  204   Fri Aug 11 10:57:20 2023 CelesteUpdateTCS8/11/23 Simulation Progress   Simulation_Progress__1_32nd_Model_(1).pdf 
  209   Tue Aug 15 16:10:06 2023 CelesteUpdateTCS8/15/2023 Simulation Progress   Simulation_Progress__1_32nd_Model_(2).pdf 
  6   Tue Jun 21 18:31:49 2022 Cassidy and PhoebeUpdateCamerasIR Absorbing Screen and FLIR Camera SetupToday we set up the IR absorbing screen and
the camera on the optical table, as well
as tested that the camera was functioning
 IMG_6751.pngIMG_1146.pngIMG_6756.png 
  9   Tue Jul 26 14:10:35 2022 CassidyUpdateCamerasOptical Post Replacement and RealignmentToday I replaced the 3" optical post that
the camera rests on with a 2" optical post
in order for the screen to correctly fill
 YAxisAlignment.pngXRotZAlignment.pngNewOpticalPost.png 
  81   Thu Apr 27 16:23:44 2023 Cao, Pamella and JulianPhysicsVACInstalling vacuum system (cont.)
 
[Pamella, Cao and Julian, Shane]



 Particles account 

10:37 am: Starting the particles account
 IMG_0139.pngIMG_0136.png 
  11   Mon Oct 3 17:21:39 2022 CaoUpdateTCSInspection of macor partsThe macor parts arrived and inspected today.
These include:


 Macor spacer
(drawing:  LIGO_Redesign_Macor_Spacer_Drawing_v4.pdf
 7x 
  67   Tue Apr 11 13:15:40 2023 CaoInfrastructureClean & BakeNitrogen gas tank replacedThe nitrogen gas tank has been replaced with
a new unit. The new tank is ultra pure nitrogen
(>99.9% nitrogen).

The new tank has been
  
  70   Wed Apr 12 16:13:19 2023 CaoPhysicsVACVacuum prep and installationAiden, Pamella, Peter, Shane, Cao 


Today
we started vacuum chamber assembly work


10:16 am: Particle count measurement of clean
 VacAssy230412.png 
  84   Fri Apr 28 18:16:57 2023 CaoPhysicsVACGrounding vacuum system



  
  85   Fri Apr 28 19:00:13 2023 CaoPhysicsVACTighten CF ports on vacuum chamber[Cao]

 
After Jon's comment yesterday
that some of the connection did not seem
to have good metal-metal contact, in particular
 TightenCF.png 
  86   Fri Apr 28 19:39:19 2023 CaoSummaryGeneralClean and Bake Leybold TTR 91 Pirani Gauge



  
  98   Sun May 14 15:50:48 2023 CaoInfrastructureComputersHigh resolution display of logrus machine[Cao]

 
The display resolution of the
logrus has been 1064x768 and has been the
only option, which is not great. While remote
  
  130   Wed Jun 21 20:25:05 2023 CaoInfrastructureVACVacuum chamber bake attempt 1 TL;DR: 
We are not yet able to
bake the chamber at 150 deg C due to some
current limit, most likely caused power supply
 6x 
  141   Mon Jul 3 14:32:24 2023 CaoInfrastructureVACCooling down vacuum chamber[Cao]

 
After leaving the the chamber
to bake at 120 deg C from Thursday 3:41 pm.
Today I started to cool the chamber down
  
  142   Mon Jul 3 16:26:21 2023 CaoInfrastructureDAQAccess and control Red Pitaya remotely and run it on local machine[Cao]


To access and control the Red
Pitaya using Python locally on a machine
within the local network, one should follow
  
  97   Fri May 12 20:28:34 2023 Aiden, CaoPhysicsVACVacuum chamber Helium leak test [Aiden, Cao] 

 
 1. Helium leak test 


2:00 pm: Uninstall regulator from nitrogen
 PXL_20230512_211717602.jpgArLeak_230512.png 
  145   Wed Jul 5 15:46:47 2023 Aiden, CaoInfrastructureVACVacuum Chamber Baking Update
Cao and Aiden put the RGA back on to
the chamber and measured the outgassing rate
after the chamber has cooled down from its
 bake1_230705.png 
  17   Thu Jan 26 18:58:25 2023 AidenUpdateGeneralOven HeatingAiden cleaned the oven with methanol again
and set the oven to 260 degC for 12 hours.
  
