ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 11 of 15  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Categorydown Subject Text Attachments
  375   Mon Jun 10 14:52:38 2024 TylerUpdateFLIRCIT FROSTI Analysis Update[Tyler]


Upon further inspection, one
adjustment was made to the FROSTI profile
analysis: changing the transmission value
 FROSTI_HR_Temperature_Difference-7.png 
  396   Mon Jul 8 10:39:14 2024 XuejunUpdateFLIRAverage Temperature Profile After taking data for each of the individual
heater elements, I imported them into python
and overlayed them to produce an average
 Average-Temperature-Profile.pdf 
  552   Tue Apr 15 11:09:37 2025 LiuUpdateFLIRTest Mass Thermal State Decoder Update with robustness study   Update.pdfUpdate.pdf 
  14   Wed Dec 14 18:34:33 2022 JonConfigurationElectronicsAdapter for 532 nm laser power supplyI installed an EU-to-US plug adapter for the
532nm laser's 9V power supply. I then re-measured
the laser's power with the correct supply
 laser_power.png 
  128   Tue Jun 20 17:28:23 2023 PamellaUpdateElectronicsHeater system parts - Wiped [Pamella]

    
Heating system 


   Wiping the heater system parts.

    04:37 pm: Started wiping the electronic
 IMG_7696.jpg 
  171   Mon Jul 24 16:19:29 2023 Shane, JonUpdateElectronicsChassis semi-assembled and movedBegan assembly on AA and AI chassis today,
moved them both to top work bench shelf (image
attached). They are delicate so please do
 IMG_8386.pdf 
  172   Tue Jul 25 15:35:14 2023 ShaneUpdateElectronicsMore chassis movedFinished basic assembly of binary input and
output chassis today, and moved one to top
shelf of work bench. The other is in corner
 IMG_8409.HEIC 
  176   Thu Jul 27 14:46:55 2023 Shane, JonUpdateElectronicsAA chassis DC on/off switch assembledMade the first DC on/off switch assembly today
and installed in anti-aliasing chassis. Second
switch assembly to be completed later.
  
  182   Mon Jul 31 12:39:01 2023 ShaneUpdateElectronicsLED cable assemblies installed Today I put together the two LED cable assemblies
for the CyMAC and mounted them in the anti-aliasing
and anti-imaging chassis.
 IMG_8514.jpegIMG_8516.jpeg 
  235   Mon Oct 9 11:29:37 2023 TylerUpdateElectronicsPSD/CSD Plot UpdatesContinuing from Sophia's SURF Project this
summer: Plotting the Power-Spectral Densities
(PSDs) and Cross-Spectral Densities of two
 Screenshot_2023-10-09_at_11.20.25_AM.pngwelch_csd-2.png 
  255   Mon Nov 6 11:29:24 2023 TylerUpdateElectronicsPreliminary RTD Calculations, RP Software Update
Preliminary RTD calculations are shown
below, given an input of 10 V and desiring
a few mA of current. It looks like R_ref
 cvt.pngVvC.pngIMG_7471.jpg 
  271   Mon Nov 20 10:10:50 2023 TylerConfigurationElectronicsRTD Logic/Schematic Diagrams
Below are a basic diagram of what the
RTD measurement circuit logically looks like
and an example schematic of the actual wiring.
 FIN_RTD_circuit.pngSample_Circuit_Schematic.png 
  298   Fri Dec 29 16:02:27 2023 JonConfigurationElectronicsRTD Readout ChassisThe custom front and rear panels for the
RTD readout chassis arrived last Friday.
I installed them in the chassis frame to
 front.jpegrear.jpegoverhead.jpeg 
  300   Tue Jan 9 12:08:59 2024 TylerConfigurationElectronicsRTD Readout Chassis Update
Below is the current state of the RTD
readout chassis wiring. Initial continuity
tests seem good, will run through one more
 IMG_8105.jpg 
  305   Tue Jan 16 12:20:21 2024 TylerConfigurationElectronicsRTD Readout Chassis Update 2
I performed another continuity test on
the RTD chassis wiring, and everything seems
to be set up correctly. The chassis should
 IMG_8146.jpgIMG_8147.jpg 
  310   Tue Jan 23 12:17:41 2024 TylerUpdateElectronicsRTD Chassis
After updating the wiring in the RTD
Chassis, a signal is now seen at each ADC
input. However, there seems to be a discrepancy
 rtd_updated_circuitry.jpg 
  311   Tue Jan 30 11:36:19 2024 TylerUpdateElectronicsRTD Chassis



