Mon Apr 3 17:04:05 2023 |
Aiden | Summary | General | IDP Scroll Pump Assembly | Aiden installed the isolation valve and the
exhaust silencer kits on the IDP-3 Scroll
pump. The entire assembly still needs to |
|
69
|
Wed Apr 12 10:53:02 2023 |
Aiden | Summary | General | Valve Cleaning | Bagged and Tagged the parts from batch 10
and placed them inside the clean room.
Then
cleaned the last gate valve in liquinox for |
|
72
|
Mon Apr 17 17:06:49 2023 |
Aiden | Summary | General | Clean and Bake batch 11 | Cleaned the Viton O-Ring for the main chamber
in Liquinox for 10 minutes. Then put it in
the oven to back for;
1. Ramp to 100 degC |
|
77
|
Mon Apr 24 17:38:45 2023 |
Aiden | Summary | General | Clean and Bake Batch 12 | Today I Bagged and tagged the o-rings from
batch 11 and placed them inside the clean
room. I also cleaned batch 12 parts in liquinox |
|
80
|
Thu Apr 27 09:48:34 2023 |
Aiden | Summary | General | Batch 12 Bagging | I took batch 12 out of the oven and put them
in a bag and placed the bag inside the clean
room in the first large stainless steel container.
I |
|
86
|
Fri Apr 28 19:39:19 2023 |
Cao | Summary | General | Clean and Bake Leybold TTR 91 Pirani Gauge |
|
|
111
|
Wed May 31 16:18:41 2023 |
Aiden | Summary | General | Mock FROSTI | Finished assembly on the Mock FROSTI so it
is ready for the fit test at LIGO lab. |
|
121
|
Tue Jun 13 13:25:05 2023 |
Aiden | Summary | Clean & Bake | Clean and Bake Batch 13 | Cleaned and Baked the new 1.33" and 2.75"
blanks for the vacuum system. Cleaned them
with liquinox in the ultra sonic washer for |
|
148
|
Thu Jul 6 16:16:03 2023 |
Aiden | Summary | VAC | Vacuum Chamber Baking Update |
Pressure Measured Before Removing Gauge
2.31 E-7 Torr.
Went in and turned
on the heating tape in increments of 30 degC |
|
291
|
Mon Dec 11 16:20:17 2023 |
Jon | Summary | TCS | FROSTI Assembly Procedure | Below is the procedure we will follow to
assemble the FROSTI prototype.
Install SS guide rods and |
|
312
|
Wed Jan 31 14:37:26 2024 |
Shane | Summary | CDS | path directions for CyMAC model and parts library | Path to cds parts library in Matlab simulink:
/usr/share/advligorts/src/src/epics/simLink.
File name CDS_PARTS.mdl
Path to user models: |
|
472
|
Thu Nov 14 10:46:20 2024 |
Luke | Summary | Cleanroom | Cleanroom cleaning |
[Luke, Luis, Michael]
cleaning cleanroom and particle count |
|
23
|
Tue Feb 7 17:27:30 2023 |
Aiden | Physics | ELOG | Clean and Bake Batch #1 | Cleaned SS parts with liquinox for 20 min.
Then put in oven for 5 steps;
1. Ramp, 100
degC, 15 min
2. Const, 100 degC, 30 min
3. |
|
70
|
Wed Apr 12 16:13:19 2023 |
Cao | Physics | VAC | Vacuum prep and installation | Aiden, Pamella, Peter, Shane, Cao
Today
we started vacuum chamber assembly work
10:16 am: Particle count measurement of clean |
|
81
|
Thu Apr 27 16:23:44 2023 |
Cao, Pamella and Julian | Physics | VAC | Installing vacuum system (cont.) |
[Pamella, Cao and Julian, Shane]
Particles account
10:37 am: Starting the particles account |
|
82
|
Thu Apr 27 21:43:07 2023 |
Jon | Physics | VAC | Grounding vacuum system | This afternoon I made up a green 10 AWG
grounding cable and connected it to the vacuum
system. |
|
84
|
Fri Apr 28 18:16:57 2023 |
Cao | Physics | VAC | Grounding vacuum system |
|
|
85
|
Fri Apr 28 19:00:13 2023 |
Cao | Physics | VAC | Tighten CF ports on vacuum chamber | [Cao]
After Jon's comment yesterday
that some of the connection did not seem
to have good metal-metal contact, in particular |
|
87
|
Mon May 1 17:10:25 2023 |
Julian, Cao | Physics | VAC | Installing Pirani gauge and RGA probe onto to vacuum chamber | [Julian, Cao]
03:00 pm: Particle
count
: Zone 3
|
|
90
|
Tue May 2 17:03:14 2023 |
Jon, Cao | Physics | VAC | First pump-down test of vacuum chamber | [Jon, Cao]
1. Re-routing of cables
|
|
91
|
Wed May 3 19:03:47 2023 |
Julian,Pamella and Cao | Physics | VAC | Modify vacuum asssembly and install RGA | [Pamella, Julian, Cao]
Today we
started re-configuring the vacuum chamber
components.