  23   Tue Feb 7 17:27:30 2023 AidenPhysicsELOGClean and Bake Batch #1Cleaned SS parts with liquinox for 20 min.
Then put in oven for 5 steps;
1. Ramp, 100
degC, 15 min
2. Const, 100 degC, 30 min
3.
  
  25   Fri Feb 10 15:15:30 2023 AidenUpdateGeneralBagging First BatchAiden Bagged and Tagged the first batch of
stainless steel parts shown on the google
spread sheet. 
1. Removed two parts from
  
  29   Mon Feb 13 18:57:53 2023 AidenSummaryGeneralClean and Bake batch 2Cleaned second batch of SS parts with liquinox
for 20 min. Then put in oven for 5 steps;
1. Ramp, 100 degC, 15 min 2. Const, 100 degC,
  
  30   Fri Feb 17 19:12:39 2023 AidenUpdateGeneralClean and Bake batch 3Bagged and Tagged batch 2 parts by placing
no more than two parts per ESD bag then taped
them with kapton tape and tagged them with
 IMG_4126.jpgIMG_4125.jpg 
  31   Tue Feb 21 17:51:04 2023 AidenSummaryGeneralClean and Bake batch 4Bagged and Tagged batch 3 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4148.jpgIMG_4147.jpg 
  38   Tue Feb 28 19:37:22 2023 AidenSummaryGeneralClean and Bake batch 5Bagged and Tagged batch 4 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4168.jpgIMG_4169.jpgIMG_4170.jpg 
  42   Fri Mar 3 19:13:33 2023 AidenSummaryGeneralClean and Bake Batch 6Started to clean the dirtiest of the valves.
I could not finish but I definitely made
good progress on it. The MDC valve is very
 IMG_4173.jpgIMG_4174.jpg 
  47   Wed Mar 8 19:29:00 2023 AidenSummaryGeneralClean and Bake batch 7Today gave another cleaning to the MDC gate
valve. It is still very dirty an will need
more cleaning. I also cleaned the other 3
 IMG_4180.jpgIMG_4182.jpg 
  51   Tue Mar 14 18:21:41 2023 AidenSummaryGeneralClean and Bake batch 8Starting off Peter and I refilled the deionized
water barrel.

Then Aiden Cleaned and Bake
the FROSTI arms and bases in liquinox for
  
  52   Fri Mar 17 19:46:39 2023 AidenSummaryGeneralClean and Bake batch 9Bagged and Tagged the reflector arms and bases
and placed them inside the clean room. Total
of 2 bags used. Cleaned and Baked parts in
 IMG-4208.jpgIMG-4209.jpg 
  60   Mon Apr 3 17:04:05 2023 AidenSummaryGeneralIDP Scroll Pump AssemblyAiden installed the isolation valve and the
exhaust silencer kits on the IDP-3 Scroll
pump. The entire assembly still needs to
 IMG_4244.jpg 
  69   Wed Apr 12 10:53:02 2023 AidenSummaryGeneralValve CleaningBagged and Tagged the parts from batch 10
and placed them inside the clean room. 

Then
cleaned the last gate valve in liquinox for
  
  72   Mon Apr 17 17:06:49 2023 AidenSummaryGeneralClean and Bake batch 11Cleaned the Viton O-Ring for the main chamber
in Liquinox for 10 minutes. Then put it in
the oven to back for;

1. Ramp to 100 degC
 IMG_4262.jpg 
  77   Mon Apr 24 17:38:45 2023 AidenSummaryGeneralClean and Bake Batch 12Today I Bagged and tagged the o-rings from
batch 11 and placed them inside the clean
room. I also cleaned batch 12 parts in liquinox
 IMG_4269.jpgIMG_4268.jpg 
  80   Thu Apr 27 09:48:34 2023 AidenSummaryGeneralBatch 12 BaggingI took batch 12 out of the oven and put them
in a bag and placed the bag inside the clean
room in the first large stainless steel container.

