ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 12 of 14  Not logged in ELOG logo
ID Date Author Typedown Category Subject Text Attachments
  660   Thu Nov 13 12:39:01 2025 MaryUpdateInterferometer Simulations    PA.pdf 
  663   Thu Nov 20 13:03:58 2025 Cece OchoaUpdateELOGCE Cavity Design UpdateUpdate on grouping 0+8th Order Modes  11_20_update.pdf 
  664   Thu Nov 20 13:54:34 2025 TylerUpdateTCSFROSTI A# Optimization and Mesh Convergence AnalysisAttached below are slides discussing FROSTI
A# Irradiance optimization and mesh convergence
analysis for penetration depth.
 Updates_11_19_2025-3.pdf 
  665   Thu Dec 4 12:10:19 2025 TylerUpdateTCSFROSTI A# Profiles and Element Width OptimizationSlides   
  666   Thu Dec 18 12:51:13 2025 TylerUpdateTCSFROSTI A# Profiles UpdateSlides   
  667   Thu Jan 8 12:51:03 2026 TylerUpdateTCSFROSTI A# Update 01/08/2026Slides   
  668   Thu Jan 15 12:52:58 2026 TylerUpdateTCSA# FROSTI Profiles 01/15/26Slides   
  669   Thu Jan 15 13:52:55 2026 Xuesi MaUpdateTCSFROSTI A# Reflector UpdateSlides   
  671   Thu Jan 22 13:12:29 2026 MaryUpdate     PA_matem2.pdfPA_maxtem6.pdfmaxtem600.jpgmaxtem2dis.jpgdismaxtem6.jpg 
  673   Thu Jan 22 14:06:00 2026 Xuesi MaUpdateTCSFROSTI A# Reflector Update Slides   
  674   Wed Jan 28 11:29:30 2026 TylerUpdateTCSA# FROSTI Profiles 01/15/26



  
  675   Thu Jan 29 12:46:22 2026 Cece OchoaUpdate CE Cavity Design Update (4)Update for CE Cavity Arms + Modes 


https://docs.google.com/presentation/d/1-dXYylkAbNpHR4WVCx9Q8ryL_xGlH-JSSLXEUQg6b7Q/edit?usp=sharing
 
  
  678   Thu Feb 5 13:12:28 2026 TylerUpdateTCSA# FROSTI Profiles 01/15/26 Slides
updating progress on FROSTI A# irradiance
profiles and reflector design. Edge roll-off
  
  679   Thu Feb 5 13:34:13 2026 Cynthia UpdateInterferometer SimulationsPoint absorber + miscentering simulation    update2_5_(3).pdf 
  680   Thu Feb 5 13:49:31 2026 MichaelUpdateInterferometer SimulationsUpdating Squeezing Mode Matching LogicAfter some tests, I have determined that the
squeezer in the aLIGO katscript is currently
being matched to the SRC. This logic will
 screenshot2.pngscreenshot1.png 
  681   Thu Feb 5 13:59:42 2026 MaryUpdateInterferometer Simulations    112.pdf 
  683   Thu Feb 12 12:53:51 2026 Cece OchoaUpdateELOGCE Cavity Design UpdateUpdate on HOM placement w/ cavity locking.
Still verifying mode placement

RoC: 28340m
and 26874m
 2_12_short_update.pdf 
  684   Thu Feb 12 12:59:29 2026 MaryUpdate     SB_scattering.pdf 
  685   Thu Feb 12 13:50:38 2026 Xuesi MaUpdateVACVacuum status warning systemVacuum Pressure Warning Script

Script
Location: controls@chimay
Script Path: /vac/python/serial/temp_vacuum_warning.py
  
  686   Thu Feb 19 12:34:18 2026 CynthiaUpdateInterferometer SimulationsPoint absorber simulation   update_2_18.pdf 
  687   Thu Feb 19 12:59:47 2026 TylerUpdateTCSA# FROSTI Profiles 01/15/26
Slides
covering a new approach to optimizing for
A# FROSTI profiles. In particular, we start
  
  688   Thu Feb 26 20:25:10 2026 Cynthia LiangUpdateInterferometer SimulationsPoint Absorber+Miscentering Simulation   update_2_18_Merged.pdf 
  690   Thu Mar 5 13:01:14 2026 TylerUpdateTCSA# FROSTI Profiles Optimization
Slides
discussing updates on FROSTI A# profile optimizations.
In particular, a new RMS function is defined
  
  692   Thu Mar 12 12:48:58 2026 CynthiaUpdateInterferometer SimulationsNew Result of point absorber+miscentering   Untitled_presentation_(1).pdf 
  Draft   Thu Mar 12 13:18:49 2026 Cece OchoaUpdateInterferometer SimulationsCE Cavity Design UpdateAnimation showing how modes shift in the CE
arm cavity for radius 27581m and mirror radius
of40cm as the laser powers up the 1.5 MW.
  
