Wed Aug 16 17:17:02 2023, Shane, Jon, Update, CDS, Binary input chassis powering correctly
|
Tue Aug 8 17:03:22 2023, Shane, Jon, Update, CDS, Binary input chassis finished
|
Thu Apr 16 14:04:46 2026, Mary, Update, Interferometer Simulations, Beam position optimization algorithm
|
Mon Mar 10 21:32:29 2025, Nathan, Physics, Electronics, Beam Profiling and PBS Measurements  
| +
Thu Apr 27 09:48:34 2023, Aiden, Summary, General, Batch 12 Bagging 
|
Tue Feb 11 08:07:02 2025, Luis, Update, VAC, Bake stopped
|
Fri Feb 16 18:37:28 2024, Jon, Update, VAC, Bake ended 6:23 pm
|
Fri Feb 10 15:15:30 2023, Aiden, Update, General, Bagging First Batch
|
Tue Feb 13 12:26:23 2024, Tyler, Update, Interferometer Simulations, BS Code Update 
|
Mon Jul 8 10:39:14 2024, Xuejun, Update, FLIR, Average Temperature Profile
|
Thu Aug 3 18:03:42 2023, Shane, Jon, Update, CDS, Anti-Aliasing chassis complete
| +
Thu Jul 13 15:31:21 2023, Jon, Update, General, Ant traps placed around lab
| +
Thu Jul 13 16:59:03 2023, Jon, Update, General, Ant traps placed around lab
|
Tue Jun 24 13:47:58 2025, Liu, Update, Interferometer Simulations, Alternative FROSTI A# optimization approach
|
Tue Apr 4 16:43:53 2023, Jon, Update, VLC Electronics, Additional Thorlabs PDA10A2
|
Wed Dec 14 18:34:33 2022, Jon, Configuration, Electronics, Adapter for 532 nm laser power supply
|
Mon Jul 3 16:26:21 2023, Cao, Infrastructure, DAQ, Access and control Red Pitaya remotely and run it on local machine
| +
Tue Jul 9 18:19:50 2024, Shane, Update, CDS, ADC-DAC loopback testing and IOLAN installation  
| +
Tue Jul 16 18:43:07 2024, Shane, Update, CDS, ADC-DAC loopback testing and IOLAN installation
|
Mon Dec 4 21:27:53 2023, Shane, Update, CDS, ADC-DAC loopback test results
|
Thu Jul 27 14:46:55 2023, Shane, Jon, Update, Electronics, AA chassis DC on/off switch assembled
|
Fri Oct 27 15:28:30 2023, Shane, Update, CDS, AA and AI chassis for CyMAC powered on and functional 
|
Thu Apr 9 12:40:24 2026, Xuesi Ma, Update, TCS, A# Ring Heater Design
|
Tue May 13 12:41:06 2025, Tyler, Update, TCS, A# Profiles Update
| +
Wed Apr 1 15:02:30 2026, Tyler, Update, TCS, A# FROSTI Profiles Optimization 04/02/2026
| +
Thu Apr 16 13:14:42 2026, Tyler, Update, TCS, A# FROSTI Profiles Optimization 04/02/2026
| +
Thu Mar 5 13:01:14 2026, Tyler, Update, TCS, A# FROSTI Profiles Optimization
| +
Thu Jan 15 12:52:58 2026, Tyler, Update, TCS, A# FROSTI Profiles 01/15/26
| +
Wed Jan 28 11:29:30 2026, Tyler, Update, TCS, A# FROSTI Profiles 01/15/26
| +
Thu Feb 5 13:12:28 2026, Tyler, Update, TCS, A# FROSTI Profiles 01/15/26
| +
Thu Feb 19 12:59:47 2026, Tyler, Update, TCS, A# FROSTI Profiles 01/15/26
|
Tue Jul 1 12:39:42 2025, Tyler, Update, TCS, A# FROSTI Profile Optimization Update
|
Tue Aug 19 12:33:59 2025, Pooyan, Update, TCS, A# BS Update
|
Tue Aug 15 16:10:06 2023, Celeste, Update, TCS, 8/15/2023 Simulation Progress
|
Fri Aug 11 10:57:20 2023, Celeste, Update, TCS, 8/11/23 Simulation Progress
|
Thu Aug 10 14:13:38 2023, Celeste, Update, TCS, 8/10/23, Simulation Graphical Progress
|
Mon May 1 18:56:57 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement 
|
Tue May 2 15:55:33 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement   
|
Thu May 4 14:01:10 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement 
|
Tue May 16 11:56:33 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement
|
Thu May 18 14:07:08 2023, Peter, Update, VLC Update, 532nm Intensity Measurement 
|
Tue Feb 28 19:31:05 2023, Peter, Update, VLC Electronics, 532 M2 Measurements
|
Tue Feb 28 19:33:51 2023, Peter, Update, , 532 M2 Measurements
|
Thu Mar 9 12:03:59 2023, Peter, Update, VLC Electronics, 532 M2 Measurements  
|
Fri Mar 10 12:08:09 2023, Peter, Update, VLC Electronics, 532 M2 Measurements 
|
Tue Apr 4 09:39:58 2023, Peter, Update, VLC Electronics, 532 M2 Measurements   
|
Fri Sep 29 11:53:54 2023, Shane, Update, Cleanroom, 5 zone particle count measurement in cleanroom 
|
Fri Nov 17 14:06:01 2023, Shane, Update, Cleanroom, 5 zone particle count
|
Thu Nov 9 19:06:46 2023, shane, Update, Cleanroom, 5 zone cleanroom measurement
|
Tue Jul 29 12:30:00 2025, Christina, Update, TCS, 260 hour ADC update
|
|