I
 IMG_4279.jpgIMG_4278.jpg 
  96   Wed May 10 10:49:34 2023 AidenUpdateGeneralRGA Software[Aiden, Cao]

Went over how to use the RGA
software, how to change the graph units,
scaling and mass detection. Also went over
  
  111   Wed May 31 16:18:41 2023 AidenSummaryGeneralMock FROSTIFinished assembly on the Mock FROSTI so it
is ready for the fit test at LIGO lab.
 IMG_4394.jpg 
  115   Tue Jun 6 16:04:46 2023 AidenUpdateGeneralWaterAiden went and refilled the de-ionized water
to continue clean and bake batches.
  
  121   Tue Jun 13 13:25:05 2023 AidenSummaryClean & BakeClean and Bake Batch 13Cleaned and Baked the new 1.33" and 2.75"
blanks for the vacuum system. Cleaned them
with liquinox in the ultra sonic washer for
  
  126   Fri Jun 16 17:40:28 2023 AidenUpdateClean & BakeClean and Bake Batch 14Cleaned and Baked the new and 2.75" copper
gaskets for the vacuum system. Cleaned them
with liquinox in the ultra sonic washer for
 IMG_4441.jpgIMG_4440.jpg 
  146   Wed Jul 5 16:02:12 2023 AidenUpdateClean & BakeClean and Bake batch 14 BaggingBagged and Tagged the 2.75" copper gaskets
from Batch 14 and placed them into the clean
room on the work bench.
  
  148   Thu Jul 6 16:16:03 2023 AidenSummaryVACVacuum Chamber Baking Update
Pressure Measured Before Removing Gauge
2.31 E-7 Torr.


Went in and turned
on the heating tape in increments of 30 degC
  
  150   Fri Jul 7 15:11:39 2023 AidenUpdateVACVAC System Heating Update
The temperature of the flange connecting
to the turbo pump after reaching equilibrium
is 74 degC. This means that it is safe to
  
  152   Mon Jul 10 13:23:23 2023 AidenUpdateVACVAC System Heating Update
Checked on the system today. 


The
flange on the turbo pump has reached an equilibrium
temperature of 87 degC when set at 150 degC.
  
  153   Thu Jul 13 14:56:43 2023 AidenUpdateVACVAC System Heating Update
Checked on the vacuum system today to
change the PID controls back to their default
values in order to try and get the temperature
  
  156   Fri Jul 14 14:37:25 2023 AidenUpdateVACVAC System Heating Update
Checked on the vacuum system and it looks
like it will either need to be increased
in temperature or baked for a longer time.
  
  160   Mon Jul 17 13:50:41 2023 AidenUpdateVACVAC System Heating Update
Started to cool down the chamber today.
Final temperature readings of the chamber
were 146C and 91C for the body and cross
  
  161   Mon Jul 17 14:01:41 2023 AidenUpdateVACVAC System Heating Update
The insulation on the lid of the vacuum
chamber has some discoloration and it may
be wise to place a sensor closer to this
 IMG_4535.jpg 
  168   Thu Jul 20 18:03:19 2023 AidenUpdateVACVacuum Chamber Baking Update
Took another set of RGA data after the
second bake has cooled down to 27 degC.


Just
by visual comparison to the other graphs,
 bake2_230720.png 
  179   Fri Jul 28 13:46:17 2023 AidenUpdateVACVacuum Chamber Baking Update
Took some more data to look at the HC
count. Initial data was from leaving the
Argon leak closed and then left it open for
 bake2_230720_ArC.pngbake2_230720_ArO.pngbake2_230728_Closed_Open.pngbake2_230728_Open_Open.png 
  184   Tue Aug 1 12:10:03 2023 AidenUpdateVACVacuum Chamber Baking Update
Dr. Richardson and I took off the insulation
on the lid again to add more insulation in-between
the heater tape folds in addition to what
 bake2_230801_ArC.pngbake2_230801_ArO.pngbake2_230801_Closed_Open.png 
  185   Tue Aug 1 12:48:41 2023 AidenUpdateCleanroomPre Filter Change
Changed the pre filter inside of the
3 stage HEPA system next to the soldering
station. It was rather dirty and I have attached
 IMG_4564.jpgIMG_4563.jpgIMG_4562.jpg 