Entry  Fri May 9 20:06:27 2025, Luke , Summary, Cleanroom, Cleanroom cleaning 20250509_particalcount.png
Entry  Mon Jul 14 20:45:20 2025, Luke , Summary, Cleanroom, HEPA filter performance metrics  
Entry  Tue Feb 7 17:27:30 2023, Aiden, Physics, ELOG, Clean and Bake Batch #1 
Entry  Wed Apr 12 16:13:19 2023, Cao, Physics, VAC, Vacuum prep and installation VacAssy230412.png
Entry  Thu Apr 27 16:23:44 2023, Cao, Pamella and Julian, Physics, VAC, Installing vacuum system (cont.) IMG_0139.pngIMG_0136.png
    Reply  Thu Apr 27 21:43:07 2023, Jon, Physics, VAC, Grounding vacuum system IMG_0141.pngIMG_0140.png
    Reply  Fri Apr 28 18:16:57 2023, Cao, Physics, VAC, Grounding vacuum system 
Entry  Fri Apr 28 19:00:13 2023, Cao, Physics, VAC, Tighten CF ports on vacuum chamber TightenCF.png
Entry  Mon May 1 17:10:25 2023, Julian, Cao, Physics, VAC, Installing Pirani gauge and RGA probe onto to vacuum chamber PXL_20230501_225241491.jpgPXL_20230501_235854958.jpgPXL_20230501_234750795.MP.jpg
Entry  Tue May 2 17:03:14 2023, Jon, Cao, Physics, VAC, First pump-down test of vacuum chamber PXL_20230502_203343616.jpgPXL_20230502_210234897.MP.jpg
Entry  Wed May 3 19:03:47 2023, Julian,Pamella and Cao, Physics, VAC, Modify vacuum asssembly and install RGA vaccum_chamber_re-configuration.jpg
Entry  Fri May 12 20:28:34 2023, Aiden, Cao, Physics, VAC, Vacuum chamber Helium leak test PXL_20230512_211717602.jpgArLeak_230512.png
Entry  Mon Mar 10 21:32:29 2025, Nathan, Physics, Electronics, Beam Profiling and PBS Measurements Beam_Profiling_2_20_(2).pdfbeamprfl.pngthumbnail_(6).jfif
Entry  Mon Jul 11 14:29:45 2022, Jon, Omnistructure, General, HEPA filter installed IMG_1530.png
Entry  Wed Dec 14 17:35:41 2022, Jon, Infrastructure, Computers, Windows Laptop laptop.png
Entry  Tue Feb 7 17:44:17 2023, Jon, Infrastructure, Computers, Workstation 1 (ws1) set up ws1.jpg
Entry  Fri Feb 10 16:34:45 2023, Huy Tuong Cao, Infrastructure, Clean & Bake, Nitrogen gas tank ready to use AirGunSealed.jpg
Entry  Wed Mar 1 21:27:20 2023, Jon, Infrastructure, Cleanroom, Over-table shelf height raised cleanroom-shelf.jpg
Entry  Wed Mar 1 21:50:46 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart ws2_cart-1.jpegws2_cart-2.jpeg
Entry  Mon Mar 6 15:32:58 2023, Jon, Infrastructure, General, Cabinet installation completed IMG_0088.jpgIMG_0089.jpg
Entry  Wed Mar 22 12:16:20 2023, Jon, Infrastructure, Cleanroom, Experimenting with HEPA fan speeds 
    Reply  Fri Mar 24 07:14:38 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart 
Entry  Tue Apr 11 13:15:40 2023, Cao, Infrastructure, Clean & Bake, Nitrogen gas tank replaced 
    Reply  Tue May 9 15:49:20 2023, Jon, Infrastructure, VAC, Permanent cable routing 
Entry  Tue May 9 20:55:12 2023, Jon, Infrastructure, VAC, Calibrated Ar leak rate VTI-Calibrated-Ar-Leak.jpeg
Entry  Sun May 14 15:50:48 2023, Cao, Infrastructure, Computers, High resolution display of logrus machine 