Particle count |
|
97
|
Fri May 12 20:28:34 2023 |
Aiden, Cao | Physics | VAC | Vacuum chamber Helium leak test | [Aiden, Cao]
1. Helium leak test
2:00 pm: Uninstall regulator from nitrogen |
|
7
|
Mon Jul 11 14:29:45 2022 |
Jon | Omnistructure | General | HEPA filter installed | Today I unpacked and installed the new HEPA
filter for the lab. It is an Omni CleanAir
OCA1210 capable of 1200 CFM. This flow rate |
|
13
|
Wed Dec 14 17:35:41 2022 |
Jon | Infrastructure | Computers | Windows Laptop | I set up the new Windows 10 laptop (pictured
below), which arrived yesterday. This laptop
is intended to be used for running lightweight |
|
24
|
Tue Feb 7 17:44:17 2023 |
Jon | Infrastructure | Computers | Workstation 1 (ws1) set up | The Linux workstation (ws1) that used to sit
on the old workbench has been mounted on
the new electronics bench and is now ready |
|
26
|
Fri Feb 10 16:34:45 2023 |
Huy Tuong Cao | Infrastructure | Clean & Bake | Nitrogen gas tank ready to use | Cao,
Today I fixed the final bit related
to the nitrogen gas tank, which is to apply
sealing tape to M-NPT connector of the hose |
|
39
|
Wed Mar 1 21:27:20 2023 |
Jon | Infrastructure | Cleanroom | Over-table shelf height raised | Jon, Cao
Today we raised the height of the
shelf overhanging the cleanroom laser table |
|
40
|
Wed Mar 1 21:50:46 2023 |
Jon | Infrastructure | Computers | Workstation 2 (ws2) mounted on cleanroom cart | The Linux workstation (ws2) that used to
sit on the blue workbench (now inside the
cleanroom) has been mounted on a mobile cart, |
|
44
|
Mon Mar 6 15:32:58 2023 |
Jon | Infrastructure | General | Cabinet installation completed | Jon, Cao, Peter
This morning Facilities delivered
and installed two new cabinets with sliding |
|
53
|
Wed Mar 22 12:16:20 2023 |
Jon | Infrastructure | Cleanroom | Experimenting with HEPA fan speeds | Jon, Cao
In effort to try to reduce the noise
level inside the cleanroom, we have dialed |
|
56
|
Fri Mar 24 07:14:38 2023 |
Jon | Infrastructure | Computers | Workstation 2 (ws2) mounted on cleanroom cart | The ws2 cart has been thoroughly wiped down
with IPA wipes and moved inside the cleanroom.
I have reconnected it to power and Ethernet |
|
67
|
Tue Apr 11 13:15:40 2023 |
Cao | Infrastructure | Clean & Bake | Nitrogen gas tank replaced | The nitrogen gas tank has been replaced with
a new unit. The new tank is ultra pure nitrogen
(>99.9% nitrogen).
