ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 13 of 13  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  576   Tue May 13 12:35:01 2025 Xuesi MaUpdate     resistance_vs_voltage_all.pdfresistance_vs_voltage_overlay.pdfresistance_vs_time_all_channels_all_time_RV.pdf 
  579   Mon May 19 10:59:14 2025 Xuesi MaInfrastructure  

  Status Update


 Previous Status:
  
  583   Tue May 27 12:52:22 2025 Xuesi MaUpdate  Using the configuration in section 2.11.1
in the Sorensen installation and operation
manual (attached below), I'm able to remote
 6x 
  588   Tue Jun 3 13:08:47 2025 Xuesi MaUpdate  We currently have the parts for a DB9 connector
but need parts for a DB25 connector, where
did we get the parts for the DB9 connector?
 934.jpg933.jpg 
  589   Tue Jun 3 13:16:53 2025 Xuesi MaInfrastructure  
    Date and Time:
Around 3:50 PM on June 2, 2025
    Location and Temperature:
 928.jpg929.jpg931.jpg930.jpg932.jpg 
  591   Tue Jun 10 12:13:00 2025 Xuesi MaUpdate  
  By measuring the resistance of the
ladder, I obtained a graph of resistance
as a function of voltage.
 resistance_vs_voltage.pdfresistance_vs_voltage_element_5.pdfresistance_vs_time_all_channels_all_time_RV.pdf 
  594   Tue Jun 17 12:22:43 2025 Xuesi MaUpdate  



   
    
 12x 
  596   Tue Jun 24 11:50:15 2025 Xuesi MaUpdate  



   
    
 resistance_vs_time_all_channels_channel_switch.jpgresistance_vs_time_all_channels_channel_switch_one_cycle_before.jpgresistance_vs_time_all_channels_channel_switch_one_cycle_after.jpgresistance_vs_voltage.jpg 
  603   Tue Jul 1 13:41:36 2025 Xuesi MaUpdate  [Ma, Liu]
 Slides
  
  608   Thu Jul 10 16:41:18 2025 ChristinaUpdateTCS  [Christina, Ma, Tyler] 

 Pomona
Box completed and is now on the server rack
in 1119. Additionally, the photodetectors
 2994921113032912040.JPG4717009101108174053.JPG5782646701589802125.JPG 
  611   Tue Jul 15 10:40:23 2025 ChristinaUpdateTCS  [Christina, Ma, Tyler] 

 Yesterday,
Ma and I started taking data for the PSD/CSD
measurements while the photodetectors and
 rpon.png 
  613   Tue Jul 15 11:47:53 2025 Xuesi MaInfrastructure  
    Date and Time:
Around 4:50 PM on July 1, 2025
    Location and Temperature:
 20250701_165118.jpg20250701_165200.jpg20250701_165329.jpg20250701_165246.jpg 
  615   Tue Jul 22 12:20:29 2025 ChristinaUpdateTCS  [Ma, Christina, Tyler] 
 Figure
1 shows the following PSDs for channels 0-15
from the 14 hour test. Figure 2 shows the
 PSDch0-15.pngCSD2hz_16hz.png 
  620   Thu Jul 31 14:26:58 2025 Xuesi MaUpdate  [Tyler, Ma, Christina, Maple, Cece, Mary,
Pooyan, Audrey]
We started by cleaning outside of
 2025-08-07_cleanroom_chart.png 
  623   Wed Aug 6 16:31:37 2025 Xuesi MaUpdate  
    Date and Time:
Around 4:20 PM on Auguest 6, 2025
    Location and Temperature:
 941.jpg942.jpg943.jpg945.jpg946.jpg 
  628   Tue Aug 12 13:32:43 2025 LiuUpdateInterferometer Simulations Differences in Fused Silica parameters.  Screenshot_2025-08-12_at_1.31.11_PM.pngScreenshot_2025-08-12_at_1.31.17_PM.png 
  629   Tue Aug 12 13:46:56 2025 ChristinaUpdate     3.png3-1.png 
ELOG V3.1.3-7933898