  59   Fri Mar 31 14:23:13 2023 PamellaUpdateGeneralClean and bake batch 11Today I bagged and tagged batch 11. I wiped
the some tools: Centering ring alum( 2 pieces),
reversible ratcheting, gasket removal (CF).
 4AC705B8-D906-47E3-86E4-49E4967910E7.jpeg 
  52   Fri Mar 17 19:46:39 2023 AidenSummaryGeneralClean and Bake batch 9Bagged and Tagged the reflector arms and bases
and placed them inside the clean room. Total
of 2 bags used. Cleaned and Baked parts in
 IMG-4208.jpgIMG-4209.jpg 
  51   Tue Mar 14 18:21:41 2023 AidenSummaryGeneralClean and Bake batch 8Starting off Peter and I refilled the deionized
water barrel.

Then Aiden Cleaned and Bake
the FROSTI arms and bases in liquinox for
  
  47   Wed Mar 8 19:29:00 2023 AidenSummaryGeneralClean and Bake batch 7Today gave another cleaning to the MDC gate
valve. It is still very dirty an will need
more cleaning. I also cleaned the other 3
 IMG_4180.jpgIMG_4182.jpg 
  38   Tue Feb 28 19:37:22 2023 AidenSummaryGeneralClean and Bake batch 5Bagged and Tagged batch 4 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4168.jpgIMG_4169.jpgIMG_4170.jpg 
  31   Tue Feb 21 17:51:04 2023 AidenSummaryGeneralClean and Bake batch 4Bagged and Tagged batch 3 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4148.jpgIMG_4147.jpg 
  30   Fri Feb 17 19:12:39 2023 AidenUpdateGeneralClean and Bake batch 3Bagged and Tagged batch 2 parts by placing
no more than two parts per ESD bag then taped
them with kapton tape and tagged them with
 IMG_4126.jpgIMG_4125.jpg 
  29   Mon Feb 13 18:57:53 2023 AidenSummaryGeneralClean and Bake batch 2Cleaned second batch of SS parts with liquinox
for 20 min. Then put in oven for 5 steps;
1. Ramp, 100 degC, 15 min 2. Const, 100 degC,
  
  146   Wed Jul 5 16:02:12 2023 AidenUpdateClean & BakeClean and Bake batch 14 BaggingBagged and Tagged the 2.75" copper gaskets
from Batch 14 and placed them into the clean
room on the work bench.
  
  72   Mon Apr 17 17:06:49 2023 AidenSummaryGeneralClean and Bake batch 11Cleaned the Viton O-Ring for the main chamber
in Liquinox for 10 minutes. Then put it in
the oven to back for;

1. Ramp to 100 degC
 IMG_4262.jpg 
  57   Fri Mar 24 13:36:17 2023 PamellaUpdateGeneralClean and Bake batch 10Today I bagged and tagged batch 10.
 I wiped
the RGA vacuum component for around 25 minutes
after that I bagged and tagged this part
 260AEB73-02D0-4635-93B3-B2EB3269FB84.jpeg59FD199A-A444-439A-8D51-C242B65BBECD.jpeg9A48A0EE-5EFE-409D-ACC0-17011F6F7EBF.jpeg950F85B7-D304-4724-AB3D-B606E422F1E3.jpeg 
  86   Fri Apr 28 19:39:19 2023 CaoSummaryGeneralClean and Bake Leybold TTR 91 Pirani Gauge



  
  42   Fri Mar 3 19:13:33 2023 AidenSummaryGeneralClean and Bake Batch 6Started to clean the dirtiest of the valves.
I could not finish but I definitely made
good progress on it. The MDC valve is very
 IMG_4173.jpgIMG_4174.jpg 
  279   Mon Nov 27 19:34:50 2023 AidenUpdateClean & BakeClean and Bake Batch 20 BaggingBagged and tagged bath 20 which included the
macor hardware and place it inside the clean
room on the table.
  
  272   Mon Nov 20 20:37:45 2023 AidenUpdateVACClean and Bake Batch 20[Aiden, Luis]
Started to clean and bake the
macor parts for the FROSTI reflector. Per
LIGO documentation cleaned the macor in liquinox
  
  237   Mon Oct 9 21:41:24 2023 AidenUpdateClean & BakeClean and Bake Batch 19Bagged and tagged the parts from batch 18.
Started the Copper batch that includes all
the gaskets needed to start the vacuum chamber
  
  233   Sat Oct 7 17:10:27 2023 AidenUpdateClean & BakeClean and Bake Batch 18Bagged and tagged the parts from Batch 17
and placed them in the clean room on the
optic table. Also started an aluminum batch
  
  232   Tue Oct 3 15:07:48 2023 AidenUpdateClean & BakeClean and Bake Batch 17Cleaned and baked all the stainless steel
parts in Batch 17. Check data base for more
details on this.
  
