  675   Thu Jan 29 12:46:22 2026 Cece OchoaUpdate CE Cavity Design Update (4)Update for CE Cavity Arms + Modes 


https://docs.google.com/presentation/d/1-dXYylkAbNpHR4WVCx9Q8ryL_xGlH-JSSLXEUQg6b7Q/edit?usp=sharing
 
  
  586   Tue Jun 3 11:54:06 2025 Cece OchoaUpdate CE Cavity Design UpdateUpdate on the design for the CE Cavity Mirrors  CE_Arm_Cavity_.pdf 
  659   Thu Nov 6 12:39:43 2025 Cece OchoaUpdateELOGCE Cavity Design UpdateUpdated mode placements and ROC. No thermal
effects added yet.
 base_0_6_plot.pdfbase_0_7_plot.pdf 
  663   Thu Nov 20 13:03:58 2025 Cece OchoaUpdateELOGCE Cavity Design UpdateUpdate on grouping 0+8th Order Modes  11_20_update.pdf 
  683   Thu Feb 12 12:53:51 2026 Cece OchoaUpdateELOGCE Cavity Design UpdateUpdate on HOM placement w/ cavity locking.
Still verifying mode placement

RoC: 28340m
and 26874m
 2_12_short_update.pdf 
  Draft   Thu Mar 12 13:18:49 2026 Cece OchoaUpdateInterferometer SimulationsCE Cavity Design UpdateAnimation showing how modes shift in the CE
arm cavity for radius 27581m and mirror radius
of40cm as the laser powers up the 1.5 MW.
  
  702   Thu Apr 23 11:32:48 2026 Cece OchoaUpdateInterferometer SimulationsCE Cavity Design UpdateUpdate on CE Mirror RoC, simulation with FROSTI
and cavity locking

View Presentation
  
  394   Fri Jul 5 14:12:32 2024 LiuUpdateInterferometer SimulationsCE BS Mechanical ResonancesThe butterfly and drumhead mechanical modes
for the aLIGO BS were calculated in COMSOL.
The resonant frequencies for the two acoustic
 butterfly.pngdrumhead.png 
  585   Tue Jun 3 11:50:08 2025 PooyanUpdateCDSCDS updateThere are three major issues with the lab's
CDS system that should be addressed. They
are ordered from the highest priority to
  
  590   Tue Jun 10 12:11:14 2025 PooyanUpdateCDSCDS update
The MEDM models issue was fixed.
The issue was that building the c1msc model
alone was not enough and we had to re-build
  
  592   Wed Jun 11 16:19:37 2025 PooyanUpdateCDSCDS update
Fast channels recorded to .gwf frame
files

Had to add a DAQ Channels
block to the c1msc model for those channel
 Screenshot_20250611_154834.pngf3k.pdf 
  321   Tue Feb 13 01:26:30 2024 PeterUpdateInterferometer SimulationsCARM Power SimulationsCao's simulations of the circulating power
and gouy phase through a single arm cavity
of the interferometer have been reproduced.
 Scenario_3_CARM.pdfScenario_3_CARM_Gouy.pdf 
  199   Wed Aug 9 17:35:26 2023 ShaneUpdateCDSBinary output chassis finishedFinished the internal wiring for the binary
output chassis today, which completes its
assembly. Also secured ribbon cables and
 IMG_8685.jpegIMG_8686.jpeg 
  211   Wed Aug 16 17:17:02 2023 Shane, JonUpdateCDSBinary input chassis powering correctly Binary input chassis passed power-on test,
and is lighting up as expected. Binary output
chassis also successfully powered on. AA
 IMG_9253.jpeg 
  197   Tue Aug 8 17:03:22 2023 Shane, JonUpdateCDSBinary input chassis finishedFinished assembly of the binary input chassis
today, including DC on/off switch and LED
installation. external cable assemblies still
 IMG_8681.jpeg 
  700   Thu Apr 16 14:04:46 2026 MaryUpdateInterferometer SimulationsBeam position optimization algorithm   beam_position_optimization.pdf 
  719   Thu Jun 18 12:36:46 2026 MaryUpdate Beam position optimization algorithmSlides   
  720   Thu Jun 25 11:42:29 2026 MaryUpdateTCSBeam position optimization algorithm
Weight Calibration:
this study looks at how the thermal-compensation
  
