  726   Thu Jul 2 13:27:48 2026 Joshua MarmorUpdateGeneralHBT SURF Update #1Update on the progress for the HBT measurement.  group-meeting-july-2.pdf 
  727   Thu Jul 2 14:46:19 2026 XuesiUpdate FROSTI Reflector DesignUpdate on the FROSTI reflector design
slides
  
  728   Mon Jul 6 18:25:26 2026 shaneUpdateInventoryCleaning/PPE inventory


The cleaning
supply/PPE inventory has now been fully updated
and the spreadsheet can be viewed here.
  
  730   Thu Jul 9 12:13:02 2026 Abhiram SharmaUpdateInterferometer Simulations Update on MCMC SURF project  Week_2_-_Group_Meeting_Update_Abhi.pdf 
  731   Thu Jul 9 12:27:20 2026 Joshua MarmorUpdateGeneralWeek 2 HBT Surf ProjectSlides for group meeting, updates on HBT measurement  group-meeting-july-9.pdf 
  733   Thu Jul 9 13:35:08 2026 MaryUpdateInterferometer Simulations    gt_Current_gt1_landscape.pnggt_Current_gt1_2d.png 
  736   Thu Jul 16 10:29:19 2026 JoshuaUpdateGeneralHBT SURF Update #3

[Joshua, Mary, Ma, Abhi]




On Wednesday (7/15), the particle
count measurement was sufficient, so the
 IMG_8060.jpgIMG_8057.jpg 
  737   Thu Jul 16 10:52:02 2026 JoshuaUpdateGeneralHBT SURF Update #3 - group meeting slides   group-meeting-july-16.pdf 
  738   Thu Jul 16 13:14:26 2026 CynthiaUpdateInterferometer SimulationsLIGO pre-figuring team meeting summary Pre-figuring meeting 7/14: 

 - the
non-uniformity brought by annealing for ETM14
and 11 seems to be higher than expected,
  
  739   Tue Jul 21 15:47:55 2026 JoshuaUpdateGeneralHBT SURF Update #4 - Alignment & First Measurement
HBT Alignment & First Measurement




HBT
setup was aligned for maximum power on the
transmissive arm, then the beamsplitter was
  
  740   Tue Jul 21 17:58:36 2026 PooyanUpdateCDSCymac DAQ channel add for long-term recordingChanged the sample rate of Cymac ADC channels
V3 and VREF6 to 65 kHz for long-time recording.
(65536 to be exact)
 Screenshot_20260721_193849.png 
  741   Sun Jul 26 13:07:04 2026 CeceUpdateInventoryVacuum Part InventoryTook a more comprehensive inventory of the
vacuum chamber parts on the optical table
in 1129. Made note of scratches, chips, stains
 Issues_with_parts.pdf 
  742   Wed Jul 29 23:56:29 2026 CynthiaUpdateInterferometer SimulationsPre-figuring meeting 7/28 summery Pre-figuring meeting 7/14: 

 - using
the change in surface from annealing, Hiro
did some study on HOM scattering/losses from
 IMG_6504.jpg 
  743   Thu Jul 30 14:15:52 2026 JoshuaUpdateGeneralHBT SURF Update #5 - Group Meeting SlidesAttached are my group meeting slides and some
calculations from Mary which predict the
photon bunching cross correlation signal.
 group-meeting-slides-july-30.pdfHBT_V2.pdf 
  745   Thu Aug 6 10:46:49 2026 Abhiram SharmaUpdateInterferometer SimulationsMCMC Test with Synthetic DataThis corner plot was generated using the base
finesse-ligo LLO model for the MCMC forward
model. The prior distributions were centered
 CornerPlot_baseLLO_10Params.svg 
  746   Thu Aug 6 14:39:47 2026 JoshuaUpdateGeneralHeating Element Power Data

This is a measurement done to determine
which heating elements output the most power.
FROSTI was supplied 33V, and a photodetector
  
