ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 13 of 14  Not logged in ELOG logo
Entry  Wed Aug 16 17:17:02 2023, Shane, Jon, Update, CDS, Binary input chassis powering correctly  IMG_9253.jpeg
Binary input chassis passed power-on test, and is lighting up as expected. Binary output chassis also successfully powered on. AA and AI chassis not powering
on correctly, need to do some debugging to find the problem. 
Entry  Tue Aug 8 17:03:22 2023, Shane, Jon, Update, CDS, Binary input chassis finished IMG_8681.jpeg
Finished assembly of the binary input chassis today, including DC on/off switch and LED installation. external cable assemblies still needed, but internal
work done. 
Entry  Thu Apr 16 14:04:46 2026, Mary, Update, Interferometer Simulations, Beam position optimization algorithm beam_position_optimization.pdf
 
Entry  Mon Mar 10 21:32:29 2025, Nathan, Physics, Electronics, Beam Profiling and PBS Measurements Beam_Profiling_2_20_(2).pdfbeamprfl.pngthumbnail_(6).jfif
Beam wasn't diverging, however maybe was about to diverge when measurements stopped? Will discuss the PBS measurements and how the voltage changed due to
the wave plate.
Entry  Thu Apr 27 09:48:34 2023, Aiden, Summary, General, Batch 12 Bagging IMG_4279.jpgIMG_4278.jpg
I took batch 12 out of the oven and put them in a bag and placed the bag inside the clean room in the first large stainless steel container.

I also looked
at the small gauge that we felt like needed to be baked and I can confirm that without further cleaning around the inside of the gauge it should not be
connected to the main vacuum. I have attached a photo of the inside of the gauge.
Entry  Tue Feb 11 08:07:02 2025, Luis, Update, VAC, Bake stopped  
[Luis, Ma]
        Feb/10/25 4:00pm

        Bake was stopped.
Entry  Fri Feb 16 18:37:28 2024, Jon, Update, VAC, Bake ended 6:23 pm 
I ended the bake of the UHV system (that began on Monday) at 6:23 pm today by switching OFF both PID controllers. The heaters elements were run at max
power (24 V DC / 200 mA per element) during this bake, and I left them powered at the same level.
At the time, the instrument readings were as follows:
Entry  Fri Feb 10 15:15:30 2023, Aiden, Update, General, Bagging First Batch 
Aiden Bagged and Tagged the first batch of stainless steel parts shown on the google spread sheet. 
1. Removed two parts from the oven.
2. Place them
in the ESD bag.
3. Seal bag with Kapton Tape.
4. Create label including part name and number underneath it.
5. Put label onto the side of the bag where
it is not sealed with tape.
6. Placed bagged items into clean room on work table.

ps. total bags in first batch = 4
Entry  Tue Feb 13 12:26:23 2024, Tyler, Update, Interferometer Simulations, BS Code Update thickness1.pdfbs_opd_homloss_h6cm_w2cm.pdf
 I reproduced Cao's CE beamsplitter code (see below for example plots). I received the current info on the beamsplitter parameters for A+ and A# from
GariLynn also. The next steps are to perform a similar power loss analysis on the anticipated A# beamsplitter.
Entry  Mon Jul 8 10:39:14 2024, Xuejun, Update, FLIR, Average Temperature Profile Average-Temperature-Profile.pdf
 After taking data for each of the individual heater elements, I imported them into python and overlayed them to produce an average temperature profile.
I rotated the 7 of the elements to align with element 1's profile and averaged them out. By setting the range to 28C - 33C (this gave the best visibility
of the heating pattern) it gave the profile attached.
Entry  Thu Aug 3 18:03:42 2023, Shane, Jon, Update, CDS, Anti-Aliasing chassis complete IMG_8544.jpeg
We finished installing the internal power supply cables in the anti-aliasing chassis today, which concludes its assembly. Work on AI, BI, BO chassis still
underway. 
Entry  Thu Jul 13 15:31:21 2023, Jon, Update, General, Ant traps placed around lab 
In response to reports that ants have been observed in the lab, I placed five ant bait traps around the room today. Each is sitting on the floor on top
of a piece of aluminum foil, in areas unlikely to be inadvertently stepped on. They contain liquid which will spill
out if picked up, so please take care not to disturb them.
    Reply  Thu Jul 13 16:59:03 2023, Jon, Update, General, Ant traps placed around lab 
Update: After seeing the strong response to the first set, I redistributed them to the hottest spots and added one more trap.