  537   Mon Mar 10 21:32:29 2025 NathanPhysicsElectronicsBeam Profiling and PBS MeasurementsBeam wasn't diverging, however maybe was about
to diverge when measurements stopped? Will
discuss the PBS measurements and how the
 Beam_Profiling_2_20_(2).pdfbeamprfl.pngthumbnail_(6).jfif 
  80   Thu Apr 27 09:48:34 2023 AidenSummaryGeneralBatch 12 BaggingI took batch 12 out of the oven and put them
in a bag and placed the bag inside the clean
room in the first large stainless steel container.

I
 IMG_4279.jpgIMG_4278.jpg 
  510   Tue Feb 11 08:07:02 2025 LuisUpdateVACBake stopped [Luis, Ma]
        Feb/10/25 4:00pm

        Bake was stopped.
  
  327   Fri Feb 16 18:37:28 2024 JonUpdateVACBake ended 6:23 pmI ended the bake of the UHV system (that
began on Monday) at 6:23 pm today by switching
OFF both PID controllers. The heaters elements
  
  25   Fri Feb 10 15:15:30 2023 AidenUpdateGeneralBagging First BatchAiden Bagged and Tagged the first batch of
stainless steel parts shown on the google
spread sheet. 
1. Removed two parts from
  
  324   Tue Feb 13 12:26:23 2024 TylerUpdateInterferometer SimulationsBS Code Update I reproduced Cao's CE beamsplitter code
(see below for example plots). I received
the current info on the beamsplitter parameters
 thickness1.pdfbs_opd_homloss_h6cm_w2cm.pdf 
  396   Mon Jul 8 10:39:14 2024 XuejunUpdateFLIRAverage Temperature Profile After taking data for each of the individual
heater elements, I imported them into python
and overlayed them to produce an average
 Average-Temperature-Profile.pdf 
  191   Thu Aug 3 18:03:42 2023 Shane, JonUpdateCDSAnti-Aliasing chassis completeWe finished installing the internal power
supply cables in the anti-aliasing chassis
today, which concludes its assembly. Work
 IMG_8544.jpeg 
  154   Thu Jul 13 15:31:21 2023 JonUpdateGeneralAnt traps placed around labIn response to reports that ants have been
observed in the lab, I placed five ant bait
traps around the room today. Each is sitting
  
  155   Thu Jul 13 16:59:03 2023 JonUpdateGeneralAnt traps placed around labUpdate: After seeing the
strong response to the first set, I redistributed
them to the hottest spots and added one more
  
  598   Tue Jun 24 13:47:58 2025 LiuUpdateInterferometer SimulationsAlternative FROSTI A# optimization approachAlternative FROSTI A# optimization approach  Update.pdf 
  63   Tue Apr 4 16:43:53 2023 JonUpdateVLC ElectronicsAdditional Thorlabs PDA10A2I ordered a second PDA10A2 and mounting post
+ spacer (which puts the aperture at the
VLC's standard 3" beam height). These arrived
 PDA10A2.png 
  14   Wed Dec 14 18:34:33 2022 JonConfigurationElectronicsAdapter for 532 nm laser power supplyI installed an EU-to-US plug adapter for the
532nm laser's 9V power supply. I then re-measured
the laser's power with the correct supply
 laser_power.png 
  142   Mon Jul 3 16:26:21 2023 CaoInfrastructureDAQAccess and control Red Pitaya remotely and run it on local machine[Cao]


To access and control the Red
Pitaya using Python locally on a machine
within the local network, one should follow
  
