ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 8 of 11  Not logged in ELOG logo
ID Date Authordown Type Category Subject Text Attachments
  7   Mon Jul 11 14:29:45 2022 JonOmnistructureGeneralHEPA filter installedToday I unpacked and installed the new HEPA
filter for the lab. It is an Omni CleanAir
OCA1210 capable of 1200 CFM. This flow rate
 IMG_1530.png 
  13   Wed Dec 14 17:35:41 2022 JonInfrastructureComputersWindows LaptopI set up the new Windows 10 laptop (pictured
below), which arrived yesterday. This laptop
is intended to be used for running lightweight
 laptop.png 
  14   Wed Dec 14 18:34:33 2022 JonConfigurationElectronicsAdapter for 532 nm laser power supplyI installed an EU-to-US plug adapter for the
532nm laser's 9V power supply. I then re-measured
the laser's power with the correct supply
 laser_power.png 
  24   Tue Feb 7 17:44:17 2023 JonInfrastructureComputersWorkstation 1 (ws1) set upThe Linux workstation (ws1) that used to sit
on the old workbench has been mounted on
the new electronics bench and is now ready
 ws1.jpg 
  39   Wed Mar 1 21:27:20 2023 JonInfrastructureCleanroomOver-table shelf height raisedJon, Cao

Today we raised the height of the
shelf overhanging the cleanroom laser table
 cleanroom-shelf.jpg 
  40   Wed Mar 1 21:50:46 2023 JonInfrastructureComputersWorkstation 2 (ws2) mounted on cleanroom cartThe Linux workstation (ws2) that used to
sit on the blue workbench (now inside the
cleanroom) has been mounted on a mobile cart,
 ws2_cart-1.jpegws2_cart-2.jpeg 
  44   Mon Mar 6 15:32:58 2023 JonInfrastructureGeneralCabinet installation completedJon, Cao, Peter
This morning Facilities delivered
and installed two new cabinets with sliding
 IMG_0088.jpgIMG_0089.jpg 
  53   Wed Mar 22 12:16:20 2023 JonInfrastructureCleanroomExperimenting with HEPA fan speedsJon, Cao
In effort to try to reduce the noise
level inside the cleanroom, we have dialed
  
  56   Fri Mar 24 07:14:38 2023 JonInfrastructureComputersWorkstation 2 (ws2) mounted on cleanroom cartThe ws2 cart has been thoroughly wiped down
with IPA wipes and moved inside the cleanroom.
I have reconnected it to power and Ethernet
  
  63   Tue Apr 4 16:43:53 2023 JonUpdateVLC ElectronicsAdditional Thorlabs PDA10A2I ordered a second PDA10A2 and mounting post
+ spacer (which puts the aperture at the
VLC's standard 3" beam height). These arrived
 PDA10A2.png 
  64   Tue Apr 4 16:52:08 2023 JonUpdateCleanroomParticle counter docking stationDue to the problems we have encountered trying
to serially communicate directly with the
Met One DR-528 particle counter, I went ahead
 Met_One_Dock.png 
  74   Fri Apr 21 00:06:43 2023 JonUpdateVACVacuum prep and installation - parts have arrivedThe two parts needed to complete the vacuum
assembly (ELOG
70) have arrived.
 SS_parts.png 
  78   Tue Apr 25 11:56:37 2023 JonUpdateVLC ElectronicsRed Pataya has arrivedThe Red Pataya 125-14 starter kit that we
ordered for locking the 532 nm cavity has
arrived. I left it laying on the optical
 Red_Pataya.jpg 
  82   Thu Apr 27 21:43:07 2023 JonPhysicsVACGrounding vacuum systemThis afternoon I made up a green 10 AWG
grounding cable and connected it to the vacuum
system.
 IMG_0141.pngIMG_0140.png 
  94   Tue May 9 15:49:20 2023 JonInfrastructureVACPermanent cable routingToday I brought in a fresh supply of zip
ties (we now have 1500 in the tool chest)
and used them to permanentize the cable routing
  