Quote:



In response to reports that ants have been observed in the lab,
Entry  Tue Jun 24 13:47:58 2025, Liu, Update, Interferometer Simulations, Alternative FROSTI A# optimization approach Update.pdf
Alternative FROSTI A# optimization approach
Entry  Tue Apr 4 16:43:53 2023, Jon, Update, VLC Electronics, Additional Thorlabs PDA10A2 PDA10A2.png
I ordered a second PDA10A2 and mounting post + spacer (which puts the aperture at the VLC's standard 3" beam height). These arrived today and I delivered
them to the lab. They are sitting on the VLC table near the laser.
Entry  Wed Dec 14 18:34:33 2022, Jon, Configuration, Electronics, Adapter for 532 nm laser power supply laser_power.png
I installed an EU-to-US plug adapter for the 532nm laser's 9V power supply. I then re-measured the laser's power with the correct supply voltage (previously
we had been using a 6V supply). At 9V, the max power is 0.83 W, so the laser is confirmed to be Class 2 as labeled.
Entry  Mon Jul 3 16:26:21 2023, Cao, Infrastructure, DAQ, Access and control Red Pitaya remotely and run it on local machine 
[Cao]


To access and control the Red Pitaya using Python locally on a machine within the local network, one should follow these steps:

 

Start the SCPI server. This is achieved by first log onto the Red Piatay page 
rp-xxxxxx.local/ 
  Go to Development >> SCPI server and turn the server on. (Note : The server is currently running)

Entry  Tue Jul 9 18:19:50 2024, Shane, Update, CDS, ADC-DAC loopback testing and IOLAN installation iolanServerTerminal.jpegADC-DAC_Loopback_Testing.xlsxupdatedc1msc.jpeg
[Shane, Jon]

Finished ADC-DAC loopback testing today (see attached xlsx file or access directly here).
All looks well with the first 8 channels, with the gain hovering just under 2. Also edited c1msc model in simulink to add channels 7-15 (the last 8 channels),
and changed the rate back to 64K. See image 1 for the updated c1msc model. The last 8 channels are also looking good and show no problems, with slightly
    Reply  Tue Jul 16 18:43:07 2024, Shane, Update, CDS, ADC-DAC loopback testing and IOLAN installation Follow-up_ADC-DAC_Loopback_Testing.xlsx

UPDATE: 
Follow up ADC-DAC loopback testing now complete, matching all the ADC channels to a single DAC channel, and then matching all the DAC channels
to a single ADC channel (see attached xlsx file or access directly here).
Also note c1msc model file has been updated to include the second set of 16 ADC channels. The newly added channels also have their own filter modules,
Entry  Mon Dec 4 21:27:53 2023, Shane, Update, CDS, ADC-DAC loopback test results adc-dac_loopback_testing_results.pdf
Here are the test results from today's ADC-DAC loopback tests. Channels 14 and 15 were the only ones behaving abnormally. Not sure what the issue is, but
needs further debugging. The DAC output was as expected for both of them, but the corresponding ADC inputs were the same regardless of what offset was
used (hovering around values of -4 and -5). NOTE: all measurements listed in the attached table are 'averages' in the sense that the ADC inputs and DAC
Entry  Thu Jul 27 14:46:55 2023, Shane, Jon, Update, Electronics, AA chassis DC on/off switch assembled 
Made the first DC on/off switch assembly today and installed in anti-aliasing chassis. Second switch assembly to be completed later.
Entry  Fri Oct 27 15:28:30 2023, Shane, Update, CDS, AA and AI chassis for CyMAC powered on and functional AI_chassis_lights_on.jpegAA_chassis_lights_on.jpeg
CyMAC updates: Switched out the faulty power regulator boards in the Anti-Aliasing and Anti-Imaging chassis. Both chassis are now powering up correctly
with lights on and the correct voltages in/out of the power regulator board. Images attached. All chassis for the CyMAC now functional, so next step is
mounting everything in the rack. 
Entry  Thu Apr 9 12:40:24 2026, Xuesi Ma, Update, TCS, A# Ring Heater Design 

Slides discussing for A# Ring Heater
design.
Entry  Tue May 13 12:41:06 2025, Tyler, Update, TCS, A# Profiles Update 
Slides on the A# ITM FROSTI profile modeling efforts can be found here.
    Reply  Wed Apr 1 15:02:30 2026, Tyler, Update, TCS, A# FROSTI Profiles Optimization 04/02/2026 

Slides discussing SURF, OPD, and SURF+OPD
optimizations for idealized FROSTI A# profiles.





