Entry  Tue Feb 28 19:31:05 2023, Peter, Update, VLC Electronics, 532 M2 Measurements X_width_and_Y_width.png
Took M2 measurements today. Configuration: Lens 1 (f = 50mm) at 0mm. Lens 2 (f = 150mm) at 200mm, camera at 350mm. The laser beam was being moved in -z
direction on track (so further away from the first lens). Quick data shown in the sheets plot. Not a real fit. I was trying to see where the beam waist
was if there even was one. Seems that it is much further than we have room for on the track. Will need to come back and take more data. 

I suggest maybe
Entry  Tue Feb 28 19:33:51 2023, Peter, Update, , 532 M2 Measurements 
Y axis of plot in units of micrometers. X axis in units of millimeters. 
Entry  Thu Mar 9 12:03:59 2023, Peter, Update, VLC Electronics, 532 M2 Measurements OmegaY_M2_Fit_3.pngOmegaX_M2_Fit_3.pngoptical_setup.jpg
Took more M2 Data today. Picture of the optical set up is shown below. lens1 f = 100mm, lens2 f = 50mm, lens3 f = 150mm. There was a nice converging/diverging
beam profile, and the beam waist was able to be read by the camera. I took as much data as I could before clipping loss. The M2 value is quite high. 
Entry  Fri Mar 10 12:08:09 2023, Peter, Update, VLC Electronics, 532 M2 Measurements OmegaX_M2_Fit_4.pngOmegaY_M2_Fit_4.png
Took more M2 laser data today. The configuration is the same as before except now the beam camera is the only component moving. Pictures can be seen below.
The beam shape in x and y is very consistent with low error. However, the M2 value is still a bit high.
Entry  Tue Apr 4 09:39:58 2023, Peter, Update, VLC Electronics, 532 M2 Measurements OmegaY_M2_Fit_8.pdfOmegaX_M2_Fit_8.pdfM2_Measurements_Set_Up.svgBeam_Data_8_3lens.txt
Final M squared measurements were taken Wednesday, 3/29/23 by Peter and Ryan Hinosawa. 5 separate sets of data were taken, and upon discussion, we declared
the plots shown below in attachment 1 and 2 as the final plots of our M squared measurements.

The optical design of the M squared measurement process
is given in attachment 3. The laser and three lenses shown below are mounted on the optical table. The track is placed behind the third lens, and the camera
Entry  Fri Sep 29 11:53:54 2023, Shane, Update, Cleanroom, 5 zone particle count measurement in cleanroom  23.png23.png
Today's 5 zone measurement of cleanroom particulate concentration is attached
Entry  Fri Nov 17 14:06:01 2023, Shane, Update, Cleanroom, 5 zone particle count 23.png
Here's today's 5 zone particle count measurement for the cleanroom. Zone 5 (closest to back wall by fire cabinet) is still above the limit for the larger
size ranges; everything else is in good shape and roughly 10 times under the limit. Not sure why zone 5 is still so dirty (maybe some of the electronics
being stored in bags/bins on the upper shelf of the desk aren't clean?) but will focus cleaning efforts on this zone next time. 
Entry  Thu Nov 9 19:06:46 2023, shane, Update, Cleanroom, 5 zone cleanroom measurement 23.jpeg
Here's today's five zone measurement, taken ~5 hours after the cleaning. Zone 5 (closest to fire cabinet and back wall) is a bit over the limit in all size
ranges (about 1500 particles in 1.0u size range over), and zone 2 is slightly over the limit in the 1.0u range, but everything else is under the requirement.
Entry  Fri Feb 2 19:08:20 2024, Aiden, Update, VAC, 1st Hot Element RGA Scan bake10_240202_Elements_ArC.pngbake10_240202_Elements_ArO.png
Here are the measurements for the RGA scan of the elements while on at around 160C. The pressure of the chamber during the test was 4.12 e-8 torr.
Entry  Tue Nov 21 14:47:24 2023, Tyler, Update, Lore, 1129 Workbench Assembly Update 1 IMG_7569.jpgIMG_7568.jpg

