Mon Mar 10 21:13:12 2025, Nathan, Update, VLC Update, PDH Lock Progress and Next Steps   
|
Tue Apr 8 20:04:35 2025, Nathan, Update, VLC Update, PDH Lock Progress 
|
Wed Mar 1 21:27:20 2023, Jon, Infrastructure, Cleanroom, Over-table shelf height raised
|
Mon Jan 23 17:26:15 2023, Peter Carney, Update, General, Oven cleaning
|
Thu Jan 26 18:58:25 2023, Aiden, Update, General, Oven Heating
|
Fri Feb 23 18:03:27 2024, Tyler, Update, FLIR, Optical Test Setup in Cleanroom
|
Tue Jul 26 14:10:35 2022, Cassidy, Update, Cameras, Optical Post Replacement and Realignment  
|
Thu Feb 27 18:22:21 2025, Shane, Update, CDS, Ongoing work in server rack and desk area (1119)
|
Tue Sep 30 12:51:23 2025, Tyler, Update, TCS, O6 RH Update 09/30/2025
|
Tue Aug 26 13:09:03 2025, Tyler, Update, TCS, O6 RH Update
|
Mon Aug 12 17:09:04 2024, Cynthia , Update, Interferometer Simulations, O4 vs O5 cavity scans with ITM plume guess or ETM   
|
Mon Jul 1 15:19:42 2024, Cynthia , Update, Interferometer Simulations, O4 and O5 mirror cavity scans with thermal effect
|
Thu May 15 12:03:41 2025, Xuesi Ma, Infrastructure, Electronics, Notice
|
Tue Apr 11 13:15:40 2023, Cao, Infrastructure, Clean & Bake, Nitrogen gas tank replaced
|
Fri Feb 10 16:34:45 2023, Huy Tuong Cao, Infrastructure, Clean & Bake, Nitrogen gas tank ready to use
|
Fri Jul 26 17:25:42 2024, Jon, Infrastructure, Computers, New workstation ws4 installed in 1129
|
Thu Jun 20 18:01:11 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129
|
Wed Jun 26 15:33:41 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129
|
Wed Aug 9 11:32:56 2023, Jon, Infrastructure, General, New power cables
|
Fri Apr 25 19:18:10 2025, Luke , Update, Scripts/Programs, New optimization plots 
|
Sun May 11 19:36:42 2025, Luke , Update, Scripts/Programs, New optimization plots
|
Tue Sep 2 18:33:38 2025, Liu, Infrastructure, General, New lab room 1125 layout and measurement
|
Tue Jun 27 15:18:26 2023, Pamella, Update, FLIR, New data collection 
|
Tue Jun 13 21:33:46 2023, Pamella, Update, General, New cabinet for PPI
|
Fri Jul 14 16:49:42 2023, Pamella, Update, FLIR, New bridge and calibration data
|
Mon May 13 14:48:27 2024, Aiden, Update, VAC, New Vacuum Chamber Design
|
Mon Jul 8 17:01:45 2024, Shane, Update, CDS, New CyMAC internal layout
|
Tue May 30 14:51:27 2023, Pamella, Update, FLIR, New 3D mask - Bigger triangles shapes. 
|
Tue Sep 9 12:13:38 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A# with grid search
|
Tue Jul 29 11:27:57 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#  
|
Tue Aug 12 12:16:21 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
|
Tue Sep 23 12:39:29 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
|
Thu Oct 9 12:18:14 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
|
Tue Aug 26 12:14:24 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI design for A# with ring heater optimization
|
Tue Sep 2 12:41:33 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI design for A# with ring heater optimization
|
Tue Jul 25 15:35:14 2023, Shane, Update, Electronics, More chassis moved
|
Wed May 3 19:03:47 2023, Julian,Pamella and Cao, Physics, VAC, Modify vacuum asssembly and install RGA
|
Wed May 31 16:18:41 2023, Aiden, Summary, General, Mock FROSTI
|
Mon Jul 8 12:26:10 2024, Michael, Update, Interferometer Simulations, Minimizing Astigmatic Effects in the SRC of LIGO
|
Tue Jul 29 11:45:19 2025, Maple, Update, TCS, Meeting update
|
Sat Feb 24 08:53:38 2024, Jon, Infrastructure, Computers, Matlab upgraded to 2023b on Chimay
|
Thu Jan 2 17:52:58 2025, Luis, Update, VAC, MR Testing Continuation  
|
Mon Dec 16 21:32:21 2024, Luis, Update, VAC, MR Testing
|
Sun Dec 22 20:43:35 2024, Luis, Update, VAC, MR Testing 
|
Tue Nov 5 09:56:04 2024, Luis Martin, Update, Clean & Bake, MR Bake
|
Mon Feb 19 14:40:21 2024, Shane, Update, CDS, MEDM screen for FROSTI temp readouts 
|
Thu Feb 29 17:16:48 2024, Shane, Update, CDS, MEDM screen for FROSTI T/P readouts
|
Wed Jun 11 16:33:45 2025, Pooyan, Update, Computers, Luke's ray tracing hosting
|
Wed Feb 21 23:15:07 2024, Michael, Update, Interferometer Simulations, Long Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in Beamsplitter  
|
Tue Feb 6 22:40:25 2024, Michael, Update, Scripts/Programs, Long Crab 1 Design Created In Gtrace 
|
|