  95   Tue May 9 20:55:12 2023 JonInfrastructureVACCalibrated Ar leak rateFor future reference, the calibrated Argon
source has a leak rate of 7.55E-8
atm cc/s, or equivalently 
 VTI-Calibrated-Ar-Leak.jpeg 
  136   Tue Jun 27 21:47:56 2023 JonInfrastructureVACVacuum chamber bake attempt 1The electrical overload problem encountered
in ELOG 130
has been resolved. The two heater controllers,
 IMG_0256.pngIMG_0257.pngIMG_0254.png 
  154   Thu Jul 13 15:31:21 2023 JonUpdateGeneralAnt traps placed around labIn response to reports that ants have been
observed in the lab, I placed five ant bait
traps around the room today. Each is sitting
  
  155   Thu Jul 13 16:59:03 2023 JonUpdateGeneralAnt traps placed around labUpdate: After seeing the
strong response to the first set, I redistributed
them to the hottest spots and added one more
  
  170   Mon Jul 24 14:55:53 2023 JonUpdateVACRemoved extension power cableI removed the extension cable that was powering
the leftmost heater controller, since there
is no bake currently happening. It is currently
  
  198   Wed Aug 9 11:32:56 2023 JonInfrastructureGeneralNew power cablesI delivered new NEMA 5-15 (120V / 15 A)
power cables to the lab for the following
items:
 IMG_0299.jpg 
  202   Thu Aug 10 15:10:12 2023 JonUpdateVACVAC System Heating UpdateI shut down the turbo pump since this is evidently
a large leak. We CANNOT turn on the RGA for
leak checking with the pressure above 1E-5
  
  238   Wed Oct 11 20:47:11 2023 JonUpdateVACVacuum upgrade begins[Jon, Tyler, Aiden, Peter]
Upgrade of the UHV system to a larger
turbo pump began today. After obtaining a
 IMG_0619.pngIMG_0621.pngIMG_0618.png 
  248   Mon Oct 30 08:42:22 2023 JonUpdateVACVacuum Leak TestBy 5:30 pm Friday, the pressure had reached
8.6e-8 torr and was continuing to fall. So
it seems we are OK to proceed with permanentizing
 IMG_0659.pngIMG_0660.png 
  257   Wed Nov 8 17:55:49 2023 JonUpdateGeneralLab Clean-Up Day 1[Jon, Tyler, Shane, Peter, Luis]
Today we completed the first phase
of lab clean-up. Activities included:
  
  261   Fri Nov 10 08:32:34 2023 JonUpdateVACRGA experimentsI ran a 3-minute
degas cycle of the RGA filament for the first
time yesterday (in this process, the filament
  
  266   Tue Nov 14 17:21:40 2023 JonUpdateVACRGA best practicesAs a follow up ELOG 261,
I have received advice from one of the vacuum
experts at LIGO Hanford on best practices
  
  277   Thu Nov 23 12:34:44 2023 JonUpdateCDSDB25 signal connections for FROSTI heatersUpdate: I was able to put the
FROSTI power controller on the lab network.
It is connected to the switch in the top
  
  289   Sat Dec 9 12:34:12 2023 JonUpdateGeneralElectronics workshop migrated to 1129[Jon, Tyler, Shane, Luis]
On Wednesday we completed the migration
of the electronics workshop from 1119 to
 IMG_0765.jpgIMG_0767.jpeg 
  291   Mon Dec 11 16:20:17 2023 JonSummaryTCSFROSTI Assembly ProcedureBelow is the procedure we will follow to
assemble the FROSTI prototype.

Install SS guide rods and
  
  294   Sun Dec 17 21:04:15 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129[Jon, Tyler, Aiden, Luke]
On Friday we completed assembly of
the new stainless steel-topped benches in
 IMG_0781.pngIMG_0782.png 
  297   Wed Dec 20 10:33:34 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129Update: I
have completed permanent routing of the electrical
cables. I also ran the ultrasonic washer's
  
  298   Fri Dec 29 16:02:27 2023 JonConfigurationElectronicsRTD Readout ChassisThe custom front and rear panels for the
RTD readout chassis arrived last Friday.
I installed them in the chassis frame to
 front.jpegrear.jpegoverhead.jpeg 
  303   Mon Jan 15 22:29:34 2024 JonInfrastructureGeneralCabinet installation & lab clean-up completed[Jon, Tyler, Aiden, Shane, Pooyan, Michael,
Cynthia, Luke]
On Wednesday, we completed long list
 1129.png1119.png 
  313   Fri Feb 2 16:56:56 2024 JonUpdateCDSRTS model implemented for FROSTI RTD readoutsSummary
Today I finished implementing
an RTS model to read out the integrated FROSTI
RTDs (temperature sensors) via the CyMAC.
 sitemap_screen.png 
  327   Fri Feb 16 18:37:28 2024 JonUpdateVACBake ended 6:23 pmI ended the bake of the UHV system (that
began on Monday) at 6:23 pm today by switching
OFF both PID controllers. The heaters elements
  
