ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 12 of 12  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  99   Tue May 16 11:56:33 2023 PeterUpdateVLC Electronics532nm Intensity MeasurementWith the configuration the exact same as before,
I used the Jupyter notebook in the red pitaya's
development package to collect data from
 Time_Series_Trial_3.png 
  101   Thu May 18 14:07:08 2023 PeterUpdateVLC Update532nm Intensity MeasurementI figured out a method in which to capture
power measurements including the initial
seconds in which the beam is first turned
 Time_Series_Trial_4.pngTime_Series_Trial_5_2hrs.png 
  36   Tue Feb 28 19:31:05 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook M2 measurements today. Configuration:
Lens 1 (f = 50mm) at 0mm. Lens 2 (f = 150mm)
at 200mm, camera at 350mm. The laser beam
 X_width_and_Y_width.png 
  37   Tue Feb 28 19:33:51 2023 PeterUpdate 532 M2 MeasurementsY axis of plot in units of micrometers. X
axis in units of millimeters. 
  
  48   Thu Mar 9 12:03:59 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 Data today. Picture of the optical
set up is shown below. lens1 f = 100mm, lens2
f = 50mm, lens3 f = 150mm. There was a nice
 OmegaY_M2_Fit_3.pngOmegaX_M2_Fit_3.pngoptical_setup.jpg 
  50   Fri Mar 10 12:08:09 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 laser data today. The configuration
is the same as before except now the beam
camera is the only component moving. Pictures
 OmegaX_M2_Fit_4.pngOmegaY_M2_Fit_4.png 
  61   Tue Apr 4 09:39:58 2023 PeterUpdateVLC Electronics532 M2 MeasurementsFinal M squared measurements were taken Wednesday,
3/29/23 by Peter and Ryan Hinosawa. 5 separate
sets of data were taken, and upon discussion,
 OmegaY_M2_Fit_8.pdfOmegaX_M2_Fit_8.pdfM2_Measurements_Set_Up.svgBeam_Data_8_3lens.txt 
  230   Fri Sep 29 11:53:54 2023 ShaneUpdateCleanroom5 zone particle count measurement in cleanroom Today's 5 zone measurement of cleanroom particulate
concentration is attached
 23.png23.png 
  270   Fri Nov 17 14:06:01 2023 ShaneUpdateCleanroom5 zone particle countHere's today's 5 zone particle count measurement
for the cleanroom. Zone 5 (closest to back
wall by fire cabinet) is still above the
 23.png 
  260   Thu Nov 9 19:06:46 2023 shaneUpdateCleanroom5 zone cleanroom measurementHere's today's five zone measurement, taken
~5 hours after the cleaning. Zone 5 (closest
to fire cabinet and back wall) is a bit over
 23.jpeg 
  314   Fri Feb 2 19:08:20 2024 AidenUpdateVAC1st Hot Element RGA ScanHere are the measurements for the RGA scan
of the elements while on at around 160C.
The pressure of the chamber during the test
 bake10_240202_Elements_ArC.pngbake10_240202_Elements_ArO.png 
  274   Tue Nov 21 14:47:24 2023 TylerUpdateLore1129 Workbench Assembly Update 1
[Tyler, Shane, Mohak, Cynthia, Luke,
Michael, Luis]


Started assembly of the workbench
 IMG_7569.jpgIMG_7568.jpg 
  278   Mon Nov 27 14:22:30 2023 TylerUpdateLore1129 Assembly Update[Tyler, Michael, Luke, Cynthia]


The
tabletops have been attached to the workbench
frames. Unfortunately, one of the tabletops
 IMG_7669.jpgIMG_7668.jpg 
  75   Fri Apr 21 15:21:18 2023 PamellaUpdateFLIR      FLIR project updates

    

01:50 pm: Starting test position 34 mm distance
to black wall. 
  Parameters :
 AcquisitionImage(Apr-21-2023_14_26).jpg 
  249   Mon Oct 30 11:03:56 2023 TylerUpdateScripts/Programs 
FLIR: After some adjustments, the plot
generated from the FLIR measurements look
much more symmetric (see attachment). There
 Screenshot_2023-10-23_at_12.39.05_PM.png 
  299   Mon Jan 8 20:24:53 2024 AidenUpdateGeneral [Jon, Aiden]

Installed the heater elements
into their fixture and prepped the cables
by twisting the wires into pairs. We also
 IMG_4888.jpgIMG_4886.jpgIMG_4887.jpg 
  306   Tue Jan 16 16:11:41 2024 AidenUpdateVAC [Aiden,Luis]

Below is the data for the
most recent bake. I believe the chamber is
cleaner than it is actually showing as the
 bake10_240116_Elements_ArO.pngbake10_240116_Elements_ArC.png 
  391   Mon Jul 1 11:45:45 2024 SidUpdateInterferometer Simulations Progress update: Most of last week was spent
getting set up with SIS, and learning how
to do basic simulations. The goal for this
  
