Tue Apr 1 11:47:08 2025, Liu, Update, ,
|
|
Mon Mar 31 15:41:56 2025, Xuesi Ma, Update, ,
|
The result from AI Chassis bypass test showed that the AI Chassis may be the problem. There are no spikes from DAC's direct output.
All chassis except timing chassis are turned off. Power supplies for 24V, 18V, and -18V are turned off
The AI chassis has been taken out of the rack for further inspection |
Mon Mar 31 11:26:45 2025, Luke Johnson, Update, Scripts/Programs, Heatmaps of power delivery performance 
|
These plots show the required temperature to release 100W of power and the efficiency of a particular configuration with half-width w and distance away
from the barrel z. I want to add to these heat maps a limit line that has restricts the proximity of the reflectors from the barrel. |
Tue Mar 25 12:56:47 2025, Tyler, Update, TCS, FROSTI Analysis Finalization 
|
Upon final review of the FROSTI analysis included in the (hopefully) soon-to-be submitted instrument paper, I've made some adjustments to the reflectivity
analysis that estimates the amount of power delivered to the test mass by the FROSTI. Initially, as detailed in elog
447, the delivered power was approximated to be 12.6 W (later adjusted to 12.9 W), with roughly 18% of this power being reflected by the test mass. |
Sun Mar 23 15:39:06 2025, Luke Johnson, Update, Scripts/Programs, Ringheater Location optimization   
|
Attached are some plots that show a new parameter sweep with a finer mesh then before. I have also been able to get a heatmap of power of HOMs in a very
simple finesse model. |
Tue Mar 11 11:28:52 2025, Cynthia, Update, Interferometer Simulations, flattening mirror to study power discrepency
|
|
Tue Mar 11 10:43:57 2025, Xuesi Ma, Update, ,
|
Continue investigation in the spikes
Pulsed ADC with a function generator and find no spikes. Rules out ADC for causing the spikes
Loopback test that bypasses the FROSTI Chassis shows spikes (spikes happened on all channels at the same time) |
Mon Mar 10 21:32:29 2025, Nathan, Physics, Electronics, Beam Profiling and PBS Measurements  
|
Beam wasn't diverging, however maybe was about to diverge when measurements stopped? Will discuss the PBS measurements and how the voltage changed due to
the wave plate. |
Mon Mar 10 21:13:12 2025, Nathan, Update, VLC Update, PDH Lock Progress and Next Steps   
|
Progress update: Photodiode is set up, need to set up DC bias tee, EOM has 400-600nm wavelength range with a resonance frequency of 0.1-100MHz. Additionally
need to connect the DC bias to SR560, put it in low pass, then connect to the function generator and connect it to oscilloscope to observe. Once everything
looks good and working, need to connect the driver and we can start actuating on the cavity ETM. |
Mon Mar 10 17:03:52 2025, Shane, Update, CDS, Pressure Gauge successful connect
|
Vac system serial interfacing update: the pressure gauge is now able to communicate successfully through the code. It's been set to a static ip of 192.168.1.30,
on port 8000. |
Wed Mar 5 18:13:20 2025, Shane, Update, CDS, vac system comms
|
[Shane, Jon]
Update on the serial interfacing with the Inficon VGC503 pressure gauge: We began setup of the Inficon pressure gauge today. We configured the ethernet
setting via USB and assigned it a static IP address of 192.168.1.30, which is listed in the network table on the lab wiki. It is showing up on the network |
Wed Mar 5 12:16:28 2025, Shane, Update, CDS, Vac system communications update
|
[Shane, Jon]
Update on the serial interfacing with the vacuum system: both turbo pumps are now able to successfully communicate through the code. The older
pump, for unknown reasons, required a newer version of the communication syntax (despite the newer, small pump being able to communicate fine with the |
Tue Mar 4 10:47:03 2025, Shane, Update, CDS, Vac system pinouts 
|
Attached here are the pinouts, as we currently know them, for the vacuum system. The three items focused on here are the Agilent TwissTorr 74 FS turbo pump
(the smaller/newer pump) and controller, the Agilent TV 551 Navigator turbo pump (the larger/older pump) and controller, and the Eight-channel Perle IOLAN
SDS8 terminal server. The 'field' pinouts in the attached tables refer to the DB9 end of the RJ45F to DB9F converter. |
Tue Mar 4 10:28:58 2025, Tyler, Update, TCS, RIN Plot Updates 
|
|
Tue Mar 4 10:18:43 2025, Cynthia, Update, Interferometer Simulations, attempted to remove curvature and tilt for the coating
|
|
Tue Mar 4 03:33:18 2025, Xuesi Ma, Update, , Update 6x
|
Spikes Appear Again, need to address it systematically.