  10   Wed Aug 17 16:04:30 2022 Phoebe ZylaSummaryLoreTesting the Cartridge Heater and Collecting FLIR DataWe have tested the heater to find emissivity,
mounted the heater system to the optical
table, and have taken irradiance maps of
 Screenshot_(74).pngScreenshot_(75).pngScreenshot_from_2022-08-15_11-24-40.pngAcquisitionImage(Aug-15-2022_14_16).jpg 
  19   Fri Feb 3 13:04:04 2023 shaneSummaryGeneralclean room particle counts 1/25/23Clean room count graphs for each zone (as
of January 25, 2023) attached
 cleanroomcountsJan25.pdf 
  29   Mon Feb 13 18:57:53 2023 AidenSummaryGeneralClean and Bake batch 2Cleaned second batch of SS parts with liquinox
for 20 min. Then put in oven for 5 steps;
1. Ramp, 100 degC, 15 min 2. Const, 100 degC,
  
  31   Tue Feb 21 17:51:04 2023 AidenSummaryGeneralClean and Bake batch 4Bagged and Tagged batch 3 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4148.jpgIMG_4147.jpg 
  38   Tue Feb 28 19:37:22 2023 AidenSummaryGeneralClean and Bake batch 5Bagged and Tagged batch 4 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4168.jpgIMG_4169.jpgIMG_4170.jpg 
  42   Fri Mar 3 19:13:33 2023 AidenSummaryGeneralClean and Bake Batch 6Started to clean the dirtiest of the valves.
I could not finish but I definitely made
good progress on it. The MDC valve is very
 IMG_4173.jpgIMG_4174.jpg 
  47   Wed Mar 8 19:29:00 2023 AidenSummaryGeneralClean and Bake batch 7Today gave another cleaning to the MDC gate
valve. It is still very dirty an will need
more cleaning. I also cleaned the other 3
 IMG_4180.jpgIMG_4182.jpg 
  51   Tue Mar 14 18:21:41 2023 AidenSummaryGeneralClean and Bake batch 8Starting off Peter and I refilled the deionized
water barrel.

Then Aiden Cleaned and Bake
the FROSTI arms and bases in liquinox for
  
  52   Fri Mar 17 19:46:39 2023 AidenSummaryGeneralClean and Bake batch 9Bagged and Tagged the reflector arms and bases
and placed them inside the clean room. Total
of 2 bags used. Cleaned and Baked parts in
 IMG-4208.jpgIMG-4209.jpg 
  60   Mon Apr 3 17:04:05 2023 AidenSummaryGeneralIDP Scroll Pump AssemblyAiden installed the isolation valve and the
exhaust silencer kits on the IDP-3 Scroll
pump. The entire assembly still needs to
 IMG_4244.jpg 
  69   Wed Apr 12 10:53:02 2023 AidenSummaryGeneralValve CleaningBagged and Tagged the parts from batch 10
and placed them inside the clean room. 

Then
cleaned the last gate valve in liquinox for
  
  72   Mon Apr 17 17:06:49 2023 AidenSummaryGeneralClean and Bake batch 11Cleaned the Viton O-Ring for the main chamber
in Liquinox for 10 minutes. Then put it in
the oven to back for;

1. Ramp to 100 degC
 IMG_4262.jpg 
  77   Mon Apr 24 17:38:45 2023 AidenSummaryGeneralClean and Bake Batch 12Today I Bagged and tagged the o-rings from
batch 11 and placed them inside the clean
room. I also cleaned batch 12 parts in liquinox
 IMG_4269.jpgIMG_4268.jpg 
  80   Thu Apr 27 09:48:34 2023 AidenSummaryGeneralBatch 12 BaggingI took batch 12 out of the oven and put them
in a bag and placed the bag inside the clean
room in the first large stainless steel container.

I
 IMG_4279.jpgIMG_4278.jpg 
  86   Fri Apr 28 19:39:19 2023 CaoSummaryGeneralClean and Bake Leybold TTR 91 Pirani Gauge



  
  111   Wed May 31 16:18:41 2023 AidenSummaryGeneralMock FROSTIFinished assembly on the Mock FROSTI so it
is ready for the fit test at LIGO lab.
 IMG_4394.jpg 
  121   Tue Jun 13 13:25:05 2023 AidenSummaryClean & BakeClean and Bake Batch 13Cleaned and Baked the new 1.33" and 2.75"
blanks for the vacuum system. Cleaned them
with liquinox in the ultra sonic washer for
  
  148   Thu Jul 6 16:16:03 2023 AidenSummaryVACVacuum Chamber Baking Update
Pressure Measured Before Removing Gauge
2.31 E-7 Torr.


Went in and turned
on the heating tape in increments of 30 degC
  
  291   Mon Dec 11 16:20:17 2023 JonSummaryTCSFROSTI Assembly ProcedureBelow is the procedure we will follow to
assemble the FROSTI prototype.

Install SS guide rods and
  
  312   Wed Jan 31 14:37:26 2024 ShaneSummaryCDSpath directions for CyMAC model and parts libraryPath to cds parts library in Matlab simulink:
/usr/share/advligorts/src/src/epics/simLink.
File name CDS_PARTS.mdl
Path to user models:
  
  472   Thu Nov 14 10:46:20 2024 Luke SummaryCleanroomCleanroom cleaning 
[Luke, Luis, Michael]
cleaning cleanroom and particle count
 partical_count_final.png 
  478   Wed Nov 27 12:27:45 2024 Luke SummaryVACSummary of vacuum work[Luke, Luis]
Update of current state of vacuum
chamber
 2024-11-27_PostBake1_ArO.png 
  497   Wed Jan 8 17:35:57 2025 Luke SummaryCleanroomCleanroom cleaning[Luke, Tyler, Cynthia, Shane, Michael]
Summary of Cleaning Activities:
We began cleaning Room 1119 at 2:00
 partical_count_250108.png 
  500   Tue Jan 21 10:12:02 2025 Luke SummaryGeneralFrosti toy model [Luke, Liu]
Over the winter break I have been
working on this
  
  507   Sat Feb 1 17:25:52 2025 Luke SummaryGeneralCleanroom cleaning[Luke, Cece, Luis]
Particle Count Measurements:

Pre-cleaning (12:15
 20250131_particalcount.png 
ELOG V3.1.3-7933898