Quote:


    Reply  Thu Apr 16 13:14:42 2026, Tyler, Update, TCS, A# FROSTI Profiles Optimization 04/02/2026 


Slides discussing including overlapped
irradiance profiles at the center of an A# ITM.





Quote:


    Reply  Thu Mar 5 13:01:14 2026, Tyler, Update, TCS, A# FROSTI Profiles Optimization 

Slides
discussing updates on FROSTI A# profile optimizations. In particular, a new RMS function is defined which reduces inner-radii wavefront error variation
to a greater degree.
Entry  Thu Jan 15 12:52:58 2026, Tyler, Update, TCS, A# FROSTI Profiles 01/15/26 
Slides
    Reply  Wed Jan 28 11:29:30 2026, Tyler, Update, TCS, A# FROSTI Profiles 01/15/26 




Quote:

Slides



 
    Reply  Thu Feb 5 13:12:28 2026, Tyler, Update, TCS, A# FROSTI Profiles 01/15/26 
 Slides updating progress on FROSTI
A# irradiance profiles and reflector design. Edge roll-off is now included for thermoelastic deformation corrections. 





Quote:

    Reply  Thu Feb 19 12:59:47 2026, Tyler, Update, TCS, A# FROSTI Profiles 01/15/26 

Slides covering a new approach
to optimizing for A# FROSTI profiles. In particular, we start looking at just optimal RH correction. Once this profile is determined, we then minimize
the residual further with FROSTI profiles. 




Entry  Tue Jul 1 12:39:42 2025, Tyler, Update, TCS, A# FROSTI Profile Optimization Update 
[Tyler, Liu]

 Slides
Entry  Tue Aug 19 12:33:59 2025, Pooyan, Update, TCS, A# BS Update A#_beamsplitter_thermal_lensing.pdf
 
Entry  Tue Aug 15 16:10:06 2023, Celeste, Update, TCS, 8/15/2023 Simulation Progress Simulation_Progress__1_32nd_Model_(2).pdf
 
Entry  Fri Aug 11 10:57:20 2023, Celeste, Update, TCS, 8/11/23 Simulation Progress Simulation_Progress__1_32nd_Model_(1).pdf
 
Entry  Thu Aug 10 14:13:38 2023, Celeste, Update, TCS, 8/10/23, Simulation Graphical Progress Simulation_Progress__8_10_23.pdf
 
Entry  Mon May 1 18:56:57 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement graphs.jpgTime_Series_Trial_1.png
I've configured the two PDA's to the Red Pitaya. I put a 50 ohm resistor connector to each red pitaya input port. This was because the oscilloscope showed
that the voltage reading from the P polarization PDA was almost at 1V, which was the limit of the red pitaya. Once both S and P polarization PDA's were
connected, I opened the red pitaya's oscilloscope. A screenshot of the voltage readings is shared below. Channel 1 (Yellow) is for S polarization. Channel
Entry  Tue May 2 15:55:33 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement IMG-0221.jpgIMG-0222.jpggraphs(1).jpgTime_Series_Trial_2.png
I changed the 1/2 wave plate from the lens mount to the rotational optic mount. This allowed me to rotate the 1/2 wave plate, which changed the respective
polarization power transmitting through S and P polarization. Initially, more power was coupled into the P polarization. Now, with the 1/2 plate rotated,
both channels are experiencing the same voltage reading. Before feeding the PDA signals into the red pitaya, a 50 ohm terminator had to be placed at the
Entry  Thu May 4 14:01:10 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement graphs(3).jpggraphs(2).jpg
I adjusted the rotational mount of the wave plate to see if the power can be 100% coupled into either S or P polarization. The images shown below of the
oscilloscope indicate that this is not possible. The minimum transmitted power we can obtain in either S or P polarization is 75mV. The maximum voltage
we obtain in either S or P polarization is ~ 740mV. This means that at a maximum, we can obtain ~ 90% polarization in either direction, indicating that
Entry  Tue May 16 11:56:33 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement Time_Series_Trial_3.png
With the configuration the exact same as before, I used the Jupyter notebook in the red pitaya's development package to collect data from both input channels.
Last week, I was able to take data, yet only for a very short period of time, and I did not know how to change it. I went online to the red pitaya's user
manual to figure out how to change the sampling period for longer. The link to the page is here:    https://redpitaya.readthedocs.io/en/latest/appsFeatures/examples/acqRF-samp-and-dec.html#s-rate-and-dec
Entry  Thu May 18 14:07:08 2023, Peter, Update, VLC Update, 532nm Intensity Measurement Time_Series_Trial_4.pngTime_Series_Trial_5_2hrs.png
I figured out a method in which to capture power measurements including the initial seconds in which the beam is first turned on. I first clear and restart
the kernel of the python notebook. Then I run the command to connect the red pitaya oscilloscope package to the input data being taken in both channels.
To my understanding, this allows for data acquisition as the code compiles. I then started looping the 1.074s trigger bunches, and then roughly 2 seconds
Entry  Tue Feb 28 19:31:05 2023, Peter, Update, VLC Electronics, 532 M2 Measurements X_width_and_Y_width.png
Took M2 measurements today. Configuration: Lens 1 (f = 50mm) at 0mm. Lens 2 (f = 150mm) at 200mm, camera at 350mm. The laser beam was being moved in -z
direction on track (so further away from the first lens). Quick data shown in the sheets plot. Not a real fit. I was trying to see where the beam waist
was if there even was one. Seems that it is much further than we have room for on the track. Will need to come back and take more data. 