The new tank has been |
|
94
|
Tue May 9 15:49:20 2023 |
Jon | Infrastructure | VAC | Permanent cable routing | Today I brought in a fresh supply of zip
ties (we now have 1500 in the tool chest)
and used them to permanentize the cable routing |
|
95
|
Tue May 9 20:55:12 2023 |
Jon | Infrastructure | VAC | Calibrated Ar leak rate | For future reference, the calibrated Argon
source has a leak rate of 7.55E-8
atm cc/s, or equivalently |
|
98
|
Sun May 14 15:50:48 2023 |
Cao | Infrastructure | Computers | High resolution display of logrus machine | [Cao]
The display resolution of the
logrus has been 1064x768 and has been the
only option, which is not great. While remote |
|
122
|
Tue Jun 13 21:08:46 2023 |
Pamella | Infrastructure | VAC | Heater system - Installation | [Pamella, Cao and Jon]
Heating system
installation
Today we
started installing the equipments for the |
|
129
|
Tue Jun 20 22:14:24 2023 |
Pamella, Cao | Infrastructure | VAC | Short term testing of vacuum heater controller units | [Pamella, Cao]
Fuse replacement
Replace blown 10A fuse
in ucontroller outside cleanroom
|
|
130
|
Wed Jun 21 20:25:05 2023 |
Cao | Infrastructure | VAC | Vacuum chamber bake attempt 1 | TL;DR:
We are not yet able to
bake the chamber at 150 deg C due to some
current limit, most likely caused power supply |
6x |
136
|
Tue Jun 27 21:47:56 2023 |
Jon | Infrastructure | VAC | Vacuum chamber bake attempt 1 | The electrical overload problem encountered
in ELOG 130
has been resolved. The two heater controllers, |
|
137
|
Wed Jun 28 15:58:56 2023 |
Shane, Cao | Infrastructure | VAC | Power trip problem remains, source of smoke is insulation | [Shane, Cao]
With the new change
in wiring configuration described in elog
136, |
|
138
|
Thu Jun 29 18:27:26 2023 |
Jon, Cao | Infrastructure | VAC | Vacuum bake attempt 3: success! | [Jon, Cao]
Summary : We resolved
problems with heaters tripping power and
were able to proceed with chamber baking
|
|
141
|
Mon Jul 3 14:32:24 2023 |
Cao | Infrastructure | VAC | Cooling down vacuum chamber | [Cao]
After leaving the the chamber
to bake at 120 deg C from Thursday 3:41 pm.
Today I started to cool the chamber down |
|
142
|
Mon Jul 3 16:26:21 2023 |
Cao | Infrastructure | DAQ | Access and control Red Pitaya remotely and run it on local machine | [Cao]
To access and control the Red
Pitaya using Python locally on a machine
within the local network, one should follow |
|
145
|
Wed Jul 5 15:46:47 2023 |
Aiden, Cao | Infrastructure | VAC | Vacuum Chamber Baking Update |
Cao and Aiden put the RGA back on to
the chamber and measured the outgassing rate
after the chamber has cooled down from its |
|
198
|
Wed Aug 9 11:32:56 2023 |
Jon | Infrastructure | General | New power cables | I delivered new NEMA 5-15 (120V / 15 A)
power cables to the lab for the following
items: |
|
294
|
Sun Dec 17 21:04:15 2023 |
Jon | Infrastructure | Clean & Bake | Clean and bake lab migrated to 1129 | [Jon, Tyler, Aiden, Luke]
On Friday we completed assembly of
the new stainless steel-topped benches in |
|
297
|
Wed Dec 20 10:33:34 2023 |
Jon | Infrastructure | Clean & Bake | Clean and bake lab migrated to 1129 | Update: I
have completed permanent routing of the electrical
cables. I also ran the ultrasonic washer's |
|
303
|
Mon Jan 15 22:29:34 2024 |
Jon | Infrastructure | General | Cabinet installation & lab clean-up completed | [Jon, Tyler, Aiden, Shane, Pooyan, Michael,
Cynthia, Luke]
On Wednesday, we completed long list |
|
330
|
Tue Feb 20 08:01:30 2024 |
Jon | Infrastructure | General | Power and network equipment installed in 1129 rack | [Jon, Tyler, Pooyan, Luis, Luke, Peter]
On
Thursday we installed the power conditioning/distribution
equipment and networking equipment in the |
|
339
|
Sat Feb 24 08:53:38 2024 |
Jon | Infrastructure | Computers | Matlab upgraded to 2023b on Chimay | I upgraded Matlab on chimay to the latest
stable release, 2023b. From some quick tests,
it appears to be in working order. Let me |
|