ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
26
|
Fri Feb 10 16:34:45 2023 |
Huy Tuong Cao | Infrastructure | Clean & Bake | Nitrogen gas tank ready to use | Cao,
Today I fixed the final bit related
to the nitrogen gas tank, which is to apply
sealing tape to M-NPT connector of the hose |
|
3
|
Thu Jun 2 21:55:02 2022 |
Jon | Update | Cameras | FLIR Camera Setup | The new FLIR A70 infrared camera has arrived.
Tyler and I unpacked it in the lab yesterday.
In less than an hour, we succeeded in powering |
 |
4
|
Fri Jun 3 13:03:33 2022 |
Jon | Update | Cameras | FLIR Camera Setup | Summary
I have installed the
requisite software on chimay for interfacing
the FLIR A70 camera in Python. There are |
|
5
|
Mon Jun 6 17:11:48 2022 |
Jon | Update | Cameras | FLIR Camera Setup | Today I tested the Spinnaker/PySpin software
installations (detailed in ELOG
#4) with the FLIR camera connected to |
 |
6
|
Tue Jun 21 18:31:49 2022 |
Cassidy and Phoebe | Update | Cameras | IR Absorbing Screen and FLIR Camera Setup | Today we set up the IR absorbing screen and
the camera on the optical table, as well
as tested that the camera was functioning |
  |
9
|
Tue Jul 26 14:10:35 2022 |
Cassidy | Update | Cameras | Optical Post Replacement and Realignment | Today I replaced the 3" optical post that
the camera rests on with a 2" optical post
in order for the screen to correctly fill |
  |
58
|
Wed Mar 29 16:00:36 2023 |
Pamella | Update | Cameras | FLIR project |
Today Pamella and Tyler started work in
the updates for the FLIR project.
We trie
for the first time cover the mirrors with |
|
243
|
Mon Oct 23 11:28:05 2023 |
Tyler | Update | Cameras | FLIR Camera Code Updates | The past week I've been spending time going
through the FLIR code on gitlab. Initially,
it had appeared that our measurements with |
|
191
|
Thu Aug 3 18:03:42 2023 |
Shane, Jon | Update | CDS | Anti-Aliasing chassis complete | We finished installing the internal power
supply cables in the anti-aliasing chassis
today, which concludes its assembly. Work |
|
193
|
Mon Aug 7 13:58:46 2023 |
shane | Update | CDS | internal power supply cables done for AI chassis | Finished assembling and installing the aLigo
chassis internal power supply cables in the
anti-imaging chassis today. Tested for continuity |
|
197
|
Tue Aug 8 17:03:22 2023 |
Shane, Jon | Update | CDS | Binary input chassis finished | Finished assembly of the binary input chassis
today, including DC on/off switch and LED
installation. external cable assemblies still |
|
199
|
Wed Aug 9 17:35:26 2023 |
Shane | Update | CDS | Binary output chassis finished | Finished the internal wiring for the binary
output chassis today, which completes its
assembly. Also secured ribbon cables and |
 |
210
|
Wed Aug 16 16:55:40 2023 |
Shane, Jon | Update | CDS | external power supply cables finished | All four external power supply cables for
the CyMAC chassis are now assembled. Using
them now to test if chassis power up correctly. |
|
211
|
Wed Aug 16 17:17:02 2023 |
Shane, Jon | Update | CDS | Binary input chassis powering correctly | Binary input chassis passed power-on test,
and is lighting up as expected. Binary output
chassis also successfully powered on. AA |
|
225
|
Thu Sep 14 17:05:38 2023 |
Shane, Jon | Update | CDS | Timing chassis setup and testing | Tested the setup today for the timing chassis
(intended to provide the timing reference
for the CyMAC). Was able to read the correct |
|
231
|
Fri Sep 29 17:27:30 2023 |
Shane, Jon | Update | CDS | Timing chassis assembly progress (CyMAC) | Worked on timing chassis assembly today for
the CyMAC, settled on layout (see attachment
1). Frequency synthesizer and frequency divider |
 |
236
|
Mon Oct 9 16:59:21 2023 |
Shane, Jon | Update | CDS | timing chassis power cable and AI chassis testing for CyMAC |
[Shane, Jon]
Today's
CyMAC work:
Finished assembling
external power supply cable for the timing |
|
244
|
Mon Oct 23 18:02:23 2023 |
Shane, Jon | Update | CDS | Timing chassis assembly complete | Concluded assembly of timing chassis for CyMAC
today; see attachment 1 for interior set
up of chassis. Installed front and rear panels, |
  |
247
|
Fri Oct 27 15:28:30 2023 |
Shane | Update | CDS | AA and AI chassis for CyMAC powered on and functional | CyMAC updates: Switched out the faulty power
regulator boards in the Anti-Aliasing and
Anti-Imaging chassis. Both chassis are now |
 |
250
|
Mon Oct 30 18:15:13 2023 |
Shane | Update | CDS | CyMAC chassis mounted and progress on power connections | All CyMAC chassis mounted in electronics rack
today, and shelf for monitor also mounted.
