ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 8 of 11  Not logged in ELOG logo
Entry  Mon Jul 17 11:46:24 2023, Pamella, Update, FLIR, Thermocouple plot. calibration_plot-2.jpegcalibration_plot-3.jpeg
Entry  Tue Jul 18 16:04:26 2023, Pamella, Update, FLIR, Setup FLIR with black wall (black body) AcquisitionImage(Jul-18-2023_15_24).jpgIMG_8721.jpegIMG_8722.jpeg
    Reply  Tue Jul 18 16:12:27 2023, Pamella, Update, FLIR, Thermocouple plot. Comp.plot.jpeg
    Reply  Tue Jul 18 16:35:06 2023, Pamella, Update, FLIR, Plot-Data with the new configuration without the mask and reflector. Gauss.plot.jpeg
Entry  Wed Jul 19 19:10:31 2023, Pamella, Update, FLIR, Data plot FLIR and updates. 8x
Entry  Thu Jul 20 21:00:23 2023, Pamella, Update, FLIR, Data plot FLIR and updates about the black body AcquisitionImage(Jul-20-2023_13_09).jpgAcquisitionImage(Jul-20-2023_13_15).jpgAcquisitionImage(Jul-20-2023_13_33).jpgAcquisitionData-480(Jul-20-2023_SIsolated_Plot.pngGauss.plot-2.jpeg
Entry  Fri Jul 28 18:03:07 2023, Pamella, Update, FLIR, Final plot - FLIR 29Combined_HighTemp_Gaussian_Plot.jpg3Combined_HighTemp_Gaussian_Plot.jpgcalibration_plot(2).png
Entry  Tue Feb 13 11:54:45 2024, Tyler, Configuration, FLIR, In-Air Optical Test Configuration In-air_optical_test_sketch.png
Entry  Fri Feb 23 18:03:27 2024, Tyler, Update, FLIR, Optical Test Setup in Cleanroom IMG_0941.png
Entry  Tue Mar 19 10:55:30 2024, Tyler, Update, FLIR, In-Air Optical Test FroSTI_Thermal_Profile.png
Entry  Mon May 13 13:03:41 2024, Tyler, Update, FLIR, Readout Code Updates AcquisitionImage(Jul-18-2023_15_24).jpg.png
Entry  Mon Jun 3 14:14:39 2024, Tyler, Update, FLIR, Initial CIT FROSTI Analysis  CIT_FROSTI_Analysis_Group_Meeting-2.pdf
    Reply  Mon Jun 10 14:52:38 2024, Tyler, Update, FLIR, CIT FROSTI Analysis Update FROSTI_HR_Temperature_Difference-7.png
Entry  Mon Jul 8 10:39:14 2024, Xuejun, Update, FLIR, Average Temperature Profile Average-Temperature-Profile.pdf
Entry  Wed Dec 14 18:34:33 2022, Jon, Configuration, Electronics, Adapter for 532 nm laser power supply laser_power.png
Entry  Tue Jun 20 17:28:23 2023, Pamella, Update, Electronics, Heater system parts - Wiped  IMG_7696.jpg
Entry  Mon Jul 24 16:19:29 2023, Shane, Jon, Update, Electronics, Chassis semi-assembled and moved IMG_8386.pdf
Entry  Tue Jul 25 15:35:14 2023, Shane, Update, Electronics, More chassis moved IMG_8409.HEIC
Entry  Thu Jul 27 14:46:55 2023, Shane, Jon, Update, Electronics, AA chassis DC on/off switch assembled 
Entry  Mon Jul 31 12:39:01 2023, Shane, Update, Electronics, LED cable assemblies installed  IMG_8514.jpegIMG_8516.jpeg
Entry  Mon Oct 9 11:29:37 2023, Tyler, Update, Electronics, PSD/CSD Plot Updates Screenshot_2023-10-09_at_11.20.25_AM.pngwelch_csd-2.png
Entry  Mon Nov 6 11:29:24 2023, Tyler, Update, Electronics, Preliminary RTD Calculations, RP Software Update cvt.pngVvC.pngIMG_7471.jpg