  
  364   Thu May 2 22:43:36 2024 TylerUpdateElectronicsRTD Readout Chassis Redesign[Tyler, Jon]


Today the FROSTI RTD
readout chassis underwent a redesign:



Instead of the original ratiometric
 IMG_9013.jpg 
  466   Tue Oct 29 16:37:35 2024 TylerUpdateElectronicsRed Pitaya OS Update The Red Pitaya ecosystem has been upgraded
to OS 2.00-35, with a key feature
being greater freedom in adjusting the sampling
  
  470   Wed Nov 13 14:03:32 2024 TylerUpdateElectronicsRIN Update[Tyler]


We've added two low-pass filters
in hopes of reducing any potential aliasing
that may be introducing additional noise
 IMG_0463.jpgCH0_CH1_ASDs.pdf 
  477   Wed Nov 20 12:59:37 2024 TylerUpdateElectronicsRIN UpdateI went ahead and compared the noise spectrum
of the ADC to those of the photodetectors
with the FROSTI on and off. As discussed
 ASD_plots.pdf 
  479   Wed Nov 27 13:48:01 2024 TylerUpdateElectronicsRIN Update[Tyler]

 
I downgraded the Red Pitaya
back to OS 2.00-18 due to runtime errors
during measurement. Once I did this, the
 New_ASD_plots.pdf 
  486   Wed Dec 11 13:39:30 2024 TylerUpdateElectronicsRIN Update 12/11/2024[Tyler]


Attached below are updated
ASD plots for the FROSTI RIN measurements.
The parameters set for this are the following:
 Updated_ASD_plots.pdf 
  537   Mon Mar 10 21:32:29 2025 NathanPhysicsElectronicsBeam Profiling and PBS MeasurementsBeam wasn't diverging, however maybe was about
to diverge when measurements stopped? Will
discuss the PBS measurements and how the
 Beam_Profiling_2_20_(2).pdfbeamprfl.pngthumbnail_(6).jfif 
  578   Thu May 15 12:03:41 2025 Xuesi MaInfrastructureElectronicsNoticeAll Sorensen power supplies are turned
off. The Cymac system is down (All Chassis
are down)
  
  595   Tue Jun 17 12:46:47 2025 TylerUpdateElectronicsCyMAC ADC NoiseBelow are results from power spectra measurements
of the CyMAC ADC, computed form 30 hours
of time series data, compared to the performance
 cymac_v_rp_csds.pdfchi_sq_cymac_v_rp.pdf 
  12   Mon Nov 28 18:10:23 2022 shaneUpdateELOGParticle counts in the clean roomParticle count stats for the clean room Nov
28, 2022: 
Took 10 sample runs in each of
5 regions in the clean room (5 runs per region
 clean_room_particle_counts_11_28_-_Sheet1.pdf 
  15   Wed Jan 18 22:06:05 2023 JulianUpdateELOGCleanroom UpdateI wiped down all the inner walls of the cleanroom
using alcohol wipes, as per Cao's instruction.
  
  23   Tue Feb 7 17:27:30 2023 AidenPhysicsELOGClean and Bake Batch #1Cleaned SS parts with liquinox for 20 min.
Then put in oven for 5 steps;
1. Ramp, 100
degC, 15 min
2. Const, 100 degC, 30 min
3.
  
  458   Tue Oct 15 15:27:38 2024 Xuesi MaUpdateELOGTiming Chassis Update
I conducted separate tests on the '5015'
and '3010a'. When powered individually, the
'5015' outputs a signal at 33.55 MHz with
 12x 
  528   Tue Mar 4 03:05:42 2025 Xuesi MaUpdateELOGLOG1424564097.243212 2025/02/26 00:14:39 UTC Time
start
12V 2A right after start all 8 elements
  
  659   Thu Nov 6 12:39:43 2025 Cece OchoaUpdateELOGCE Cavity Design UpdateUpdated mode placements and ROC. No thermal
effects added yet.
 base_0_6_plot.pdfbase_0_7_plot.pdf 
  663   Thu Nov 20 13:03:58 2025 Cece OchoaUpdateELOGCE Cavity Design UpdateUpdate on grouping 0+8th Order Modes  11_20_update.pdf 
  683   Thu Feb 12 12:53:51 2026 Cece OchoaUpdateELOGCE Cavity Design UpdateUpdate on HOM placement w/ cavity locking.
Still verifying mode placement

