  380   Fri Jun 21 11:47:30 2024 LiuUpdateScripts/ProgramsCOMSOL simulation on alternative straightened heater elements design In the previous post, we saw
that for the heater element design with straight
 6x 
  375   Mon Jun 10 14:52:38 2024 TylerUpdateFLIRCIT FROSTI Analysis Update[Tyler]


Upon further inspection, one
adjustment was made to the FROSTI profile
analysis: changing the transmission value
 FROSTI_HR_Temperature_Difference-7.png 
  586   Tue Jun 3 11:54:06 2025 Cece OchoaUpdate CE Cavity Design UpdateUpdate on the design for the CE Cavity Mirrors  CE_Arm_Cavity_.pdf 
  394   Fri Jul 5 14:12:32 2024 LiuUpdateInterferometer SimulationsCE BS Mechanical ResonancesThe butterfly and drumhead mechanical modes
for the aLIGO BS were calculated in COMSOL.
The resonant frequencies for the two acoustic
 butterfly.pngdrumhead.png 
  585   Tue Jun 3 11:50:08 2025 PooyanUpdateCDSCDS updateThere are three major issues with the lab's
CDS system that should be addressed. They
are ordered from the highest priority to
  
  590   Tue Jun 10 12:11:14 2025 PooyanUpdateCDSCDS update
The MEDM models issue was fixed.
The issue was that building the c1msc model
alone was not enough and we had to re-build
  
  592   Wed Jun 11 16:19:37 2025 PooyanUpdateCDSCDS update
Fast channels recorded to .gwf frame
files

Had to add a DAQ Channels
block to the c1msc model for those channel
 Screenshot_20250611_154834.pngf3k.pdf 
  321   Tue Feb 13 01:26:30 2024 PeterUpdateInterferometer SimulationsCARM Power SimulationsCao's simulations of the circulating power
and gouy phase through a single arm cavity
of the interferometer have been reproduced.
 Scenario_3_CARM.pdfScenario_3_CARM_Gouy.pdf 
  199   Wed Aug 9 17:35:26 2023 ShaneUpdateCDSBinary output chassis finishedFinished the internal wiring for the binary
output chassis today, which completes its
assembly. Also secured ribbon cables and
 IMG_8685.jpegIMG_8686.jpeg 
  211   Wed Aug 16 17:17:02 2023 Shane, JonUpdateCDSBinary input chassis powering correctly Binary input chassis passed power-on test,
and is lighting up as expected. Binary output
chassis also successfully powered on. AA
 IMG_9253.jpeg 
  197   Tue Aug 8 17:03:22 2023 Shane, JonUpdateCDSBinary input chassis finishedFinished assembly of the binary input chassis
today, including DC on/off switch and LED
installation. external cable assemblies still
 IMG_8681.jpeg 
  537   Mon Mar 10 21:32:29 2025 NathanPhysicsElectronicsBeam Profiling and PBS MeasurementsBeam wasn't diverging, however maybe was about
to diverge when measurements stopped? Will
discuss the PBS measurements and how the
 Beam_Profiling_2_20_(2).pdfbeamprfl.pngthumbnail_(6).jfif 
  80   Thu Apr 27 09:48:34 2023 AidenSummaryGeneralBatch 12 BaggingI took batch 12 out of the oven and put them
in a bag and placed the bag inside the clean
room in the first large stainless steel container.

I
 IMG_4279.jpgIMG_4278.jpg 
  510   Tue Feb 11 08:07:02 2025 LuisUpdateVACBake stopped [Luis, Ma]
        Feb/10/25 4:00pm

        Bake was stopped.
  