  10   Wed Aug 17 16:04:30 2022 Phoebe ZylaSummaryLoreTesting the Cartridge Heater and Collecting FLIR DataWe have tested the heater to find emissivity,
mounted the heater system to the optical
table, and have taken irradiance maps of
 Screenshot_(74).pngScreenshot_(75).pngScreenshot_from_2022-08-15_11-24-40.pngAcquisitionImage(Aug-15-2022_14_16).jpg 
  19   Fri Feb 3 13:04:04 2023 shaneSummaryGeneralclean room particle counts 1/25/23Clean room count graphs for each zone (as
of January 25, 2023) attached
 cleanroomcountsJan25.pdf 
  29   Mon Feb 13 18:57:53 2023 AidenSummaryGeneralClean and Bake batch 2Cleaned second batch of SS parts with liquinox
for 20 min. Then put in oven for 5 steps;
1. Ramp, 100 degC, 15 min 2. Const, 100 degC,
  
  31   Tue Feb 21 17:51:04 2023 AidenSummaryGeneralClean and Bake batch 4Bagged and Tagged batch 3 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4148.jpgIMG_4147.jpg 
  38   Tue Feb 28 19:37:22 2023 AidenSummaryGeneralClean and Bake batch 5Bagged and Tagged batch 4 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4168.jpgIMG_4169.jpgIMG_4170.jpg 
  42   Fri Mar 3 19:13:33 2023 AidenSummaryGeneralClean and Bake Batch 6Started to clean the dirtiest of the valves.
I could not finish but I definitely made
good progress on it. The MDC valve is very
 IMG_4173.jpgIMG_4174.jpg 
  47   Wed Mar 8 19:29:00 2023 AidenSummaryGeneralClean and Bake batch 7Today gave another cleaning to the MDC gate
valve. It is still very dirty an will need
more cleaning. I also cleaned the other 3
 IMG_4180.jpgIMG_4182.jpg 
  51   Tue Mar 14 18:21:41 2023 AidenSummaryGeneralClean and Bake batch 8Starting off Peter and I refilled the deionized
water barrel.

Then Aiden Cleaned and Bake
the FROSTI arms and bases in liquinox for
  
  52   Fri Mar 17 19:46:39 2023 AidenSummaryGeneralClean and Bake batch 9Bagged and Tagged the reflector arms and bases
and placed them inside the clean room. Total
of 2 bags used. Cleaned and Baked parts in
 IMG-4208.jpgIMG-4209.jpg 
  60   Mon Apr 3 17:04:05 2023 AidenSummaryGeneralIDP Scroll Pump AssemblyAiden installed the isolation valve and the
exhaust silencer kits on the IDP-3 Scroll
pump. The entire assembly still needs to
 IMG_4244.jpg 
  69   Wed Apr 12 10:53:02 2023 AidenSummaryGeneralValve CleaningBagged and Tagged the parts from batch 10
and placed them inside the clean room. 

Then
cleaned the last gate valve in liquinox for
  
  72   Mon Apr 17 17:06:49 2023 AidenSummaryGeneralClean and Bake batch 11Cleaned the Viton O-Ring for the main chamber
in Liquinox for 10 minutes. Then put it in
the oven to back for;

1. Ramp to 100 degC
 IMG_4262.jpg 
  77   Mon Apr 24 17:38:45 2023 AidenSummaryGeneralClean and Bake Batch 12Today I Bagged and tagged the o-rings from
batch 11 and placed them inside the clean
room. I also cleaned batch 12 parts in liquinox
 IMG_4269.jpgIMG_4268.jpg 
  80   Thu Apr 27 09:48:34 2023 AidenSummaryGeneralBatch 12 BaggingI took batch 12 out of the oven and put them
in a bag and placed the bag inside the clean
room in the first large stainless steel container.

I
 IMG_4279.jpgIMG_4278.jpg 
  86   Fri Apr 28 19:39:19 2023 CaoSummaryGeneralClean and Bake Leybold TTR 91 Pirani Gauge



  
  111   Wed May 31 16:18:41 2023 AidenSummaryGeneralMock FROSTIFinished assembly on the Mock FROSTI so it
is ready for the fit test at LIGO lab.
 IMG_4394.jpg 
  121   Tue Jun 13 13:25:05 2023 AidenSummaryClean & BakeClean and Bake Batch 13Cleaned and Baked the new 1.33" and 2.75"
blanks for the vacuum system. Cleaned them
with liquinox in the ultra sonic washer for
  
  148   Thu Jul 6 16:16:03 2023 AidenSummaryVACVacuum Chamber Baking Update
Pressure Measured Before Removing Gauge
2.31 E-7 Torr.


