ligo-ex
ligo-ds
Richardson Lab Experimental Log, Page 7 of 13
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Infrastructure
Physics
-- Category --
General
CDS
TCS
VAC
DAQ
Safety
Computers
Scripts/Programs
Electronics
Cameras
Wiki
ELOG
Equipment Loan
Lore
VLC Electronics
Clean & Bake
Cleanroom
VLC Update
FLIR
Measuring Noise in Interferometer
Interferometer Simulations
640 Entries
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
...
11
,
12
,
13
Next
Mon Mar 10 21:13:12 2025, Nathan, Update, VLC Update, PDH Lock Progress and Next Steps
Tue Apr 8 20:04:35 2025, Nathan, Update, VLC Update, PDH Lock Progress
Wed Mar 1 21:27:20 2023, Jon, Infrastructure, Cleanroom, Over-table shelf height raised
Mon Jan 23 17:26:15 2023, Peter Carney, Update, General, Oven cleaning
Thu Jan 26 18:58:25 2023, Aiden, Update, General, Oven Heating
Fri Feb 23 18:03:27 2024, Tyler, Update, FLIR, Optical Test Setup in Cleanroom
Tue Jul 26 14:10:35 2022, Cassidy, Update, Cameras, Optical Post Replacement and Realignment
Thu Feb 27 18:22:21 2025, Shane, Update, CDS, Ongoing work in server rack and desk area (1119)
Tue Sep 30 12:51:23 2025, Tyler, Update, TCS, O6 RH Update 09/30/2025
Tue Aug 26 13:09:03 2025, Tyler, Update, TCS, O6 RH Update
Mon Aug 12 17:09:04 2024, Cynthia , Update, Interferometer Simulations, O4 vs O5 cavity scans with ITM plume guess or ETM
Mon Jul 1 15:19:42 2024, Cynthia , Update, Interferometer Simulations, O4 and O5 mirror cavity scans with thermal effect
Thu May 15 12:03:41 2025, Xuesi Ma, Infrastructure, Electronics, Notice
Tue Apr 11 13:15:40 2023, Cao, Infrastructure, Clean & Bake, Nitrogen gas tank replaced
Fri Feb 10 16:34:45 2023, Huy Tuong Cao, Infrastructure, Clean & Bake, Nitrogen gas tank ready to use
Fri Jul 26 17:25:42 2024, Jon, Infrastructure, Computers, New workstation ws4 installed in 1129
Thu Jun 20 18:01:11 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129
Wed Jun 26 15:33:41 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129
Wed Aug 9 11:32:56 2023, Jon, Infrastructure, General, New power cables
Fri Apr 25 19:18:10 2025, Luke , Update, Scripts/Programs, New optimization plots
Sun May 11 19:36:42 2025, Luke , Update, Scripts/Programs, New optimization plots
Tue Sep 2 18:33:38 2025, Liu, Infrastructure, General, New lab room 1125 layout and measurement
Tue Jun 27 15:18:26 2023, Pamella, Update, FLIR, New data collection
Tue Jun 13 21:33:46 2023, Pamella, Update, General, New cabinet for PPI
Fri Jul 14 16:49:42 2023, Pamella, Update, FLIR, New bridge and calibration data
Mon May 13 14:48:27 2024, Aiden, Update, VAC, New Vacuum Chamber Design
Mon Jul 8 17:01:45 2024, Shane, Update, CDS, New CyMAC internal layout
Tue May 30 14:51:27 2023, Pamella, Update, FLIR, New 3D mask - Bigger triangles shapes.
Tue Sep 9 12:13:38 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A# with grid search
Tue Jul 29 11:27:57 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
Tue Aug 12 12:16:21 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
Tue Sep 23 12:39:29 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
Thu Oct 9 12:18:14 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI optimization for A#
Tue Aug 26 12:14:24 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI design for A# with ring heater optimization
Tue Sep 2 12:41:33 2025, Liu, Update, Interferometer Simulations, Multi-ring FROSTI design for A# with ring heater optimization
Tue Jul 25 15:35:14 2023, Shane, Update, Electronics, More chassis moved
Wed May 3 19:03:47 2023, Julian,Pamella and Cao, Physics, VAC, Modify vacuum asssembly and install RGA
Wed May 31 16:18:41 2023, Aiden, Summary, General, Mock FROSTI
Mon Jul 8 12:26:10 2024, Michael, Update, Interferometer Simulations, Minimizing Astigmatic Effects in the SRC of LIGO
Tue Jul 29 11:45:19 2025, Maple, Update, TCS, Meeting update
Sat Feb 24 08:53:38 2024, Jon, Infrastructure, Computers, Matlab upgraded to 2023b on Chimay
Thu Jan 2 17:52:58 2025, Luis, Update, VAC, MR Testing Continuation
Mon Dec 16 21:32:21 2024, Luis, Update, VAC, MR Testing
Sun Dec 22 20:43:35 2024, Luis, Update, VAC, MR Testing
Tue Nov 5 09:56:04 2024, Luis Martin, Update, Clean & Bake, MR Bake
Mon Feb 19 14:40:21 2024, Shane, Update, CDS, MEDM screen for FROSTI temp readouts
Thu Feb 29 17:16:48 2024, Shane, Update, CDS, MEDM screen for FROSTI T/P readouts
Wed Jun 11 16:33:45 2025, Pooyan, Update, Computers, Luke's ray tracing hosting
Wed Feb 21 23:15:07 2024, Michael, Update, Interferometer Simulations, Long Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in Beamsplitter
Tue Feb 6 22:40:25 2024, Michael, Update, Scripts/Programs, Long Crab 1 Design Created In Gtrace
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
...
11
,
12
,
13
Next
ELOG V3.1.3-7933898