ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 8 of 13  Not logged in ELOG logo
ID Date Authordown Type Category Subject Text Attachments
  430   Tue Aug 27 18:37:40 2024 LukeUpdateInterferometer SimulationsRingheater model updateUpdated the model to produce a more circular
deformation in the HR surface. The first
three attachments are from irradiance patterns
 Initial_1W.pngIncreased_rays_100W.pngIncreased_rays_more_100W.pngInitial_100W.png 
  431   Thu Aug 29 16:39:34 2024 LukeUpdateVACPhotos of heater tape   6x 
  432   Sun Sep 1 16:17:40 2024 LukeUpdateVACVacuum chamber leak checking and re-applying heating tape[Luke, Luis, Cinthia, Michal, Tyler]
On the 26th Cinthia, Michal, and
I took off the insolation on the vacuum chamber
  
  433   Tue Sep 3 15:52:56 2024 LukeUpdateVACHeater tape initilization [Luke, Tyler, Jon]
On the 3rd we set up the pid controllers
for the heater tapes and after putting on
  
  438   Mon Sep 9 21:02:37 2024 LukeUpdateVACSteadystate temperature of flangesI measured the temperature of the flanges
and reconnected the RGA turning on its filament.
I then turned off the PID controllers.
  
  439   Mon Sep 16 07:28:16 2024 LukeUpdateInterferometer SimulationsRing heater update   20240916_Ringheater_updates.pptx 
  444   Mon Sep 23 08:29:49 2024 LukeUpdateInterferometer SimulationsRingheater update
Ringheater
Update
If the link does not work here is
 20240923_Update.pptx 
  481   Sat Nov 30 12:41:42 2024 LukeUpdateVACVacuum bake endThe
vacuum chamber has stopped bakeing. 
Current state as of 12:10, 11/30/2024:
  
  493   Thu Dec 19 12:00:44 2024 LukeUpdateVACEnd of bakeThe
vacuum chamber has stopped baking. 
Current state as of 11:40, 12/19/2024:
  
  581   Mon May 26 11:15:28 2025 LukeUpdateScripts/ProgramsUpdate to optimization plotsI have created some new optimization plots.
I have also started on a model like the previous
Desmos model, but in python. 
Slides
  
  268   Thu Nov 16 17:12:42 2023 Luis, Shane, MohakUpdateCleanroomCleanroom cleaning and particle count


[Shane, Luis,
Mohak]


cleaning cleanroom and
particle count
  
  425   Fri Aug 16 12:51:46 2024 Luis MartinUpdateVACUpdate on vacuum chamber status[Luis, Luke, Tyler]

Vacuum chamber parts were finally
received and assembled. After whipping down
 IMG_1910.HEICIMG_1911.HEICIMG_1909.HEICIMG_1912.HEIC 
  440   Mon Sep 16 13:51:23 2024 Luis MartinUpdateVACRGA Scans



   
    


 2024-09-11_PostBake1_ArO.png2024-09-13_PostBake1_ArO.png2024-09-16_PostBake1_ArO.png 
  448   Wed Sep 25 09:06:09 2024 Luis MartinUpdateVACRGA Scans



   
    
 24overlay.png24overlayNormalized.png 
  459   Wed Oct 16 13:58:59 2024 Luis MartinUpdateVACRGA ScanThe following figure displays data acquired
on 10/09, and it shows that we are no longer
below the cleanliness standard. Also, the
 2024-10-09_PostBake1_ArO.png 
  462   Wed Oct 23 11:48:06 2024 Luis MartinUpdateVACLeak Test Results[Luke, Luis, Mary, Ma]
 On 10/22/24 Luke, Ma, Mary and myself
ran a leak test, the results are displayed
  
  463   Wed Oct 23 12:08:36 2024 Luis MartinUpdateVACRGA Scan[Luke, Luis, Mary, Ma]
 On 10/22/24 Luke, Ma, Mary and myself
ran a RGA scan, the results are displayed
 2024-10-22_PostBake1_ArO.png 
  467   Tue Nov 5 09:56:04 2024 Luis MartinUpdateClean & BakeMR Bake    [Luke, Luis]
    