Went in and turned
on the heating tape in increments of 30 degC
  
  291   Mon Dec 11 16:20:17 2023 JonSummaryTCSFROSTI Assembly ProcedureBelow is the procedure we will follow to
assemble the FROSTI prototype.

Install SS guide rods and
  
  312   Wed Jan 31 14:37:26 2024 ShaneSummaryCDSpath directions for CyMAC model and parts libraryPath to cds parts library in Matlab simulink:
/usr/share/advligorts/src/src/epics/simLink.
File name CDS_PARTS.mdl
Path to user models:
  
  472   Thu Nov 14 10:46:20 2024 Luke SummaryCleanroomCleanroom cleaning 
[Luke, Luis, Michael]
cleaning cleanroom and particle count
 partical_count_final.png 
  478   Wed Nov 27 12:27:45 2024 Luke SummaryVACSummary of vacuum work[Luke, Luis]
Update of current state of vacuum
chamber
 2024-11-27_PostBake1_ArO.png 
  497   Wed Jan 8 17:35:57 2025 Luke SummaryCleanroomCleanroom cleaning[Luke, Tyler, Cynthia, Shane, Michael]
Summary of Cleaning Activities:
We began cleaning Room 1119 at 2:00
 partical_count_250108.png 
  500   Tue Jan 21 10:12:02 2025 Luke SummaryGeneralFrosti toy model [Luke, Liu]
Over the winter break I have been
working on this
  
  507   Sat Feb 1 17:25:52 2025 Luke SummaryGeneralCleanroom cleaning[Luke, Cece, Luis]
Particle Count Measurements:

Pre-cleaning (12:15
 20250131_particalcount.png 
  509   Fri Feb 7 12:25:56 2025 Luke SummaryVACStarted bake[Luke, Luis]
The
vacuum chamber is currently baking. 
  
  520   Sun Feb 23 12:11:43 2025 Luke SummaryCleanroomCleanroom cleaning[Luke, Mary, Luis]
Particle Count Measurements:

Pre-cleaning (8:40
 partical_count_2-21-25.png 
  574   Fri May 9 20:06:27 2025 Luke SummaryCleanroomCleanroom cleaning[Luke, Mohak, Luis]
We were also able to remove the residue
that has built up on the soft walls by donning
 20250509_particalcount.png 
  609   Mon Jul 14 20:45:20 2025 Luke SummaryCleanroomHEPA filter performance metrics [Luke, Luis]

We’ve been looking into methods
for evaluating the performance of the HEPA
  
  704   Fri Apr 24 23:55:50 2026 DhatriSummaryInterferometer Simulations   [Sidd, Pooyan, Dhatri]  In the group meeting on 04/23/26, we   
  710   Tue May 5 14:13:45 2026 DhatriSummaryInterferometer SimulationsMode mismatch[Pooyan, Tyler, Ceci, Dhatri] 

Attached are the plots generated by
running the newer code here for input power
 llo_power_up_1461976383.pdf 
  23   Tue Feb 7 17:27:30 2023 AidenPhysicsELOGClean and Bake Batch #1Cleaned SS parts with liquinox for 20 min.
Then put in oven for 5 steps;
1. Ramp, 100
degC, 15 min
2. Const, 100 degC, 30 min
3.
  
  70   Wed Apr 12 16:13:19 2023 CaoPhysicsVACVacuum prep and installationAiden, Pamella, Peter, Shane, Cao 


Today
we started vacuum chamber assembly work


10:16 am: Particle count measurement of clean
 VacAssy230412.png 
  81   Thu Apr 27 16:23:44 2023 Cao, Pamella and JulianPhysicsVACInstalling vacuum system (cont.)
 
[Pamella, Cao and Julian, Shane]



 Particles account 

10:37 am: Starting the particles account
 IMG_0139.pngIMG_0136.png 