  327   Fri Feb 16 18:37:28 2024 JonUpdateVACBake ended 6:23 pmI ended the bake of the UHV system (that
began on Monday) at 6:23 pm today by switching
OFF both PID controllers. The heaters elements
  
  25   Fri Feb 10 15:15:30 2023 AidenUpdateGeneralBagging First BatchAiden Bagged and Tagged the first batch of
stainless steel parts shown on the google
spread sheet. 
1. Removed two parts from
  
  324   Tue Feb 13 12:26:23 2024 TylerUpdateInterferometer SimulationsBS Code Update I reproduced Cao's CE beamsplitter code
(see below for example plots). I received
the current info on the beamsplitter parameters
 thickness1.pdfbs_opd_homloss_h6cm_w2cm.pdf 
  396   Mon Jul 8 10:39:14 2024 XuejunUpdateFLIRAverage Temperature Profile After taking data for each of the individual
heater elements, I imported them into python
and overlayed them to produce an average
 Average-Temperature-Profile.pdf 
  191   Thu Aug 3 18:03:42 2023 Shane, JonUpdateCDSAnti-Aliasing chassis completeWe finished installing the internal power
supply cables in the anti-aliasing chassis
today, which concludes its assembly. Work
 IMG_8544.jpeg 
  154   Thu Jul 13 15:31:21 2023 JonUpdateGeneralAnt traps placed around labIn response to reports that ants have been
observed in the lab, I placed five ant bait
traps around the room today. Each is sitting
  
  155   Thu Jul 13 16:59:03 2023 JonUpdateGeneralAnt traps placed around labUpdate: After seeing the
strong response to the first set, I redistributed
them to the hottest spots and added one more
  
  598   Tue Jun 24 13:47:58 2025 LiuUpdateInterferometer SimulationsAlternative FROSTI A# optimization approachAlternative FROSTI A# optimization approach  Update.pdf 
  63   Tue Apr 4 16:43:53 2023 JonUpdateVLC ElectronicsAdditional Thorlabs PDA10A2I ordered a second PDA10A2 and mounting post
+ spacer (which puts the aperture at the
VLC's standard 3" beam height). These arrived
 PDA10A2.png 
  14   Wed Dec 14 18:34:33 2022 JonConfigurationElectronicsAdapter for 532 nm laser power supplyI installed an EU-to-US plug adapter for the
532nm laser's 9V power supply. I then re-measured
the laser's power with the correct supply
 laser_power.png 
  142   Mon Jul 3 16:26:21 2023 CaoInfrastructureDAQAccess and control Red Pitaya remotely and run it on local machine[Cao]


To access and control the Red
Pitaya using Python locally on a machine
within the local network, one should follow
  
  399   Tue Jul 9 18:19:50 2024 ShaneUpdateCDSADC-DAC loopback testing and IOLAN installation[Shane, Jon]

Finished ADC-DAC loopback
testing today (see attached xlsx file or
access directly here).
 iolanServerTerminal.jpegADC-DAC_Loopback_Testing.xlsxupdatedc1msc.jpeg 
  410   Tue Jul 16 18:43:07 2024 ShaneUpdateCDSADC-DAC loopback testing and IOLAN installation
UPDATE: 
Follow up ADC-DAC loopback testing
now complete, matching all the ADC channels
to a single DAC channel, and then matching
 Follow-up_ADC-DAC_Loopback_Testing.xlsx 
  285   Mon Dec 4 21:27:53 2023 ShaneUpdateCDSADC-DAC loopback test resultsHere are the test results from today's ADC-DAC
loopback tests. Channels 14 and 15 were the
only ones behaving abnormally. Not sure what
 adc-dac_loopback_testing_results.pdf 
  176   Thu Jul 27 14:46:55 2023 Shane, JonUpdateElectronicsAA chassis DC on/off switch assembledMade the first DC on/off switch assembly today
and installed in anti-aliasing chassis. Second
switch assembly to be completed later.
  
  247   Fri Oct 27 15:28:30 2023 ShaneUpdateCDSAA and AI chassis for CyMAC powered on and functionalCyMAC updates: Switched out the faulty power
regulator boards in the Anti-Aliasing and
Anti-Imaging chassis. Both chassis are now
 AI_chassis_lights_on.jpegAA_chassis_lights_on.jpeg 
  577   Tue May 13 12:41:06 2025 TylerUpdateTCSA# Profiles UpdateSlides on the A# ITM FROSTI profile modeling
efforts can be found here.
  