        On Friday, 11/1/24,
the MR was unpackaged and cleaned under the
  
  468   Tue Nov 5 11:08:40 2024 Luis MartinUpdateVACISO Test
    [Luis, Luke, Ma Michael]
    
        The isolation test
was conducted on the vacuum system. Every
  
  485   Thu Dec 5 10:31:13 2024 Luis UpdateVACRGA Scan and RGA updates



   
    


 2024-12-04_PostBake2_ArO.png 
  476   Wed Nov 20 12:31:24 2024 LuisUpdateVACLeak test RGA Scan after vacuum repairs[Luke, Luis]
After the gasket replacement performed
on Monday (11/18/24) we let the vacuum pump
 2024-11-20_PostBake1_ArO.png 
  487   Wed Dec 11 16:06:05 2024 LuisUpdateVACRGA Status[Luis]

 I rebooted Spica and I
was able to connect the RGA again. After
Connecting the RGA, I left the filament on.
  
  488   Thu Dec 12 13:06:39 2024 LuisUpdateVACRGA Scan and vacuum system updates    [Luis, Luke]
    
        RGA Volume:
T = 21°C, P = 1.74e-9 Torr
 2024-12-12_PostBake2_ArC.png2024-12-12_PostBake2_ArO_overlay.png 
  489   Sat Dec 14 07:58:25 2024 LuisUpdateVACVacuum sytem staus and Viton O-rings  [Luis]
        RGA Volume:
T = 23°C, P = 1.71e-9 Torr
        Main Volume:
 2024-12-12_PostBake2_ArO_overlay.png 
  490   Mon Dec 16 21:32:21 2024 LuisUpdateVACMR Testing[Luis, Luke]

The MR material was
placed in the vacuum chamber following standard
procedures to ensure the vacuum remained
 IMG_6011.HEIC 
  491   Tue Dec 17 13:53:53 2024 LuisUpdateVACVacuum system status [Luis]

 The vacuum system is being
baked. I disconnected the digital gages and
the magnets, opened the Ar leak and started
  
  494   Sun Dec 22 20:43:35 2024 LuisUpdateVACMR Testing[Luis, Luke]
        RGA Volume:
T = 23°C, P = 3.0e-9 Torr
        Main Volume:
 2024-12-13_PostBake2_ArO_Degas_overlay.png2024-12-22_MR-Bake1_ArO.png 
  496   Thu Jan 2 17:52:58 2025 LuisUpdateVACMR Testing Continuation [Luis, Luke]
        RGA Volume:
T = 22°C, P = 2.10e-9 Torr
        Main Volume:
 2024-12-16_PostBake2_ArO_overlay.png2025-1-2_MR-Bake1_ArO.png2025-1-2_MR-Bake1_ArC_overlay.png 
  510   Tue Feb 11 08:07:02 2025 LuisUpdateVACBake stopped [Luis, Ma]
        Feb/10/25 4:00pm

        Bake was stopped.
  
  511   Fri Feb 14 11:57:50 2025 LuisUpdateVACVacuum Update[Luis]
        Feb/11/25 9:30am

        Pressure gages were connected.
  
  512   Fri Feb 14 12:15:23 2025 LuisUpdateVACVacuum sytem staus
    [Luis, Luke, Ma]
    February 12, 2025 - 4:00
PM
 2025-2-12_HeaterElement-Bake1_ArC.png2025-2-12_HeaterElement-Bake1_ArO.png 
  519   Thu Feb 20 17:07:36 2025 LuisUpdateVACRGA Scan [Ma, Luis]
    February 20, 2025 - 3:30
PM
 2025-2-20_HeaterElement_ArO.png 
  522   Mon Feb 24 17:50:13 2025 LuisUpdateVACRGA Scan [Ma, Luis]
    February 24, 2025 - 1:00PM

    Ma performed an RGA scan with
 2025-2-24_HeaterElement_ArO.png 
  563   Mon Apr 28 22:08:28 2025 LuisUpdateVACVacuum Leak Test result[Ma, Luke, Luis]