  227   Thu Sep 28 15:17:13 2023 AidenUpdateClean & BakeClean and Bake Batch 16Bagged and Tagged the parts from batch 15
and started baking batch 16 which includes
the 6" to 8" reducer.
  
  224   Tue Sep 12 15:31:31 2023 AidenUpdateClean & BakeClean and Bake Batch 15Cleaned and Baked the SS screws for the heater
mount. Check the Clean and Bake data base
on the website to get a precise list of the
 IMG_4647.jpg 
  126   Fri Jun 16 17:40:28 2023 AidenUpdateClean & BakeClean and Bake Batch 14Cleaned and Baked the new and 2.75" copper
gaskets for the vacuum system. Cleaned them
with liquinox in the ultra sonic washer for
 IMG_4441.jpgIMG_4440.jpg 
  121   Tue Jun 13 13:25:05 2023 AidenSummaryClean & BakeClean and Bake Batch 13Cleaned and Baked the new 1.33" and 2.75"
blanks for the vacuum system. Cleaned them
with liquinox in the ultra sonic washer for
  
  77   Mon Apr 24 17:38:45 2023 AidenSummaryGeneralClean and Bake Batch 12Today I Bagged and tagged the o-rings from
batch 11 and placed them inside the clean
room. I also cleaned batch 12 parts in liquinox
 IMG_4269.jpgIMG_4268.jpg 
  23   Tue Feb 7 17:27:30 2023 AidenPhysicsELOGClean and Bake Batch #1Cleaned SS parts with liquinox for 20 min.
Then put in oven for 5 steps;
1. Ramp, 100
degC, 15 min
2. Const, 100 degC, 30 min
3.
  
  356   Wed Mar 27 00:03:57 2024 PooyanUpdateComputersChimay relocation to Physics 1129 [Jon, Pooyan]

 Moved Chimay from
the server rack in Physics 1119 to a new
rack in Physics 1129. It is connected to
 Chima_front.jpgChimay_back.jpg 
  437   Mon Sep 9 14:27:36 2024 PooyanInfrastructureComputersChimay backup attemptOne ongoing work is to make all lab machines
automatically backed-up on Scribe on a daily
basis. The updates should be boatable and
  
  171   Mon Jul 24 16:19:29 2023 Shane, JonUpdateElectronicsChassis semi-assembled and movedBegan assembly on AA and AI chassis today,
moved them both to top work bench shelf (image
attached). They are delicate so please do
 IMG_8386.pdf 
  95   Tue May 9 20:55:12 2023 JonInfrastructureVACCalibrated Ar leak rateFor future reference, the calibrated Argon
source has a leak rate of 7.55E-8
atm cc/s, or equivalently 
 VTI-Calibrated-Ar-Leak.jpeg 
  353   Sun Mar 24 11:50:37 2024 AidenUpdateClean & BakeCal Tech FROSTI PartsBagged the FROSTI legs and feet after the
conclusion of the clean and bake. They are
double bagged and sitting in the flow bench.
  
  326   Tue Feb 13 13:02:41 2024 PooyanUpdateInterferometer SimulationsCacity sacn of Fabry-Perot Created a simple model of Fabry-Perot cavity
in SIS, and did a cavity scan. Total power
in the cavity, 00 mode, and HOMs is measured.
 IFOSim_update_2_13_24.pdf 
  402   Thu Jul 11 21:01:37 2024 JonInfrastructureGeneralCable tray installed in 1129Today I installed a 10' cable tray in 1129,
for permanently routing Ethernet lines to
the workstations. It is securely bolted to
 IMG_1395.pngIMG_1396.png 
  418   Tue Jul 30 07:42:47 2024 JonInfrastructureGeneralCable tray installed in 1119Yesterday I installed another 5' cable tray
in 1119, for permanently routing Ethernet
lines to the L-bench. It is securely bolted
 cable_tray_1119.jpg 
  44   Mon Mar 6 15:32:58 2023 JonInfrastructureGeneralCabinet installation completedJon, Cao, Peter
This morning Facilities delivered
and installed two new cabinets with sliding
 IMG_0088.jpgIMG_0089.jpg 
  303   Mon Jan 15 22:29:34 2024 JonInfrastructureGeneralCabinet installation & lab clean-up completed[Jon, Tyler, Aiden, Shane, Pooyan, Michael,
Cynthia, Luke]
On Wednesday, we completed long list
 1129.png1119.png 
  376   Fri Jun 14 13:32:13 2024 LiuUpdateScripts/ProgramsCOMSOL simulation on rectangular heater elements designI have been looking at the feasibility
of an alternative heater element design for
FROSTI that replaces the original ring-like
 6x 
  380   Fri Jun 21 11:47:30 2024 LiuUpdateScripts/ProgramsCOMSOL simulation on alternative straightened heater elements design In the previous post, we saw
that for the heater element design with straight
 6x 
  375   Mon Jun 10 14:52:38 2024 TylerUpdateFLIRCIT FROSTI Analysis Update[Tyler]


