ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
418
|
Tue Jul 30 07:42:47 2024 |
Jon | Infrastructure | General | Cable tray installed in 1119 | Yesterday I installed another 5' cable tray
in 1119, for permanently routing Ethernet
lines to the L-bench. It is securely bolted |
|
471
|
Wed Nov 13 14:06:00 2024 |
Luke | Update | General | | slides |
|
483
|
Mon Dec 2 13:35:45 2024 |
Luke | Update | General | Clean and bake of Viton O-rings | [Luke, Luis]
We couldn't access the bake log on
the wiki. (see attached) So we looked in |
|
500
|
Tue Jan 21 10:12:02 2025 |
Luke | Summary | General | Frosti toy model | [Luke, Liu]
Over the winter break I have been
working on this |
|
502
|
Sat Jan 25 18:19:39 2025 |
Luke | Update | General | Ringheater modeling Update | Here
is a quick update on some of the things I
have been working on regarding my project. |
|
507
|
Sat Feb 1 17:25:52 2025 |
Luke | Summary | General | Cleanroom cleaning | [Luke, Cece, Luis]
Particle Count Measurements:
Pre-cleaning (12:15 |
|
513
|
Sun Feb 16 16:45:18 2025 |
Luke | Update | General | Ringheater position optimization | Over the last couple weeks I have been
working on finding the optimal position of
the ringheater's thermal profile. |
   |
549
|
Tue Apr 8 10:47:10 2025 |
Liu | Update | General | Test Mass Thermal State Decoder Update | |
|
597
|
Tue Jun 24 12:45:16 2025 |
Tyler | Update | General | Updated ADC spectra | [Tyler]
Updated ADC noise spectra measurements
using diaggui.
NOTE: Will update plots |
 |
73
|
Wed Apr 19 17:39:50 2023 |
Pamella | Update | FLIR | FLIR project |
FLIR project updates- Initial tests
10:00: Starting test
in position 2 cm to the black wall.
|
  |
75
|
Fri Apr 21 15:21:18 2023 |
Pamella | Update | FLIR | | FLIR project updates
01:50 pm: Starting test position 34 mm distance
to black wall.
Parameters : |
|
104
|
Mon May 22 17:08:50 2023 |
Pamella | Update | FLIR | FLIR project - Installing the mask. | [Pamella]
The new mask
for the reflector.
1:40
pm: Started reconfiguration on the FLIR camera |
  |
105
|
Tue May 23 16:52:56 2023 |
Pamella | Update | FLIR | FLIR project - Reinstalling the mask and Reconfiguration FLIR position. | [Pamella]
Reinstalling the mask
and Reconfiguration FLIR position.
Today i change the aluminum foil inside the |
 |
106
|
Wed May 24 14:06:27 2023 |
Pamella | Update | FLIR | FLIR project - Tests | [Pamella]
Initial tests
10:30 am : Started trying take some test
with the new position/configuration between |
  |
108
|
Tue May 30 14:51:27 2023 |
Pamella | Update | FLIR | New 3D mask - Bigger triangles shapes. | [Pamella]
Change the 3D mask
Started removing the old mask in the reflector.
Started cutting the new aluminum lid for |
 |
112
|
Wed May 31 16:55:55 2023 |
Pamella | Update | FLIR | FLIR- Focus distance | [Pamella and Tyler]
We changed
the FLIR Focus Distance for around 0.55 m.
Note:
The old focus distance was 1.3 m.
We |
 |
113
|
Thu Jun 1 14:41:36 2023 |
Pamella | Update | FLIR | FLIR project - Test without the black wall. | [Pamella]
Test without the black
wall.
General test:.
11:15 am : Started running the code. Parameters: |
  |
114
|
Fri Jun 2 14:28:40 2023 |
Pamella | Update | FLIR | FLIR project - Test without the black wall. | [Pamella]
Test without the black
wall.