I suggest maybe
Entry  Tue Feb 28 19:33:51 2023, Peter, Update, , 532 M2 Measurements 
Y axis of plot in units of micrometers. X axis in units of millimeters. 
Entry  Thu Mar 9 12:03:59 2023, Peter, Update, VLC Electronics, 532 M2 Measurements OmegaY_M2_Fit_3.pngOmegaX_M2_Fit_3.pngoptical_setup.jpg
Took more M2 Data today. Picture of the optical set up is shown below. lens1 f = 100mm, lens2 f = 50mm, lens3 f = 150mm. There was a nice converging/diverging
beam profile, and the beam waist was able to be read by the camera. I took as much data as I could before clipping loss. The M2 value is quite high. 
Entry  Fri Mar 10 12:08:09 2023, Peter, Update, VLC Electronics, 532 M2 Measurements OmegaX_M2_Fit_4.pngOmegaY_M2_Fit_4.png
Took more M2 laser data today. The configuration is the same as before except now the beam camera is the only component moving. Pictures can be seen below.
The beam shape in x and y is very consistent with low error. However, the M2 value is still a bit high.
Entry  Tue Apr 4 09:39:58 2023, Peter, Update, VLC Electronics, 532 M2 Measurements OmegaY_M2_Fit_8.pdfOmegaX_M2_Fit_8.pdfM2_Measurements_Set_Up.svgBeam_Data_8_3lens.txt
Final M squared measurements were taken Wednesday, 3/29/23 by Peter and Ryan Hinosawa. 5 separate sets of data were taken, and upon discussion, we declared
the plots shown below in attachment 1 and 2 as the final plots of our M squared measurements.

The optical design of the M squared measurement process
is given in attachment 3. The laser and three lenses shown below are mounted on the optical table. The track is placed behind the third lens, and the camera
Entry  Fri Sep 29 11:53:54 2023, Shane, Update, Cleanroom, 5 zone particle count measurement in cleanroom  23.png23.png
Today's 5 zone measurement of cleanroom particulate concentration is attached
Entry  Fri Nov 17 14:06:01 2023, Shane, Update, Cleanroom, 5 zone particle count 23.png
Here's today's 5 zone particle count measurement for the cleanroom. Zone 5 (closest to back wall by fire cabinet) is still above the limit for the larger
size ranges; everything else is in good shape and roughly 10 times under the limit. Not sure why zone 5 is still so dirty (maybe some of the electronics
being stored in bags/bins on the upper shelf of the desk aren't clean?) but will focus cleaning efforts on this zone next time. 
Entry  Thu Nov 9 19:06:46 2023, shane, Update, Cleanroom, 5 zone cleanroom measurement 23.jpeg
Here's today's five zone measurement, taken ~5 hours after the cleaning. Zone 5 (closest to fire cabinet and back wall) is a bit over the limit in all size
ranges (about 1500 particles in 1.0u size range over), and zone 2 is slightly over the limit in the 1.0u range, but everything else is under the requirement.
Entry  Tue Jul 29 12:30:00 2025, Christina, Update, TCS, 260 hour ADC update CSD_06_28_25_270hr.png
 [Ma, Christina, Tyler] 

ADC CyMAC 260 hr, 8192Hz sampling rate channels V3 and Vref6
ELOG V3.1.3-7933898