  330   Tue Feb 20 08:01:30 2024 JonInfrastructureGeneralPower and network equipment installed in 1129 rack[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On
Thursday we installed the power conditioning/distribution
equipment and networking equipment in the
 IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg 
  335   Thu Feb 22 21:48:16 2024 JonUpdateVACVacuum vent for RGA testing of reflector[Jon, Tyler, Luke, Aiden]
Summary
Following
Wednesday's cleanroom cleaning [333],
we proceeded to vent the vacuum chamber,
 IMG_0938.pngIMG_0939.png 
  339   Sat Feb 24 08:53:38 2024 JonInfrastructureComputersMatlab upgraded to 2023b on ChimayI upgraded Matlab on chimay to the latest
stable release, 2023b. From some quick tests,
it appears to be in working order. Let me
  
  341   Mon Feb 26 21:23:27 2024 JonUpdateTCSFROSTI Assembly - Day 1[Jon, Tyler, Luis, Luke, Mohak, Cynthia, Michael,
Aiden]
FROSTI assembly began today. After
a final set of RGA scans were taken, the
 7x 
  379   Thu Jun 20 18:01:11 2024 JonInfrastructureComputersNew workstation ws3 in 1129I have repurposed a spare Intel NUC to serve
as the first of two planned workstations
in 1129. Today I set it up with a fresh installation
  
  385   Wed Jun 26 15:33:41 2024 JonInfrastructureComputersNew workstation ws3 in 1129
Set-up of the first CDS workstation for
1129, ws3, is complete and the machine is
ready for use. The login credentials are
 IMG_1368.jpg 
  402   Thu Jul 11 21:01:37 2024 JonInfrastructureGeneralCable tray installed in 1129Today I installed a 10' cable tray in 1129,
for permanently routing Ethernet lines to
the workstations. It is securely bolted to
 IMG_1395.pngIMG_1396.png 
  412   Fri Jul 26 17:25:42 2024 JonInfrastructureComputersNew workstation ws4 installed in 1129Today I installed the second desktop workstation
in 1129. The new machine is an Intel NUC13ANHi5,
with a 12-Core Intel i5-1340P CPU, 32GB DDR4
 ws4.jpg 
  418   Tue Jul 30 07:42:47 2024 JonInfrastructureGeneralCable tray installed in 1119Yesterday I installed another 5' cable tray
in 1119, for permanently routing Ethernet
lines to the L-bench. It is securely bolted
 cable_tray_1119.jpg 
  26   Fri Feb 10 16:34:45 2023 Huy Tuong CaoInfrastructureClean & BakeNitrogen gas tank ready to useCao,


Today I fixed the final bit related
to the nitrogen gas tank, which is to apply
sealing tape to M-NPT connector of the hose
 AirGunSealed.jpg 
  359   Mon Apr 8 14:57:41 2024 Cynthia, PooyanUpdateInterferometer Simulationsperformed cavity scans for O4 O5, and coupled cavity    LIGO_update_week1.pdf 
  343   Tue Feb 27 09:06:29 2024 Cynthia UpdateInterferometer Simulationscavity scan with higher order input laserI performed a few cavity scan with the inputing
laser with a different mode (not pure 00).
For each laser I included a graph for just
 ligoPre_2_27.pdf 
  363   Mon Apr 22 15:06:33 2024 Cynthia UpdateInterferometer Simulationscavity scan update[Cynthia,Pooyan]
Completed some simulations
injecting 0-10th order modes. Some graphs
will be used for the poster after some further
 LIGO_4_22.pdf 
  381   Mon Jun 24 14:28:51 2024 Cynthia UpdateInterferometer SimulationsSIS cavity with thermal effecttried to run a cavity scan with thermal deformation
and ring heater for ITM04 ETM08 (aLIGO mirrors).
Not sure about the accuracy of the graph
 ETM08thermal.png 
ELOG V3.1.3-7933898