Note: So today i collected
data for some positions in axis Y (height) |
|
117
|
Thu Jun 8 14:51:58 2023 |
Pamella | Update | FLIR | FLIR- Distance | [Pamella, Tyler]
Today we change
the distance between the FLIR camera and
reflector (3D-Mask with mirrors and light). |
 |
118
|
Mon Jun 12 12:15:10 2023 |
Pamella | Update | FLIR | FLIR- Take data in the closest point. | [Pamella]
Used the closest point
possible for the reflector in front of the
FLIR camera.
11:32 am : Turned |
|
125
|
Fri Jun 16 16:17:13 2023 |
Pamella | Update | FLIR | FLIR - Change the position | [Pamella]
Today I change the distance
between the FLIR camera and reflector (3D-Mask
with mirrors and light). Now the distance |
|
127
|
Mon Jun 19 11:20:57 2023 |
Pamella | Update | FLIR | FLIR - Fixed some problems | [Pamella]
08:59 am: Turned
on the electronic device (current on) for
started taking data.
09:37 |
|
132
|
Fri Jun 23 15:47:06 2023 |
Pamella | Update | FLIR | Collecting data - Moving horizontal and vertical on screen. | [Pamella]
02:09 pm: Turned
on the device (current on)
02:42
pm: Started taking snap on position one (Reference |
6x |
135
|
Tue Jun 27 15:18:26 2023 |
Pamella | Update | FLIR | New data collection |
[Pamella]
Yesterday,
I did a new data collection. I could get
a better data in this time and I realized |
 |
139
|
Fri Jun 30 15:57:28 2023 |
Pamella | Update | FLIR | Data and python code update |
[Pamella]
Updates: Problems
with the emission intensity and python code.
Yesterday I was working on get |
   |
140
|
Fri Jun 30 16:43:14 2023 |
Pamella | Update | FLIR | Updates: Small moving the FLIR camera | [Pamella]
Today, I was able to
make some adjustments to the FLIR camera
angle, suggested by Dr. Richardson, and |
    |
143
|
Mon Jul 3 18:38:13 2023 |
Pamella | Update | FLIR | FLIR project | [Pamella]
I was able to work
on the python code to do analysis on the
FLIR-Reflector data.
I could plot |
   |
144
|
Tue Jul 4 15:35:38 2023 |
Pamella | Update | FLIR | FLIR - reflexion problem | [Pamella]
I was testing all the positions
we need to cover when moving the FLIR camera
or the reflector. I tried to find out more |
    |
149
|
Thu Jul 6 18:03:19 2023 |
Pamella | Update | FLIR | FLIR project - New configuration | [Pamella]
Cao suggested using the project
without the reflector and mask because in
this case we probably got good images around |
   |
151
|
Sat Jul 8 14:26:17 2023 |
Pamella | Update | FLIR | Data with the new configuration without the mask and reflector. | [Pamella]
I started collecting data by moving
the camera FLIR and covering all six positions
on the screen (2x3). I was looking and taking |
6x |
157
|
Fri Jul 14 16:49:42 2023 |
Pamella | Update | FLIR | New bridge and calibration data | [Pamella]
Aiden 3D printed a new
bridge for the heater and I installed the
new bridge yesterday.
