake Batch 13
|
Mon Apr 24 17:38:45 2023, Aiden, Summary, General, Clean and Bake Batch 12 
|
Tue Feb 7 17:27:30 2023, Aiden, Physics, ELOG, Clean and Bake Batch #1
|
Wed Mar 27 00:03:57 2024, Pooyan, Update, Computers, Chimay relocation to Physics 1129 
|
Mon Sep 9 14:27:36 2024, Pooyan, Infrastructure, Computers, Chimay backup attempt
|
Mon Jul 24 16:19:29 2023, Shane, Jon, Update, Electronics, Chassis semi-assembled and moved
|
Tue May 9 20:55:12 2023, Jon, Infrastructure, VAC, Calibrated Ar leak rate
|
Sun Mar 24 11:50:37 2024, Aiden, Update, Clean & Bake, Cal Tech FROSTI Parts
|
Tue Feb 13 13:02:41 2024, Pooyan, Update, Interferometer Simulations, Cacity sacn of Fabry-Perot
|
Thu Jul 11 21:01:37 2024, Jon, Infrastructure, General, Cable tray installed in 1129 
|
Tue Jul 30 07:42:47 2024, Jon, Infrastructure, General, Cable tray installed in 1119
|
Mon Mar 6 15:32:58 2023, Jon, Infrastructure, General, Cabinet installation completed 
|
Mon Jan 15 22:29:34 2024, Jon, Infrastructure, General, Cabinet installation & lab clean-up completed 
|
Fri Jun 14 13:32:13 2024, Liu, Update, Scripts/Programs, COMSOL simulation on rectangular heater elements design 6x
|
Fri Jun 21 11:47:30 2024, Liu, Update, Scripts/Programs, COMSOL simulation on alternative straightened heater elements design 6x
|
Mon Jun 10 14:52:38 2024, Tyler, Update, FLIR, CIT FROSTI Analysis Update
|
Thu Jan 29 12:46:22 2026, Cece Ochoa, Update, , CE Cavity Design Update (4)
|
Tue Jun 3 11:54:06 2025, Cece Ochoa, Update, , CE Cavity Design Update
|
Thu Nov 6 12:39:43 2025, Cece Ochoa, Update, ELOG, CE Cavity Design Update 
|
Thu Nov 20 13:03:58 2025, Cece Ochoa, Update, ELOG, CE Cavity Design Update
|
Thu Feb 12 12:53:51 2026, Cece Ochoa, Update, ELOG, CE Cavity Design Update
|
Thu Mar 12 13:18:49 2026, Cece Ochoa, Update, Interferometer Simulations, CE Cavity Design Update
|
Thu Apr 23 11:32:48 2026, Cece Ochoa, Update, Interferometer Simulations, CE Cavity Design Update
|
Fri Jul 5 14:12:32 2024, Liu, Update, Interferometer Simulations, CE BS Mechanical Resonances 
|
Tue Jun 3 11:50:08 2025, Pooyan, Update, CDS, CDS update
|
Tue Jun 10 12:11:14 2025, Pooyan, Update, CDS, CDS update
|
Wed Jun 11 16:19:37 2025, Pooyan, Update, CDS, CDS update 
|
Tue Feb 13 01:26:30 2024, Peter, Update, Interferometer Simulations, CARM Power Simulations 
|
Wed Aug 9 17:35:26 2023, Shane, Update, CDS, Binary output chassis finished 
|
Wed Aug 16 17:17:02 2023, Shane, Jon, Update, CDS, Binary input chassis powering correctly
|
Tue Aug 8 17:03:22 2023, Shane, Jon, Update, CDS, Binary input chassis finished
|
Thu Apr 16 14:04:46 2026, Mary, Update, Interferometer Simulations, Beam position optimization algorithm
|
Thu Jun 18 12:36:46 2026, Mary, Update, , Beam position optimization algorithm
|
Thu Jun 25 11:42:29 2026, Mary, Update, TCS, Beam position optimization algorithm
|
Mon Mar 10 21:32:29 2025, Nathan, Physics, Electronics, Beam Profiling and PBS Measurements  
|
Thu Apr 27 09:48:34 2023, Aiden, Summary, General, Batch 12 Bagging 
|
Tue Feb 11 08:07:02 2025, Luis, Update, VAC, Bake stopped
|
Fri Feb 16 18:37:28 2024, Jon, Update, VAC, Bake ended 6:23 pm
|
Fri Feb 10 15:15:30 2023, Aiden, Update, General, Bagging First Batch
|
Tue Feb 13 12:26:23 2024, Tyler, Update, Interferometer Simulations, BS Code Update 
|
Mon Jul 8 10:39:14 2024, Xuejun, Update, FLIR, Average Temperature Profile
|
Thu Aug 3 18:03:42 2023, Shane, Jon, Update, CDS, Anti-Aliasing chassis complete
|
Thu Jul 13 15:31:21 2023, Jon, Update, General, Ant traps placed around lab
|
Thu Jul 13 16:59:03 2023, Jon, Update, General, Ant traps placed around lab
|
Tue Jun 24 13:47:58 2025, Liu, Update, Interferometer Simulations, Alternative FROSTI A# optimization approach
|
Tue Apr 4 16:43:53 2023, Jon, Update, VLC Electronics, Additional Thorlabs PDA10A2
|
Wed Dec 14 18:34:33 2022, Jon, Configuration, Electronics, Adapter for 532 nm laser power supply
|
Mon Jul 3 16:26:21 2023, Cao, Infrastructure, DAQ, Access and control Red Pitaya remotely and run it on local machine
|
Tue Jul 9 18:19:50 2024, Shane, Update, CDS, ADC-DAC loopback testing and IOLAN installation  
|
Tue Jul 16 18:43:07 2024, Shane, Update, CDS, ADC-DAC loopback testing and IOLAN installation
|
|