Power on and off before reaching steady state ✔
At 12V, the rise and fall time of heater elements are different from 24V. |
Tue Mar 4 03:05:42 2025, Xuesi Ma, Update, ELOG, LOG
|
1424564097.243212 2025/02/26 00:14:39 UTC Time start
12V 2A right after start all 8 elements
1424564478.079428 2025/02/26 00:21:00 UTC Time stop |
Thu Feb 27 18:22:21 2025, Shane, Update, CDS, Ongoing work in server rack and desk area (1119)
|
As part of the vacuum communications debugging process, there is ongoing work in the server rack and desk area in 1119. Please be careful not to move any
of the materials left out in the server rack or on the work bench. |
Tue Feb 25 10:56:25 2025, Cynthia, Update, Interferometer Simulations, mirror coating added for simulation rerun
|
I have tried to rerun the simulation on finesse after adding the mirror coating. The result has a large fluctuation in required input power vs arm power
that is concerning. I am currently working on potentially resolve this issue and get a reasonable graph before I proceed to optimizing the thermal maps. |
Tue Feb 25 10:02:32 2025, Xuesi Ma, Update, ,   
|
1424039912.625576 2025/02/19 22:38:14 UTC Time start
24V 2.8A right after start all 8 elements
1424044804.902443 2025/02/19 23:59:46 UTC Time stop |
Tue Feb 25 01:37:00 2025, Michael, Update, Interferometer Simulations, Updates and Current Next Steps for Toroidal Mirrors Project
|
Since the previous discussion of this project, I've worked on building finesse models to verify mathematical results which model the astigmatism in a two
mirror system which we attempt to minimize. This left us with a single condition for an output non-astigmatic beam. However, as can be seen in finesse
simulations, there does exist other configurations which have a negligibly small astigmatism, which we may want to consider. Below I've attached the link |
Mon Feb 24 17:50:13 2025, Luis, Update, VAC, RGA Scan
|
[Ma, Luis]
February 24, 2025 - 1:00PM
Ma performed an RGA scan with the vacuum system containing the heater elements. The results are attached below. |
Sun Feb 23 16:00:07 2025, Luke , Update, Scripts/Programs, Ringheater modeling Update 
|
These are some plots:
The first shows the convergence of the 02 mode reducing the size of the mesh. The second shows the the numerical error of the zernike.
|
Sun Feb 23 12:11:43 2025, Luke , Summary, Cleanroom, Cleanroom cleaning
|
[Luke, Mary, Luis]
Particle Count Measurements:
Pre-cleaning (8:40 am):
Zone 3:
0.3 µm: 441
0.5 µm: 44
1.0 |
Thu Feb 20 17:07:36 2025, Luis, Update, VAC, RGA Scan
|
[Ma, Luis]
February 20, 2025 - 3:30 PM
Ma performed an RGA scan with the vacuum system containing the heater elements. The results are attached below. |
Wed Feb 19 13:44:48 2025, Shane, Update, CDS, Vac serial interfacing update
|
[Jon, Shane]
Debugging update for vac system serial communications: we were able to successfully connect the smaller
turbo pump to the Varian (manufacturer) software today by plugging the controller db9 directly into spica, and verified that the pump was able to send
and receive information. Still no success on communication with the larger pump via python serial code, though. Issue potentially lies in the pinout mapping |
Tue Feb 18 11:19:13 2025, Luke , Configuration, VAC, Repositioning of the lid's temperature probe
|
Before the recent bake I slightly repositioned the temperature probe on the lid from beside the heater tape to under the heater tape. This was done to better
know and control the temperatures of the chamber while baking. It has appeared to work with the temperatures being held very close to the 120C target.
|
Tue Feb 18 10:12:39 2025, Tyler, Update, TCS, Final RIN Plot Update   
|
Below is a preview of the final RIN figure that will be included in the FROSTI instrument paper. A quick summary of what is shown below:
The original RIN CSD measurement is shown on the top panel in red. Frequency bins that exhibit external electronics noise (ex. ADC, photodetector
noise, etc.) are identified and shaded in gray. These noisy bins are then excluded from the dataset before beginning the next step in the analysis process: |
Tue Feb 18 10:02:16 2025, Xuesi Ma, Update, , Group Meeting Slides 2/18/2025
|
https://docs.google.com/presentation/d/1WiV2VqS0BzXNCK6VYYQ-Ty8xlHnzXatQaFbMf1-0rsY/edit?usp=sharing |
Tue Feb 18 10:01:07 2025, Xuesi Ma, Update, ,  
|
[Ma, Pooyan, Tyler]
On Friday, we connected the vacuum chamber with the Cymac. |
Sun Feb 16 16:45:18 2025, Luke , Update, General, Ringheater position optimization   
|
Over the last couple weeks I have been working on finding the optimal position of the ringheater's thermal profile.
Today I would like to give an update of where I am at and my next steps.
Using the python COMSOL interface I have been able to run and save deformation data sweeping through a great deal of potential combinations of |
Fri Feb 14 12:15:23 2025, Luis, Update, VAC, Vacuum sytem staus 
|
[Luis, Luke, Ma]
February 12, 2025 - 4:00 PM
We performed an RGA scan with the vacuum system containing the heater elements. The results are attached below. |
Fri Feb 14 11:57:50 2025, Luis, Update, VAC, Vacuum Update
|
[Luis]
Feb/11/25 9:30am
Pressure gages were connected. |
Tue Feb 11 08:07:02 2025, Luis, Update, VAC, Bake stopped
|
[Luis, Ma]
Feb/10/25 4:00pm
Bake was stopped. |
Fri Feb 7 12:25:56 2025, Luke , Summary, VAC, Started bake
|
[Luke, Luis]
The vacuum chamber is currently baking.