[Tyler, Shane, Mohak, Cynthia, Luke, Michael, Luis]


Started assembly of the workbench equipment today. We completed the stools, and have constructed the frames of each workbench. All that needs to
be added are the tabletops and the top shelves, which will be done on Monday.
Entry  Mon Nov 27 14:22:30 2023, Tyler, Update, Lore, 1129 Assembly Update IMG_7669.jpgIMG_7668.jpg
[Tyler, Michael, Luke, Cynthia]


The tabletops have been attached to the workbench frames. Unfortunately, one of the tabletops came out of the box
with a large scratch and small dent in the middle. One of the electric top shelves is ready to be attached to the undamaged table, but the other is yet
to be opened. Assembly will be completed Wednesday morning.
Entry  Fri Apr 21 15:21:18 2023, Pamella, Update, FLIR,  AcquisitionImage(Apr-21-2023_14_26).jpg
     FLIR project updates

    
 01:50 pm: Starting test position 34 mm distance to black wall. 
  Parameters : 0.100 A, 1.5 V and
the temperature inside the mirrors 40°C. 
 2:09 pm : Finished the test and figured out this position it is too far the black wall so now we change
for more close position. 




   2:17 pm:  Starting test in another position: 10 mm distance to the black wall( this measurement
Entry  Mon Oct 30 11:03:56 2023, Tyler, Update, Scripts/Programs,  Screenshot_2023-10-23_at_12.39.05_PM.png

FLIR: After some adjustments, the plot generated from the FLIR measurements look much more symmetric (see attachment). There are more included grid
points, which smooths out the curve as compared to last week. 


Red Pitaya: It looks like a new OS update was released for the RP, which includes
a new Python API (was previously only available in C). I'm going to try and update the one we have currently running in lab.
Entry  Mon Jan 8 20:24:53 2024, Aiden, Update, General,  IMG_4888.jpgIMG_4886.jpgIMG_4887.jpg
[Jon, Aiden]

Installed the heater elements into their fixture and prepped the cables by twisting the wires into pairs. We also installed the pins
onto the wires and placed them into the peek DB 25 connector. The installation tool we had did not fit the pin size we had so the pins needed to be installed
by hand by opening the connector and holding them in place. In the future we will need to make sure we twist the wires together, group them, and then splice
Entry  Tue Jan 16 16:11:41 2024, Aiden, Update, VAC,  bake10_240116_Elements_ArO.pngbake10_240116_Elements_ArC.png
[Aiden,Luis]

Below is the data for the most recent bake. I believe the chamber is cleaner than it is actually showing as the RGA data was still getting
lower while the data was being taken. I will take the data again tomorrow just in case. Still, the data shows that the chamber is basically as clean as
it was before bake 10 and this means further power testing can proceed.

Helium leak tested the chamber again today to check if the sealant changed
Entry  Mon Jul 1 11:45:45 2024, Sid, Update, Interferometer Simulations,  
Progress update: Most of last week was spent getting set up with SIS, and learning how to do basic simulations. The goal for this week is to begin reproducing
the methodology from T2000338. I have begun with studying perturbations to mirror curvature and position in a simple FP cavity, but thus far have been
unable to get the same results.
Entry  Tue Aug 6 13:07:07 2024, Xuejun, Update, Interferometer Simulations,  Thermal_model_image.pnggenerated_irradiance_profile.png
[Xuejun]

 The width and location of the measured in-air change in temperature profile has been determined to be 0.045m and 0.137m respectively. Subsequently,
a fake irradiance profile was able to be generated that best resembled what the actual irradiance profile could be using this information for testing in
COMSOL. The generated irradiance profile that output the most similar change in temperature profile as the measured in-air profile has been included as
Entry  Wed Nov 13 14:06:00 2024, Luke , Update, General,  