Images attached. Assembled grounding cables |
   |
252
|
Wed Nov 1 18:24:01 2023 |
Shane | Update | CDS | CyMAC Power connections made |
Finished
power connections today for the CyMAC chassis.
Images attached. Had to switch the shrink |
 |
254
|
Thu Nov 2 17:14:36 2023 |
Shane, Jon | Update | CDS | CyMAC set up permanentized |
CyMAC connections
have been finalized and made permanent. Also
tested voltages, which are all looking good. |
    |
265
|
Mon Nov 13 11:23:54 2023 |
Jon | Update | CDS | CyMAC testing | [Jon, Shane, Luis]
My repair of the internal ribbon
connecting the ADC to the adapter board resolved |
|
276
|
Wed Nov 22 15:46:50 2023 |
Shane | Update | CDS | DB25 signal connections for FROSTI heaters |
[Shane,
Jon]
Installed new DC smart switch in electronics |
  |
277
|
Thu Nov 23 12:34:44 2023 |
Jon | Update | CDS | DB25 signal connections for FROSTI heaters | Update: I was able to put the
FROSTI power controller on the lab network.
It is connected to the switch in the top |
|
285
|
Mon Dec 4 21:27:53 2023 |
Shane | Update | CDS | ADC-DAC loopback test results | Here are the test results from today's ADC-DAC
loopback tests. Channels 14 and 15 were the
only ones behaving abnormally. Not sure what |
|
290
|
Mon Dec 11 12:58:57 2023 |
Shane, Luis | Update | CDS | DAC-ADC loopback test debugging | [Luis, Shane]
Working on debugging last
week's weird results for the ADC-DAC loopback
test for channels 14 and 15. With DAC output |
|
312
|
Wed Jan 31 14:37:26 2024 |
Shane | Summary | CDS | path directions for CyMAC model and parts library | Path to cds parts library in Matlab simulink:
/usr/share/advligorts/src/src/epics/simLink.
File name CDS_PARTS.mdl
Path to user models: |
|
313
|
Fri Feb 2 16:56:56 2024 |
Jon | Update | CDS | RTS model implemented for FROSTI RTD readouts | Summary
Today I finished implementing
an RTS model to read out the integrated FROSTI
RTDs (temperature sensors) via the CyMAC. |
|
329
|
Mon Feb 19 14:40:21 2024 |
Shane | Update | CDS | MEDM screen for FROSTI temp readouts | Here's the latest draft of the MEDM screen
for the FROSTI heating elements' temperature
readouts. Note that the MEDM screen isn't |
 |
337
|
Fri Feb 23 15:01:48 2024 |
Shane | Update | CDS | Latest draft of MEDM screen for FROSTI readouts | Here's the latest draft of the MEDM screen
for the FrOSTI temp and power readouts. Also,
debugged the text readout boxes so they're |
 |
346
|
Thu Feb 29 17:16:48 2024 |
Shane | Update | CDS | MEDM screen for FROSTI T/P readouts | Here's the latest draft of the MEDM screen
for the FROSTI temp and power readouts, now
with a button linking to the c1msc file display. |
|
365
|
Tue May 7 20:34:31 2024 |
shane | Update | CDS | frosti MEDM screen update | [Luis, Shane]
Here is the updated MEDM screen,
with new orientation and updated labeling
to reflect the actual positions of the heater |
|
398
|
Mon Jul 8 17:01:45 2024 |
Shane | Update | CDS | New CyMAC internal layout | [Jon, Shane]
Internal layout of CyMAC has
been updated (labeled image attached) to
accommodate the replacement of the two ribbon |
|
399
|
Tue Jul 9 18:19:50 2024 |
Shane | Update | CDS | ADC-DAC loopback testing and IOLAN installation | [Shane, Jon]
Finished ADC-DAC loopback