We stepped up to 120°C by increments of 30°C starting at 60°C. We took about an hour break at 90°C to let the temperatures equilibrate. |
Mon Feb 3 13:17:21 2025, Xuesi Ma, Update, , 
|
[Ma]
changed all zip ties to peek zip ties, and grouped wires together. The setup is ready to go into the chamber. |
Sat Feb 1 17:25:52 2025, Luke , Summary, General, Cleanroom cleaning
|
[Luke, Cece, Luis]
Particle Count Measurements:
Pre-cleaning (12:15 PM):
Zone 3:
0.3 µm: 1325
0.5 µm: 265
1.0 |
Fri Jan 31 15:03:09 2025, Xuesi Ma, Update, , Heater Element Circuit Check
|
table {
width: 100%;
border-collapse: collapse; /* Merges borders into a single line */
}
th,
td {
border: 1px solid #ddd; /* Adds a 1px solid border */
padding: 8px;
text-align: left;
}
th
{
background-color: #f2f2f2; /* Adds a light gray background to headers */
}
[Ma] Wed 1/29/2025 |
Tue Jan 28 13:30:46 2025, shane, Update, CDS, Serial comms testing update
|
Attempted to communicate with the smaller vac pump (TwissTor 74) via Agilent software today. Was able to communicate with the pump via python serial connection
code as usual, with no issues. When using the manufacturer software though, it was unable to 'locate' the pump and failed to connect to it. So manufacturer
software works for the big (older) pump, but not the smaller, newer one. Unclear if this is somehow related to the fact that using the manufacturer software |
Mon Jan 27 23:35:28 2025, Xuesi Ma, Update, ,  
|
[Ma]
Installed all the pins to the peek DB 25 connectors |
Mon Jan 27 11:29:38 2025, Xuesi Ma, Update, , Heater Element Test 
|
[Ma, Cece, Luke, Mary, Shane]
On Friday (Jan 24), we installed the heater elements on the stand. The heater elements are arranged from 1 to 8, oriented from right to left
as shown in Attachment 1. Each wire has been labeled according to its corresponding element number and type (e.g., RTD connections, heater connections). |
Sat Jan 25 18:19:39 2025, Luke , Update, General, Ringheater modeling Update
|
Here is a quick update on some of
the things I have been working on regarding my project. |
Wed Jan 22 10:50:08 2025, Tyler, Update, TCS, FROSTI Disassembly   
|
[Tyler, Ma, Cece, Luis, Shane, Luke, Cynthia, Liu, Jon]
On Tuesday (Jan 21), we took the FROSTI apart in front of a filming crew. It was a success!
The footage is going to be used in an APS video detailing the experimental cosmology research conducted in the department.
The FROSTI reflectors, heater elements, and legs were all bagged separately and a currently being stored in the cleanroom. If you need to do |
Tue Jan 21 10:12:02 2025, Luke , Summary, General, Frosti toy model
|
[Luke, Liu]
Over the winter break I have been working on this desmos toy model of the Frosti. There
are still a few rough spots but I belive that it is a good visual representation of a 2D slice of the frosti. |
Fri Jan 17 13:27:07 2025, Tyler, Update, TCS, FROSTI Pre-disassembly 
|
[Tyler, Ma, Cece, Jon, Luke, Cynthia, Michael]
On Tuesday, we prepared the FROSTI for disassembly in anticipation of the APS filming that is set to
take place in the labs. The FROSTI has been unbolted from the optical table in the cleanroom, with its wires weighted down and the majority of its screws
removed to ensure an easy removal of the reflectors during the filming process.
|
Tue Jan 14 10:27:14 2025, Tyler, Update, TCS, RIN Updates
|
[Tyler]
Attached below are updated plots for the FROSTI RIN measurements for Jan 14 group meeting.
|
Wed Jan 8 17:35:57 2025, Luke , Summary, Cleanroom, Cleanroom cleaning
|
[Luke, Tyler, Cynthia, Shane, Michael]
Summary of Cleaning Activities:
We began cleaning Room 1119 at 2:00 PM. |
Thu Jan 2 17:52:58 2025, Luis, Update, VAC, MR Testing Continuation  
|
[Luis, Luke]
RGA Volume: T = 22°C, P = 2.10e-9 Torr
Main Volume: T = 21°C, P = 5.71e-9 Torr
|
Mon Dec 23 14:33:36 2024, Tyler, Update, TCS, Latest RIN Measurement Results   
|
Attached below are the measurements I took from the FROSTI from 12/18-12/22. |
Sun Dec 22 20:43:35 2024, Luis, Update, VAC, MR Testing 
|
[Luis, Luke]
RGA Volume: T = 23°C, P = 3.0e-9 Torr
Main Volume: T = 22°C, P = 9.90e-9 Torr
After letting the vacuum cool down for a couple days, we reattached the magnets and sensors, then we performed a RGA scan of the vacuum system, |