  421   Tue Aug 6 13:07:07 2024 XuejunUpdateInterferometer Simulations [Xuejun]

 The width and location of
the measured in-air change in temperature
profile has been determined to be 0.045m
 Thermal_model_image.pnggenerated_irradiance_profile.png 
  471   Wed Nov 13 14:06:00 2024 Luke UpdateGeneral slides   
  504   Mon Jan 27 23:35:28 2025 Xuesi MaUpdate  [Ma]
Installed all the pins to the peek
DB 25 connectors
 20250127_142647.jpg20250127_153454.jpg20250127_154516.jpg 
  508   Mon Feb 3 13:17:21 2025 Xuesi MaUpdate  [Ma]
changed all zip ties to peek zip
ties, and grouped wires together. The setup
 20250203_123153.jpg20250203_123213.jpg 
  514   Tue Feb 18 10:01:07 2025 Xuesi MaUpdate  [Ma, Pooyan, Tyler]
On Friday, we connected the vacuum
chamber with the Cymac.
 IMG_7916.jpegIMG_7915.jpegIMG_7917.jpeg 
  525   Tue Feb 25 10:02:32 2025 Xuesi MaUpdate  1424039912.625576 2025/02/19 22:38:14 UTC Time
start
24V 2.8A right after start all 8
 resistance_vs_time_all_channels_all_time.pdftemperature_vs_time_all_channels_all_time.pdfresistance_vs_time_rise_time.pdfresistance_vs_time_fall_time.pdf 
  539   Tue Mar 11 10:43:57 2025 Xuesi MaUpdate  Continue investigation in the spikes
Pulsed ADC with a function generator
and find no spikes. Rules out ADC for causing
 20250310_171936.jpg 
  544   Mon Mar 31 15:41:56 2025 Xuesi MaUpdate  The result from AI Chassis bypass test
showed that the AI Chassis may be the problem.
There are no spikes from DAC's direct output.
  
  545   Tue Apr 1 11:47:08 2025 LiuUpdate     Thermal_state_decoder_update.pdf 
  547   Mon Apr 7 13:28:49 2025 Xuesi MaUpdate  Test 1: Adapter Board Connected to Filter
Board

  Setup:
AI Chassis is powered on. Signal is measured
 20250403_151946.jpgELOG_Spike_adapter_filter_on.png20250404_143624.jpgELOG_Spike_adapter_isolate.png20250407_105846.jpg 
  553   Tue Apr 15 11:13:43 2025 Xuesi MaUpdate  Test 4: AI Chassis ground isolation


 Setup: AI Chassis isolated
from the ground with readout directly connected
 20250414_120428.jpg20250414_120423.jpg20250411_163105.jpg 
  559   Tue Apr 22 12:08:46 2025 Xuesi MaUpdate  Test 7: Reconnect ribbon cables


 Setup: Reconnect all
the ribbon cables, and turned on the AI Chassis
 20250415_161755.jpg20250416_174640.jpg20250422_105614.jpg 
  572   Tue May 6 13:19:31 2025 Xuesi MaUpdate     resistance_vs_time_RV_rise_time_24.pdfresistance_vs_time_all_channels_all_time_RV.pdf 
  576   Tue May 13 12:35:01 2025 Xuesi MaUpdate     resistance_vs_voltage_all.pdfresistance_vs_voltage_overlay.pdfresistance_vs_time_all_channels_all_time_RV.pdf 
  579   Mon May 19 10:59:14 2025 Xuesi MaInfrastructure  

  Status Update


 Previous Status:
  
  583   Tue May 27 12:52:22 2025 Xuesi MaUpdate  Using the configuration in section 2.11.1
in the Sorensen installation and operation
manual (attached below), I'm able to remote
 6x 
  588   Tue Jun 3 13:08:47 2025 Xuesi MaUpdate  We currently have the parts for a DB9 connector
but need parts for a DB25 connector, where
did we get the parts for the DB9 connector?
 934.jpg933.jpg 
  589   Tue Jun 3 13:16:53 2025 Xuesi MaInfrastructure  
    Date and Time:
Around 3:50 PM on June 2, 2025
    Location and Temperature:
 928.jpg929.jpg931.jpg930.jpg932.jpg 
  591   Tue Jun 10 12:13:00 2025 Xuesi MaUpdate  
  By measuring the resistance of the
ladder, I obtained a graph of resistance
as a function of voltage.
 resistance_vs_voltage.pdfresistance_vs_voltage_element_5.pdfresistance_vs_time_all_channels_all_time_RV.pdf 
  594   Tue Jun 17 12:22:43 2025 Xuesi MaUpdate  



   
    
 11x 
  596   Tue Jun 24 11:50:15 2025 Xuesi MaUpdate  



   
    
 resistance_vs_time_all_channels_channel_switch.jpgresistance_vs_time_all_channels_channel_switch_one_cycle_before.jpgresistance_vs_time_all_channels_channel_switch_one_cycle_after.jpgresistance_vs_voltage.jpg 
ELOG V3.1.3-7933898