Upon further inspection, one
adjustment was made to the FROSTI profile
analysis: changing the transmission value
 FROSTI_HR_Temperature_Difference-7.png 
  675   Thu Jan 29 12:46:22 2026 Cece OchoaUpdate CE Cavity Design Update (4)Update for CE Cavity Arms + Modes 


https://docs.google.com/presentation/d/1-dXYylkAbNpHR4WVCx9Q8ryL_xGlH-JSSLXEUQg6b7Q/edit?usp=sharing
 
  
  586   Tue Jun 3 11:54:06 2025 Cece OchoaUpdate CE Cavity Design UpdateUpdate on the design for the CE Cavity Mirrors  CE_Arm_Cavity_.pdf 
  659   Thu Nov 6 12:39:43 2025 Cece OchoaUpdateELOGCE Cavity Design UpdateUpdated mode placements and ROC. No thermal
effects added yet.
 base_0_6_plot.pdfbase_0_7_plot.pdf 
  663   Thu Nov 20 13:03:58 2025 Cece OchoaUpdateELOGCE Cavity Design UpdateUpdate on grouping 0+8th Order Modes  11_20_update.pdf 
  683   Thu Feb 12 12:53:51 2026 Cece OchoaUpdateELOGCE Cavity Design UpdateUpdate on HOM placement w/ cavity locking.
Still verifying mode placement

RoC: 28340m
and 26874m
 2_12_short_update.pdf 
  Draft   Thu Mar 12 13:18:49 2026 Cece OchoaUpdateInterferometer SimulationsCE Cavity Design UpdateAnimation showing how modes shift in the CE
arm cavity for radius 27581m and mirror radius
of40cm as the laser powers up the 1.5 MW.
  
  702   Thu Apr 23 11:32:48 2026 Cece OchoaUpdateInterferometer SimulationsCE Cavity Design UpdateUpdate on CE Mirror RoC, simulation with FROSTI
and cavity locking

View Presentation
  
  394   Fri Jul 5 14:12:32 2024 LiuUpdateInterferometer SimulationsCE BS Mechanical ResonancesThe butterfly and drumhead mechanical modes
for the aLIGO BS were calculated in COMSOL.
The resonant frequencies for the two acoustic
 butterfly.pngdrumhead.png 
  585   Tue Jun 3 11:50:08 2025 PooyanUpdateCDSCDS updateThere are three major issues with the lab's
CDS system that should be addressed. They
are ordered from the highest priority to
  
  590   Tue Jun 10 12:11:14 2025 PooyanUpdateCDSCDS update
The MEDM models issue was fixed.
The issue was that building the c1msc model
alone was not enough and we had to re-build
  
  592   Wed Jun 11 16:19:37 2025 PooyanUpdateCDSCDS update
Fast channels recorded to .gwf frame
files

Had to add a DAQ Channels
block to the c1msc model for those channel
 Screenshot_20250611_154834.pngf3k.pdf 
  321   Tue Feb 13 01:26:30 2024 PeterUpdateInterferometer SimulationsCARM Power SimulationsCao's simulations of the circulating power
and gouy phase through a single arm cavity
of the interferometer have been reproduced.
 Scenario_3_CARM.pdfScenario_3_CARM_Gouy.pdf 
  199   Wed Aug 9 17:35:26 2023 ShaneUpdateCDSBinary output chassis finishedFinished the internal wiring for the binary
output chassis today, which completes its
assembly. Also secured ribbon cables and
 IMG_8685.jpegIMG_8686.jpeg 