testing today (see attached xlsx file or
access directly here). |
  |
410
|
Tue Jul 16 18:43:07 2024 |
Shane | Update | CDS | ADC-DAC loopback testing and IOLAN installation |
UPDATE:
Follow up ADC-DAC loopback testing
now complete, matching all the ADC channels
to a single DAC channel, and then matching |
|
419
|
Fri Aug 2 13:50:22 2024 |
Shane | Update | CDS | Serial Comm. Test (Agilent Turbo Pump) | Did a brief communication test with the agilent
turbo pump today, to see if we could get
serial communications up and running for |
|
434
|
Tue Sep 3 18:24:17 2024 |
Tyler | Update | CDS | Cymac Timing Chassis Issue | [Tyler, Jon]
The timing chassis used
for the cymac has been shut off due to an
unknown issue causing its supplied current |
|
Draft
|
Tue Oct 1 19:41:23 2024 |
Shane | Update | CDS | CyMAC Timing Chassis Issue | [Shane, Luis]
Summary of the issue we've
been having with the timing chassis: when
we connect only the Valon 5015 to power, |
  |
461
|
Thu Oct 17 13:24:23 2024 |
Shane | Update | CDS | Timing Chassis issue identified |
[Ma,
Luis, Shane]
Working theory for the
timing chassis issues had been that the 1A |
 |
465
|
Fri Oct 25 10:56:30 2024 |
Shane | Update | CDS | Timing Chassis fixed and reinstalled |
[Ma, Shane]
We
replaced the 1A breaker in the timing chassis
today with a 4A one, and tested that all |
|
473
|
Thu Nov 14 11:58:05 2024 |
Shane | Update | CDS | Turbo pump connection troubleshooting | Attempted connection to the TV551 turbo pump
through Varian/Agilent's software on spica.
Successful connection established, and we |
|
484
|
Wed Dec 4 16:01:23 2024 |
Shane | Update | CDS | Vac serial interfacing troubleshooting update | Update on the issue with serial interfacing
for the TV 551 turbo pump: Tried a new test
today, to see if the commands being sent |
|
505
|
Tue Jan 28 13:30:46 2025 |
shane | Update | CDS | Serial comms testing update | Attempted to communicate with the smaller
vac pump (TwissTor 74) via Agilent software
today. Was able to communicate with the pump |
|
518
|
Wed Feb 19 13:44:48 2025 |
Shane | Update | CDS | Vac serial interfacing update |
[Jon, Shane]
Debugging update for vac system serial
communications: we were able to successfully |
|
527
|
Thu Feb 27 18:22:21 2025 |
Shane | Update | CDS | Ongoing work in server rack and desk area (1119) | As part of the vacuum communications debugging
process, there is ongoing work in the server
rack and desk area in 1119. Please be careful |
|
532
|
Tue Mar 4 10:47:03 2025 |
Shane | Update | CDS | Vac system pinouts | Attached here are the pinouts, as we currently
know them, for the vacuum system. The three
items focused on here are the Agilent TwissTorr |
 |
533
|
Wed Mar 5 12:16:28 2025 |
Shane | Update | CDS | Vac system communications update |
[Shane, Jon]
Update on the serial interfacing
with the vacuum system: both turbo pumps |
|
534
|
Wed Mar 5 18:13:20 2025 |
Shane | Update | CDS | vac system comms |
[Shane, Jon]
Update on the serial interfacing with
the Inficon VGC503 pressure gauge: We began |
|
535
|
Mon Mar 10 17:03:52 2025 |
Shane | Update | CDS | Pressure Gauge successful connect | Vac system serial interfacing update: the
pressure gauge is now able to communicate
successfully through the code. It's been |
|