I started |
|
159
|
Mon Jul 17 11:46:24 2023 |
Pamella | Update | FLIR | Thermocouple plot. | [Pamella]
I collected data to plot
a calibration with the heater. I took measurements
with current and temperature (the thermocouple |
 |
163
|
Tue Jul 18 16:04:26 2023 |
Pamella | Update | FLIR | Setup FLIR with black wall (black body) | [Pamella]
Today I tried get data
the heater with the black screen but doesn't
looks possible have just one "energy" point |
  |
164
|
Tue Jul 18 16:12:27 2023 |
Pamella | Update | FLIR | Thermocouple plot. | I noticed that these measurements
have some issues with the weather on different
days. We can see in the photo attached below |
|
165
|
Tue Jul 18 16:35:06 2023 |
Pamella | Update | FLIR | Plot-Data with the new configuration without the mask and reflector. | [Pamella]
I was able to plot the
first graph for a result between the six
different positions on the screen, for now |
|
167
|
Wed Jul 19 19:10:31 2023 |
Pamella | Update | FLIR | Data plot FLIR and updates. | [Pamella]
Today I was able to plot
a graph for the isolation point on the center
of the heater. I got data from six different |
8x |
169
|
Thu Jul 20 21:00:23 2023 |
Pamella | Update | FLIR | Data plot FLIR and updates about the black body | [Pamella]
Today I got more data
to plot the Gaussian. So I took more snaps
in each position for the six different spots |
    |
181
|
Fri Jul 28 18:03:07 2023 |
Pamella | Update | FLIR | Final plot - FLIR | [Pamella]
I was able to
plot the final result with the data to the
heater. I attached below the "3Combined_HighTemp_Gaussian_Plot." |
  |
323
|
Tue Feb 13 11:54:45 2024 |
Tyler | Configuration | FLIR | In-Air Optical Test Configuration |
Below is the proposed schematic for FROSTI
optical testing, chosen so enough space is
allotted for prototype assembly.
|
|
338
|
Fri Feb 23 18:03:27 2024 |
Tyler | Update | FLIR | Optical Test Setup in Cleanroom | [Tyler, Xuesi]
The FLIR and test mass
stand-in have been transferred into the cleanroom.
A software test will be run as soon as we |
|
349
|
Tue Mar 19 10:55:30 2024 |
Tyler | Update | FLIR | In-Air Optical Test | Below is an image I took using the FLIR just
before leaving for the LVK meeting. The profile
is roughly what we would expect (annular). |
|
366
|
Mon May 13 13:03:41 2024 |
Tyler | Update | FLIR | Readout Code Updates | [Tyler]
Some changes have been made
to the FLIR readout code to help improve
its functionality:
More accurate |
|
373
|
Mon Jun 3 14:14:39 2024 |
Tyler | Update | FLIR | Initial CIT FROSTI Analysis | [Tyler]
Attached below are the initial
results of the CIT FROSTI testing analysis.
|
|
375
|
Mon Jun 10 14:52:38 2024 |
Tyler | Update | FLIR | CIT FROSTI Analysis Update | [Tyler]
Upon further inspection, one
adjustment was made to the FROSTI profile
analysis: changing the transmission value |
|
396
|
Mon Jul 8 10:39:14 2024 |
Xuejun | Update | FLIR | Average Temperature Profile | After taking data for each of the individual
heater elements, I imported them into python
and overlayed them to produce an average |
|
552
|
Tue Apr 15 11:09:37 2025 |
Liu | Update | FLIR | Test Mass Thermal State Decoder Update with robustness study | |
 |
14
|
Wed Dec 14 18:34:33 2022 |
Jon | Configuration | Electronics | Adapter for 532 nm laser power supply | I installed an EU-to-US plug adapter for the
532nm laser's 9V power supply. I then re-measured
the laser's power with the correct supply |
|
128
|
Tue Jun 20 17:28:23 2023 |
Pamella | Update | Electronics | Heater system parts - Wiped | [Pamella]
Heating system
Wiping the heater system parts.
04:37 pm: Started wiping the electronic |
|
171
|
Mon Jul 24 16:19:29 2023 |
Shane, Jon | Update | Electronics | Chassis semi-assembled and moved | Began assembly on AA and AI chassis today,
moved them both to top work bench shelf (image
attached). They are delicate so please do |
|
172
|
Tue Jul 25 15:35:14 2023 |
Shane | Update | Electronics | More chassis moved | Finished basic assembly of binary input and
output chassis today, and moved one to top
shelf of work bench. The other is in corner |
|