Entry  Mon Nov 20 10:10:50 2023, Tyler, Configuration, Electronics, RTD Logic/Schematic Diagrams FIN_RTD_circuit.pngSample_Circuit_Schematic.png
    Reply  Fri Dec 29 16:02:27 2023, Jon, Configuration, Electronics, RTD Readout Chassis front.jpegrear.jpegoverhead.jpeg
    Reply  Tue Jan 9 12:08:59 2024, Tyler, Configuration, Electronics, RTD Readout Chassis Update IMG_8105.jpg
    Reply  Tue Jan 16 12:20:21 2024, Tyler, Configuration, Electronics, RTD Readout Chassis Update 2 IMG_8146.jpgIMG_8147.jpg
Entry  Tue Jan 23 12:17:41 2024, Tyler, Update, Electronics, RTD Chassis rtd_updated_circuitry.jpg
    Reply  Tue Jan 30 11:36:19 2024, Tyler, Update, Electronics, RTD Chassis 
Entry  Thu May 2 22:43:36 2024, Tyler, Update, Electronics, RTD Readout Chassis Redesign IMG_9013.jpg
Entry  Tue Oct 29 16:37:35 2024, Tyler, Update, Electronics, Red Pitaya OS Update 
Entry  Wed Nov 13 14:03:32 2024, Tyler, Update, Electronics, RIN Update IMG_0463.jpgCH0_CH1_ASDs.pdf
Entry  Wed Nov 20 12:59:37 2024, Tyler, Update, Electronics, RIN Update ASD_plots.pdf
Entry  Wed Nov 27 13:48:01 2024, Tyler, Update, Electronics, RIN Update New_ASD_plots.pdf
Entry  Wed Dec 11 13:39:30 2024, Tyler, Update, Electronics, RIN Update 12/11/2024 Updated_ASD_plots.pdf
Entry  Mon Mar 10 21:32:29 2025, Nathan, Physics, Electronics, Beam Profiling and PBS Measurements Beam_Profiling_2_20_(2).pdfbeamprfl.pngthumbnail_(6).jfif
Entry  Mon Nov 28 18:10:23 2022, shane, Update, ELOG, Particle counts in the clean room clean_room_particle_counts_11_28_-_Sheet1.pdf
Entry  Wed Jan 18 22:06:05 2023, Julian, Update, ELOG, Cleanroom Update 
Entry  Tue Feb 7 17:27:30 2023, Aiden, Physics, ELOG, Clean and Bake Batch #1 
Entry  Tue Oct 15 15:27:38 2024, Xuesi Ma, Update, ELOG, Timing Chassis Update 12x
Entry  Tue Mar 4 03:05:42 2025, Xuesi Ma, Update, ELOG, LOG 
Entry  Mon Jul 3 16:26:21 2023, Cao, Infrastructure, DAQ, Access and control Red Pitaya remotely and run it on local machine 
Entry  Thu Mar 21 16:56:42 2024, Tyler, Update, DAQ, RTD Parameter Calibration RTD_Calib-2.pngIMG_8569.jpg
    Reply  Mon Mar 25 10:55:33 2024, Tyler, Update, DAQ, RTD Parameter Calibration RTD_Calib_nobeta.png
    Reply  Tue Mar 26 13:51:56 2024, Tyler, Update, DAQ, RTD Parameter Calibration Screenshot_2024-03-26_at_1.23.27_PM.png
    Reply  Mon Jul 29 13:39:16 2024, Tyler, Update, DAQ, RTD Parameter Calibration RTD_Recal_params.pngRTD_recal_plots_fin.png
Entry  Wed Dec 14 17:35:41 2022, Jon, Infrastructure, Computers, Windows Laptop laptop.png
Entry  Tue Feb 7 17:44:17 2023, Jon, Infrastructure, Computers, Workstation 1 (ws1) set up ws1.jpg
Entry  Wed Mar 1 21:50:46 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart ws2_cart-1.jpegws2_cart-2.jpeg
    Reply  Fri Mar 24 07:14:38 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart 
Entry  Sun May 14 15:50:48 2023, Cao, Infrastructure, Computers, High resolution display of logrus machine 
ELOG V3.1.3-7933898