  399   Tue Jul 9 18:19:50 2024 ShaneUpdateCDSADC-DAC loopback testing and IOLAN installation[Shane, Jon]

Finished ADC-DAC loopback
testing today (see attached xlsx file or
access directly here).
 iolanServerTerminal.jpegADC-DAC_Loopback_Testing.xlsxupdatedc1msc.jpeg 
  410   Tue Jul 16 18:43:07 2024 ShaneUpdateCDSADC-DAC loopback testing and IOLAN installation
UPDATE: 
Follow up ADC-DAC loopback testing
now complete, matching all the ADC channels
to a single DAC channel, and then matching
 Follow-up_ADC-DAC_Loopback_Testing.xlsx 
  285   Mon Dec 4 21:27:53 2023 ShaneUpdateCDSADC-DAC loopback test resultsHere are the test results from today's ADC-DAC
loopback tests. Channels 14 and 15 were the
only ones behaving abnormally. Not sure what
 adc-dac_loopback_testing_results.pdf 
  176   Thu Jul 27 14:46:55 2023 Shane, JonUpdateElectronicsAA chassis DC on/off switch assembledMade the first DC on/off switch assembly today
and installed in anti-aliasing chassis. Second
switch assembly to be completed later.
  
  247   Fri Oct 27 15:28:30 2023 ShaneUpdateCDSAA and AI chassis for CyMAC powered on and functionalCyMAC updates: Switched out the faulty power
regulator boards in the Anti-Aliasing and
Anti-Imaging chassis. Both chassis are now
 AI_chassis_lights_on.jpegAA_chassis_lights_on.jpeg 
  696   Thu Apr 9 12:40:24 2026 Xuesi MaUpdateTCSA# Ring Heater Design
Slides
discussing for A# Ring Heater design.
  
  577   Tue May 13 12:41:06 2025 TylerUpdateTCSA# Profiles UpdateSlides on the A# ITM FROSTI profile modeling
efforts can be found here.
  
  694   Wed Apr 1 15:02:30 2026 TylerUpdateTCSA# FROSTI Profiles Optimization 04/02/2026
Slides
discussing SURF, OPD, and SURF+OPD optimizations
for idealized FROSTI A# profiles.


  
  699   Thu Apr 16 13:14:42 2026 TylerUpdateTCSA# FROSTI Profiles Optimization 04/02/2026

Slides
discussing including overlapped irradiance
profiles at the center of an A# ITM.


  
  690   Thu Mar 5 13:01:14 2026 TylerUpdateTCSA# FROSTI Profiles Optimization
Slides
discussing updates on FROSTI A# profile optimizations.
In particular, a new RMS function is defined
  
  668   Thu Jan 15 12:52:58 2026 TylerUpdateTCSA# FROSTI Profiles 01/15/26Slides   
  674   Wed Jan 28 11:29:30 2026 TylerUpdateTCSA# FROSTI Profiles 01/15/26



  
  678   Thu Feb 5 13:12:28 2026 TylerUpdateTCSA# FROSTI Profiles 01/15/26 Slides
updating progress on FROSTI A# irradiance
profiles and reflector design. Edge roll-off
  
  687   Thu Feb 19 12:59:47 2026 TylerUpdateTCSA# FROSTI Profiles 01/15/26
Slides
covering a new approach to optimizing for
A# FROSTI profiles. In particular, we start
  
  602   Tue Jul 1 12:39:42 2025 TylerUpdateTCSA# FROSTI Profile Optimization Update[Tyler, Liu]

 Slides
  
  632   Tue Aug 19 12:33:59 2025 PooyanUpdateTCSA# BS Update   A#_beamsplitter_thermal_lensing.pdf 
  209   Tue Aug 15 16:10:06 2023 CelesteUpdateTCS8/15/2023 Simulation Progress   Simulation_Progress__1_32nd_Model_(2).pdf 
  204   Fri Aug 11 10:57:20 2023 CelesteUpdateTCS8/11/23 Simulation Progress   Simulation_Progress__1_32nd_Model_(1).pdf 