  602   Tue Jul 1 12:39:42 2025 TylerUpdateTCSA# FROSTI Profile Optimization Update[Tyler, Liu]

 Slides
  
  632   Tue Aug 19 12:33:59 2025 PooyanUpdateTCSA# BS Update   A#_beamsplitter_thermal_lensing.pdf 
  209   Tue Aug 15 16:10:06 2023 CelesteUpdateTCS8/15/2023 Simulation Progress   Simulation_Progress__1_32nd_Model_(2).pdf 
  204   Fri Aug 11 10:57:20 2023 CelesteUpdateTCS8/11/23 Simulation Progress   Simulation_Progress__1_32nd_Model_(1).pdf 
  200   Thu Aug 10 14:13:38 2023 CelesteUpdateTCS8/10/23, Simulation Graphical Progress   Simulation_Progress__8_10_23.pdf 
  88   Mon May 1 18:56:57 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementI've configured the two PDA's to the Red Pitaya.
I put a 50 ohm resistor connector to each
red pitaya input port. This was because the
 graphs.jpgTime_Series_Trial_1.png 
  89   Tue May 2 15:55:33 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementI changed the 1/2 wave plate from the lens
mount to the rotational optic mount. This
allowed me to rotate the 1/2 wave plate,
 IMG-0221.jpgIMG-0222.jpggraphs(1).jpgTime_Series_Trial_2.png 
  92   Thu May 4 14:01:10 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementI adjusted the rotational mount of the wave
plate to see if the power can be 100% coupled
into either S or P polarization. The images
 graphs(3).jpggraphs(2).jpg 
  99   Tue May 16 11:56:33 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementWith the configuration the exact same as before,
I used the Jupyter notebook in the red pitaya's
development package to collect data from
 Time_Series_Trial_3.png 
  101   Thu May 18 14:07:08 2023 PeterUpdateVLC Update532nm Intensity MeasurementI figured out a method in which to capture
power measurements including the initial
seconds in which the beam is first turned
 Time_Series_Trial_4.pngTime_Series_Trial_5_2hrs.png 
  36   Tue Feb 28 19:31:05 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook M2 measurements today. Configuration:
Lens 1 (f = 50mm) at 0mm. Lens 2 (f = 150mm)
at 200mm, camera at 350mm. The laser beam
 X_width_and_Y_width.png 
  37   Tue Feb 28 19:33:51 2023 PeterUpdate 532 M2 MeasurementsY axis of plot in units of micrometers. X
axis in units of millimeters. 
  
  48   Thu Mar 9 12:03:59 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 Data today. Picture of the optical
set up is shown below. lens1 f = 100mm, lens2
f = 50mm, lens3 f = 150mm. There was a nice
 OmegaY_M2_Fit_3.pngOmegaX_M2_Fit_3.pngoptical_setup.jpg 
  50   Fri Mar 10 12:08:09 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 laser data today. The configuration
is the same as before except now the beam
camera is the only component moving. Pictures
 OmegaX_M2_Fit_4.pngOmegaY_M2_Fit_4.png 
  61   Tue Apr 4 09:39:58 2023 PeterUpdateVLC Electronics532 M2 MeasurementsFinal M squared measurements were taken Wednesday,
3/29/23 by Peter and Ryan Hinosawa. 5 separate
sets of data were taken, and upon discussion,
 OmegaY_M2_Fit_8.pdfOmegaX_M2_Fit_8.pdfM2_Measurements_Set_Up.svgBeam_Data_8_3lens.txt 
  230   Fri Sep 29 11:53:54 2023 ShaneUpdateCleanroom5 zone particle count measurement in cleanroom Today's 5 zone measurement of cleanroom particulate
concentration is attached
 23.png23.png 
  270   Fri Nov 17 14:06:01 2023 ShaneUpdateCleanroom5 zone particle countHere's today's 5 zone particle count measurement
for the cleanroom. Zone 5 (closest to back
wall by fire cabinet) is still above the
 23.png 
  260   Thu Nov 9 19:06:46 2023 shaneUpdateCleanroom5 zone cleanroom measurementHere's today's five zone measurement, taken
~5 hours after the cleaning. Zone 5 (closest
to fire cabinet and back wall) is a bit over
 23.jpeg 
  619   Tue Jul 29 12:30:00 2025 ChristinaUpdateTCS260 hour ADC update [Ma, Christina, Tyler] 

ADC CyMAC
260 hr, 8192Hz sampling rate channels V3
and Vref6
 CSD_06_28_25_270hr.png 