ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 8 of 13  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Categorydown Subject Text Attachments
  59   Fri Mar 31 14:23:13 2023 PamellaUpdateGeneralClean and bake batch 11Today I bagged and tagged batch 11. I wiped
the some tools: Centering ring alum( 2 pieces),
reversible ratcheting, gasket removal (CF).
 4AC705B8-D906-47E3-86E4-49E4967910E7.jpeg 
  60   Mon Apr 3 17:04:05 2023 AidenSummaryGeneralIDP Scroll Pump AssemblyAiden installed the isolation valve and the
exhaust silencer kits on the IDP-3 Scroll
pump. The entire assembly still needs to
 IMG_4244.jpg 
  66   Fri Apr 7 09:48:09 2023 PamellaUpdateGeneralClean the system partsPamella and Julian wiped and tag system parts
for the vacuum machine. We used isopropyl
and vectra wipes in the most import pieces:
 7x 
  68   Tue Apr 11 17:56:15 2023 PamellaUpdateGeneralLab cleaning Today Pamella and Julian finished cleaning
of the cleanroom, starting with the HEPA
vacuuming, mopping and clearing all floor
  
  69   Wed Apr 12 10:53:02 2023 AidenSummaryGeneralValve CleaningBagged and Tagged the parts from batch 10
and placed them inside the clean room. 

Then
cleaned the last gate valve in liquinox for
  
  71   Wed Apr 12 16:17:50 2023 shaneUpdateGeneralParticle Counter movedWith the added height of the new docking station,
the particle counter no longer fits under
the Windows monitor in the electronics rack
 IMG_6693.HEIC 
  72   Mon Apr 17 17:06:49 2023 AidenSummaryGeneralClean and Bake batch 11Cleaned the Viton O-Ring for the main chamber
in Liquinox for 10 minutes. Then put it in
the oven to back for;

1. Ramp to 100 degC
 IMG_4262.jpg 
  76   Fri Apr 21 16:51:26 2023 PamellaUpdateGeneralCleaning cables.Cables for the vacuum system.
 

Today i wiped, bagged and tagged two cables
for the vacuum system. I used IPA wipes for
 IMG_5416.jpeg 
  77   Mon Apr 24 17:38:45 2023 AidenSummaryGeneralClean and Bake Batch 12Today I Bagged and tagged the o-rings from
batch 11 and placed them inside the clean
room. I also cleaned batch 12 parts in liquinox
 IMG_4269.jpgIMG_4268.jpg 
  80   Thu Apr 27 09:48:34 2023 AidenSummaryGeneralBatch 12 BaggingI took batch 12 out of the oven and put them
in a bag and placed the bag inside the clean
room in the first large stainless steel container.

I
 IMG_4279.jpgIMG_4278.jpg 
  86   Fri Apr 28 19:39:19 2023 CaoSummaryGeneralClean and Bake Leybold TTR 91 Pirani Gauge



  
  93   Mon May 8 12:00:03 2023 Pamella, Shane, JulianUpdateGeneralCleanroom particle counts and cleaning the cleanroom.[Pamella,Julian, Shane]


Today we
cleaned the clean-room (floor, surfaces)
and particle count.



10:00
  
  96   Wed May 10 10:49:34 2023 AidenUpdateGeneralRGA Software[Aiden, Cao]

Went over how to use the RGA
software, how to change the graph units,
scaling and mass detection. Also went over
  
  100   Wed May 17 12:18:08 2023 Pamella, Julian and Shane UpdateGeneralCleaning room and particle count[Pamella, Julian and Shane]



Particle
count: 
  10 am: Started particle count


 Zone 3 :

  
  109   Wed May 31 11:42:16 2023 Pamella, Julian and ShaneUpdateGeneralCleaning room and particle count[Pamella, Shane and Julian]


 Cleaning
room and particle count 


 09:58 am: Started the particle count
  
  111   Wed May 31 16:18:41 2023 AidenSummaryGeneralMock FROSTIFinished assembly on the Mock FROSTI so it
is ready for the fit test at LIGO lab.
 IMG_4394.jpg 
  115   Tue Jun 6 16:04:46 2023 AidenUpdateGeneralWaterAiden went and refilled the de-ionized water
to continue clean and bake batches.
  
