ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 12 of 12  Not logged in ELOG logo
Entry  Tue Apr 22 12:08:46 2025, Xuesi Ma, Update, ,  20250415_161755.jpg20250416_174640.jpg20250422_105614.jpg
Test 7: Reconnect ribbon cables

  Setup: Reconnect all the ribbon cables, and turned on the AI Chassis while isolated
rack
  Observation: No spike observed.


Test 8: Reconnect to rack

  Setup:
Reconnect the AI Chassis to the rack.
  Observation: No spike observed.


Test 9: Restore to original position.

ELOG V3.1.3-7933898