Entry  Tue Jun 13 21:08:46 2023, Pamella, Infrastructure, VAC, Heater system - Installation IMG_7563.jpegIMG_7561.jpeg
Entry  Tue Jun 20 22:14:24 2023, Pamella, Cao, Infrastructure, VAC, Short term testing of vacuum heater controller units 
Entry  Wed Jun 21 20:25:05 2023, Cao, Infrastructure, VAC, Vacuum chamber bake attempt 1 6x
    Reply  Tue Jun 27 21:47:56 2023, Jon, Infrastructure, VAC, Vacuum chamber bake attempt 1 IMG_0256.pngIMG_0257.pngIMG_0254.png
Entry  Wed Jun 28 15:58:56 2023, Shane, Cao, Infrastructure, VAC, Power trip problem remains, source of smoke is insulation Pumpline_afterRemoveInsul.jpgRGAline_afterRemoeInsul.jpgMeltedInsulation1.jpgMeltedInsulation1.jpgMeltedInsulation2.jpg
Entry  Thu Jun 29 18:27:26 2023, Jon, Cao, Infrastructure, VAC, Vacuum bake attempt 3: success! NewInsulation.pngBypassLineInsulation.jpg
Entry  Mon Jul 3 14:32:24 2023, Cao, Infrastructure, VAC, Cooling down vacuum chamber 
Entry  Mon Jul 3 16:26:21 2023, Cao, Infrastructure, DAQ, Access and control Red Pitaya remotely and run it on local machine 
Entry  Wed Jul 5 15:46:47 2023, Aiden, Cao, Infrastructure, VAC, Vacuum Chamber Baking Update bake1_230705.png
Entry  Wed Aug 9 11:32:56 2023, Jon, Infrastructure, General, New power cables IMG_0299.jpg
Entry  Sun Dec 17 21:04:15 2023, Jon, Infrastructure, Clean & Bake, Clean and bake lab migrated to 1129 IMG_0781.pngIMG_0782.png
    Reply  Wed Dec 20 10:33:34 2023, Jon, Infrastructure, Clean & Bake, Clean and bake lab migrated to 1129 
Entry  Mon Jan 15 22:29:34 2024, Jon, Infrastructure, General, Cabinet installation & lab clean-up completed 1129.png1119.png
    Reply  Tue Feb 20 08:01:30 2024, Jon, Infrastructure, General, Power and network equipment installed in 1129 rack IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg
Entry  Sat Feb 24 08:53:38 2024, Jon, Infrastructure, Computers, Matlab upgraded to 2023b on Chimay 
Entry  Mon Jun 17 11:47:46 2024, Liu, Infrastructure, General, Temporary cooling units for the labs 1119.jpg1129.jpg
Entry  Thu Jun 20 18:01:11 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129 
Entry  Mon Jun 24 21:38:25 2024, Pooyan, Infrastructure, Computers, Computer server changes in 1119 and 1129 IMG_6889.jpgIMG_6890.jpg
    Reply  Wed Jun 26 15:33:41 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129 IMG_1368.jpg
Entry  Thu Jul 11 21:01:37 2024, Jon, Infrastructure, General, Cable tray installed in 1129 IMG_1395.pngIMG_1396.png
Entry  Fri Jul 26 17:25:42 2024, Jon, Infrastructure, Computers, New workstation ws4 installed in 1129 ws4.jpg
    Reply  Tue Jul 30 07:42:47 2024, Jon, Infrastructure, General, Cable tray installed in 1119 cable_tray_1119.jpg
Entry  Mon Sep 9 14:27:36 2024, Pooyan, Infrastructure, Computers, Chimay backup attempt 
Entry  Thu May 15 12:03:41 2025, Xuesi Ma, Infrastructure, Electronics, Notice 