  119   Mon Jun 12 18:52:00 2023 PamellaUpdateGeneralHeater system parts - Wiped and bagged[Pamella]
  Cleaning the heater system
parts.
 04:32 pm: Started wiping the
heater system parts.  
 06:38 pm:
 heater_equipment_wiped.jpg 
  120   Tue Jun 13 10:28:50 2023 PamellaUpdateGeneralWiped and bagged the heating and cords.[Pamella]


    Cleaning the heater
system parts.
    09:13 am: Started
wiping the last parts for the heater system
 heater_cords_wiped.jpg 
  123   Tue Jun 13 21:33:46 2023 PamellaUpdateGeneralNew cabinet for PPI[Pamella and Dr.Richardson]

Dr. Richardson
installed the new cabinet outside the room
for the PPI equipments, and then I wiped
  
  154   Thu Jul 13 15:31:21 2023 JonUpdateGeneralAnt traps placed around labIn response to reports that ants have been
observed in the lab, I placed five ant bait
traps around the room today. Each is sitting
  
  155   Thu Jul 13 16:59:03 2023 JonUpdateGeneralAnt traps placed around labUpdate: After seeing the
strong response to the first set, I redistributed
them to the hottest spots and added one more
  
  158   Sun Jul 16 15:21:56 2023 PamellaUpdateGeneralGeneral update about some problems in the lab.[Pamella]

 General information about
the lab facility. 
 
 
Changed sticky floor mats, because close
 IMG_8637.jpgIMG_8633.jpgIMG_8631.jpg 
  198   Wed Aug 9 11:32:56 2023 JonInfrastructureGeneralNew power cablesI delivered new NEMA 5-15 (120V / 15 A)
power cables to the lab for the following
items:
 IMG_0299.jpg 
  217   Tue Aug 29 22:07:38 2023 AidenUpdateGeneralElectronic BenchDr Richardson is working on mounting more
power supplies in the server rack and is
using the electronics bench. Be aware to
 IMG_4632.jpg 
  220   Tue Sep 5 16:43:19 2023 AidenUpdateGeneralVAC System Heating UpdateChecked on bake 5 today after 3 days of equilibrium.
The RGA cross is at 106 C and the turbo pump
cross is at 74 C. This was reached while
  
  257   Wed Nov 8 17:55:49 2023 JonUpdateGeneralLab Clean-Up Day 1[Jon, Tyler, Shane, Peter, Luis]
Today we completed the first phase
of lab clean-up. Activities included:
  
  275   Tue Nov 21 22:09:44 2023 AidenUpdateGeneralTesting Parts[Aiden, Luis]


Luis and Aiden vented
the chamber today. We closed off the RGA
section and then proceeded to open the the
 8x 
  289   Sat Dec 9 12:34:12 2023 JonUpdateGeneralElectronics workshop migrated to 1129[Jon, Tyler, Shane, Luis]
On Wednesday we completed the migration
of the electronics workshop from 1119 to
 IMG_0765.jpgIMG_0767.jpeg 
  299   Mon Jan 8 20:24:53 2024 AidenUpdateGeneral [Jon, Aiden]

Installed the heater elements
into their fixture and prepped the cables
by twisting the wires into pairs. We also
 IMG_4888.jpgIMG_4886.jpgIMG_4887.jpg 
  303   Mon Jan 15 22:29:34 2024 JonInfrastructureGeneralCabinet installation & lab clean-up completed[Jon, Tyler, Aiden, Shane, Pooyan, Michael,
Cynthia, Luke]
On Wednesday, we completed long list
 1129.png1119.png 
  307   Wed Jan 17 15:47:49 2024 AidenUpdateGeneralResistors for Heater ElementsPower         Res (Ohm) RTD Res (Ohm)

Heater
1= 73.6; 81.8

Heater 2= 70.4; 82.1

Heater
3= 71; 84.5

Heater 4= 71.5; 80

Heater
  
  330   Tue Feb 20 08:01:30 2024 JonInfrastructureGeneralPower and network equipment installed in 1129 rack[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On
Thursday we installed the power conditioning/distribution
equipment and networking equipment in the
 IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg 
  332   Tue Feb 20 18:08:24 2024 AidenUpdateGeneralDegassing the RGAI took an RGA measurement before and after
degassing the RGA. Both data was taken with
the Argon open. The pressure before taking
 bake11_240220_Elements_postdegas_ArO.pngbake11_240220_Elements_predegas_ArO.png 
  340   Mon Feb 26 15:15:39 2024 AidenUpdateGeneralVacuum Chamber Baking UpdateStarted Bake 12 on Wednesday Feb. 21 and turned
the bake off on Saturday Feb. 24. This was
a normal low temp bake with the PID controllers
  