RoC: 28340m
and 26874m
 2_12_short_update.pdf 
  142   Mon Jul 3 16:26:21 2023 CaoInfrastructureDAQAccess and control Red Pitaya remotely and run it on local machine[Cao]


To access and control the Red
Pitaya using Python locally on a machine
within the local network, one should follow
  
  351   Thu Mar 21 16:56:42 2024 TylerUpdateDAQRTD Parameter Calibration[Jon,Tyler]

 We noticed that the RTD
temperature readings given on the Cymac were
off, and traced the issue to miscalibration
 RTD_Calib-2.pngIMG_8569.jpg 
  354   Mon Mar 25 10:55:33 2024 TylerUpdateDAQRTD Parameter CalibrationRefitted RTD calibration, neglecting quadratic
term:

       R_0
(ohm)   Alpha (1/C)
 RTD_Calib_nobeta.png 
  355   Tue Mar 26 13:51:56 2024 TylerUpdateDAQRTD Parameter Calibration Another re-fit, but this time the quadratic
coefficient (beta) is set to 1.003e-6:


     R_0 (ohm)   Alpha
 Screenshot_2024-03-26_at_1.23.27_PM.png 
  416   Mon Jul 29 13:39:16 2024 TylerUpdateDAQRTD Parameter Calibration[Tyler]


Using the data taken during
the FROSTI testing at Caltech, I attempted
to find a better calibration of the RTD sensors,
 RTD_Recal_params.pngRTD_recal_plots_fin.png 
  13   Wed Dec 14 17:35:41 2022 JonInfrastructureComputersWindows LaptopI set up the new Windows 10 laptop (pictured
below), which arrived yesterday. This laptop
is intended to be used for running lightweight
 laptop.png 
  24   Tue Feb 7 17:44:17 2023 JonInfrastructureComputersWorkstation 1 (ws1) set upThe Linux workstation (ws1) that used to sit
on the old workbench has been mounted on
the new electronics bench and is now ready
 ws1.jpg 
  40   Wed Mar 1 21:50:46 2023 JonInfrastructureComputersWorkstation 2 (ws2) mounted on cleanroom cartThe Linux workstation (ws2) that used to
sit on the blue workbench (now inside the
cleanroom) has been mounted on a mobile cart,
 ws2_cart-1.jpegws2_cart-2.jpeg 
  56   Fri Mar 24 07:14:38 2023 JonInfrastructureComputersWorkstation 2 (ws2) mounted on cleanroom cartThe ws2 cart has been thoroughly wiped down
with IPA wipes and moved inside the cleanroom.
I have reconnected it to power and Ethernet
  
  98   Sun May 14 15:50:48 2023 CaoInfrastructureComputersHigh resolution display of logrus machine[Cao]

 
The display resolution of the
logrus has been 1064x768 and has been the
only option, which is not great. While remote
  
  339   Sat Feb 24 08:53:38 2024 JonInfrastructureComputersMatlab upgraded to 2023b on ChimayI upgraded Matlab on chimay to the latest
stable release, 2023b. From some quick tests,
it appears to be in working order. Let me
  
  356   Wed Mar 27 00:03:57 2024 PooyanUpdateComputersChimay relocation to Physics 1129 [Jon, Pooyan]

 Moved Chimay from
the server rack in Physics 1119 to a new
rack in Physics 1129. It is connected to
 Chima_front.jpgChimay_back.jpg 
  379   Thu Jun 20 18:01:11 2024 JonInfrastructureComputersNew workstation ws3 in 1129I have repurposed a spare Intel NUC to serve
as the first of two planned workstations
in 1129. Today I set it up with a fresh installation
  
  382   Mon Jun 24 21:38:25 2024 PooyanInfrastructureComputersComputer server changes in 1119 and 1129[Jon, Pooyan, Tyler]
 
A few computer machine changes have
 IMG_6889.jpgIMG_6890.jpg 
  385   Wed Jun 26 15:33:41 2024 JonInfrastructureComputersNew workstation ws3 in 1129
Set-up of the first CDS workstation for
1129, ws3, is complete and the machine is
ready for use. The login credentials are
 IMG_1368.jpg 
  407   Mon Jul 15 14:49:06 2024 PooyanUpdateComputersSynology NAS server setupInstalled a Synology NAS server (Synology
RackStation RS1221) in lab room 1129, with
host name “scribe” and ip “192.168.1.17”.
  
ELOG V3.1.3-7933898