April 24, 2025

3:00 PM
  
  566   Wed Apr 30 15:43:56 2025 LuisUpdateVACVacuum Update[Ma, Luke, Luis]

April 29, 2025

3:30 PM
 2025-4-29_HeaterElement-Bake1_ArO.png2025-2-24_HeaterElement_ArO.png 
  573   Thu May 8 17:41:56 2025 LuisUpdateVACRGA Scan Post Bake [Ma, Luis]
    After taking the RGA scans of
the new system, here are the results of the
 2025-4-29_HeaterElement-Bake1_ArO_overlay.png2025-4-29_HeaterElement-Bake1_ArO_overlayNormalized.png 
  376   Fri Jun 14 13:32:13 2024 LiuUpdateScripts/ProgramsCOMSOL simulation on rectangular heater elements designI have been looking at the feasibility
of an alternative heater element design for
FROSTI that replaces the original ring-like
 6x 
  377   Mon Jun 17 11:47:46 2024 LiuInfrastructureGeneralTemporary cooling units for the labsBelow are the temporary cooling units installed
last week in labs 1119 and 1129. They are
the temp. replacement for the building AC
 1119.jpg1129.jpg 
  380   Fri Jun 21 11:47:30 2024 LiuUpdateScripts/ProgramsCOMSOL simulation on alternative straightened heater elements design In the previous post, we saw
that for the heater element design with straight
 6x 
  387   Thu Jun 27 11:09:14 2024 LiuUpdateScripts/ProgramsStraight edge STEP files and ray loss analysis Drawings and CAD models of the straight-edge
designs are exported, and are visualized
in SOLIDWORKS. Two are attached. One is a
 edge_CAD_8x2_step.PNGedge_CAD_step.PNGIrradiance_frontheater.pngIrradiance_profile.pdf 
  393   Fri Jul 5 13:17:44 2024 LiuUpdateInterferometer SimulationsFour-quadrant FROSTI-like RH for astigmatic thermal actuation for CE opticsIn the CE corner layout design and down selection
study, interferometer layouts with large
incidence angles on some of the curved optics
 7x 
  394   Fri Jul 5 14:12:32 2024 LiuUpdateInterferometer SimulationsCE BS Mechanical ResonancesThe butterfly and drumhead mechanical modes
for the aLIGO BS were calculated in COMSOL.
The resonant frequencies for the two acoustic
 butterfly.pngdrumhead.png 
  395   Fri Jul 5 14:23:13 2024 LiuUpdateInterferometer SimulationsEngineering drawings for straight edge heater element designs for FROSTIStep files and engineering drawings for the
straight edge heater element designs have
been created in COMSOL and SolidWorks. They
  
  404   Mon Jul 15 09:36:44 2024 LiuUpdateInterferometer SimulationsETM Profile Optimization for FROSTI This is to optimize the FROSTI heating
profile for ETM, by minimizing the residual
RMSE of the HR surface deformation after
 pdf_merged.pdf 
  413   Mon Jul 29 12:18:52 2024 LiuUpdateInterferometer SimulationsUpdate on FROSTI O5 ETM profile optimizationUpdate on FROSTI O5 ETM profile optimization
is attached. 
 pdf_merged.pdf 
  414   Mon Jul 29 12:20:56 2024 LiuUpdateInterferometer SimulationsUpdate on wavefront actuation with astigmatically driven RH for CEUpdate on wavefront actuation with astigmatically
driven RH for CE is attached. 
 SURF_nonastig_merged.pdf 
  415   Mon Jul 29 12:23:10 2024 LiuUpdateInterferometer SimulationsUpdate on mechanical resonances of CE BS with stiffener ringUpdate on mechanical resonances of CE BS with
stiffener ring is attached. 
 eigen_freqs_merged.pdf 
  455   Wed Oct 2 14:49:59 2024 LiuUpdate FROSTI ETM actuationProposed FROSTI ETM actuation on the HOM7
resonance.  

Animation
  
  460   Wed Oct 16 14:13:31 2024 LiuUpdate FROSTI with non uniform absorption scattering sourcesSlides   
  469   Wed Nov 6 13:48:55 2024 LiuUpdateInterferometer SimulationsQN modeling updateSlides   
ELOG V3.1.3-7933898