  344   Wed Feb 28 12:02:08 2024 TylerUpdateGeneralResistors for Heater Elements UpdatePower         Res (Ohm) RTD Res (Ohm)

Heater
1= 72.8; 80.6

Heater 2= 69.5; 80.8

Heater
3= 70; 83.2

Heater 4= 70.6; 78.7

Heater
  
  352   Sun Mar 24 11:49:27 2024 AidenUpdateGeneralFROSTI RGA ScanTook RGA data 1 day after the conclusion of
Bake 13. Bake 13 ended on Saturday March
23, the RGA data shown was taken on Sunday
 bake13_240324_FROSTI_ArC.pngbake13_240324_FROSTI_ArO.png 
  377   Mon Jun 17 11:47:46 2024 LiuInfrastructureGeneralTemporary cooling units for the labsBelow are the temporary cooling units installed
last week in labs 1119 and 1129. They are
the temp. replacement for the building AC
 1119.jpg1129.jpg 
  402   Thu Jul 11 21:01:37 2024 JonInfrastructureGeneralCable tray installed in 1129Today I installed a 10' cable tray in 1129,
for permanently routing Ethernet lines to
the workstations. It is securely bolted to
 IMG_1395.pngIMG_1396.png 
  403   Sat Jul 13 15:09:04 2024 LukeUpdateGeneralRing heater COMSL model updateAfter the feedback from last meeting and
Liu's help narrowing down what I should do
to improve the model. I made some changes:
 image_2024-07-13_150654436.pngimage_2024-07-13_150704735.pngimage_2024-07-13_150716079.pngimage_2024-07-13_150726593.png 
  418   Tue Jul 30 07:42:47 2024 JonInfrastructureGeneralCable tray installed in 1119Yesterday I installed another 5' cable tray
in 1119, for permanently routing Ethernet
lines to the L-bench. It is securely bolted
 cable_tray_1119.jpg 
  471   Wed Nov 13 14:06:00 2024 Luke UpdateGeneral slides   
  483   Mon Dec 2 13:35:45 2024 Luke UpdateGeneralClean and bake of Viton O-rings[Luke, Luis]
We couldn't access the bake log on
the wiki. (see attached) So we looked in
 image_(2).png 
  500   Tue Jan 21 10:12:02 2025 Luke SummaryGeneralFrosti toy model [Luke, Liu]
Over the winter break I have been
working on this
  
  502   Sat Jan 25 18:19:39 2025 Luke UpdateGeneralRingheater modeling UpdateHere
is a quick update on some of the things I
have been working on regarding my project. 
  
  507   Sat Feb 1 17:25:52 2025 Luke SummaryGeneralCleanroom cleaning[Luke, Cece, Luis]
Particle Count Measurements:

Pre-cleaning (12:15
 20250131_particalcount.png 
  513   Sun Feb 16 16:45:18 2025 Luke UpdateGeneralRingheater position optimization Over the last couple weeks I have been
working on finding the optimal position of
the ringheater's thermal profile. 
 02.png_40.png_4-4.png02_40_4-4.png 
  549   Tue Apr 8 10:47:10 2025 LiuUpdateGeneralTest Mass Thermal State Decoder Update   Update.pdf 
  597   Tue Jun 24 12:45:16 2025 TylerUpdateGeneralUpdated ADC spectra[Tyler]

Updated ADC noise spectra measurements
using diaggui. 

 NOTE: Will update plots
 csd_spec.pngchi_sq.png 
  605   Mon Jul 7 17:44:04 2025 TylerUpdateGeneralLab Organization[Tyler, Pooyan, Ma, Cece, Luke, Luis, Christina,
Maple]

After acquiring some new equipment
for the labs, a few of us spent time on Thursday
 IMG_1874.jpgIMG_1872.jpgIMG_1871.jpg 
ELOG V3.1.3-7933898