ID Date Author Type Category Subjectdown Text Attachments
  536   Mon Mar 10 21:13:12 2025 NathanUpdateVLC UpdatePDH Lock Progress and Next StepsProgress update: Photodiode is set up, need
to set up DC bias tee, EOM has 400-600nm
wavelength range with a resonance frequency
 thumbnail_(2).jfifthumbnail_(4).jfifthumbnail_(5).jfifVisible_Light_Optical_Cavity_(2).pdf 
  551   Tue Apr 8 20:04:35 2025 NathanUpdateVLC UpdatePDH Lock ProgressConnected the DC bias and mixer. Need to connect
signal generator now to RF Amp and mixer,
and also need to connect power supply. After
 IMG_5450.jpegIMG_5449.jpeg 
  39   Wed Mar 1 21:27:20 2023 JonInfrastructureCleanroomOver-table shelf height raisedJon, Cao

Today we raised the height of the
shelf overhanging the cleanroom laser table
 cleanroom-shelf.jpg 
  16   Mon Jan 23 17:26:15 2023 Peter CarneyUpdateGeneralOven cleaningAiden and Cao 
Turned on the oven to 120
deg C for 12 hours. After 12 hours, put it
at 200 deg C for 48 hours. 
  
  17   Thu Jan 26 18:58:25 2023 AidenUpdateGeneralOven HeatingAiden cleaned the oven with methanol again
and set the oven to 260 degC for 12 hours.
  
  338   Fri Feb 23 18:03:27 2024 TylerUpdateFLIROptical Test Setup in Cleanroom[Tyler, Xuesi]

The FLIR and test mass
stand-in have been transferred into the cleanroom.
A software test will be run as soon as we
 IMG_0941.png 
  9   Tue Jul 26 14:10:35 2022 CassidyUpdateCamerasOptical Post Replacement and RealignmentToday I replaced the 3" optical post that
the camera rests on with a 2" optical post
in order for the screen to correctly fill
 YAxisAlignment.pngXRotZAlignment.pngNewOpticalPost.png 
  527   Thu Feb 27 18:22:21 2025 ShaneUpdateCDSOngoing work in server rack and desk area (1119)As part of the vacuum communications debugging
process, there is ongoing work in the server
rack and desk area in 1119. Please be careful
  
  650   Tue Sep 30 12:51:23 2025 TylerUpdateTCSO6 RH Update 09/30/2025Slides   
  636   Tue Aug 26 13:09:03 2025 TylerUpdateTCSO6 RH Update[Tyler]

 Below are slides giving an
update on RH O6 design progress. 

Slides
  
  424   Mon Aug 12 17:09:04 2024 Cynthia UpdateInterferometer SimulationsO4 vs O5 cavity scans with ITM plume guess or ETMSo far the proposed solution for what to use
for O5 ITM mirror for SIS simulations is
either the plume guess file or using the
 O5_plots_and_tables.pdfO4_plots_and_tables.pdfETM12mapO5.pngScreenshot_2024-08-12_at_5.05.31_PM.png 
  392   Mon Jul 1 15:19:42 2024 Cynthia UpdateInterferometer SimulationsO4 and O5 mirror cavity scans with thermal effect   cavityScan_07_01.pdf 
  578   Thu May 15 12:03:41 2025 Xuesi MaInfrastructureElectronicsNoticeAll Sorensen power supplies are turned
off. The Cymac system is down (All Chassis
are down)
  
  67   Tue Apr 11 13:15:40 2023 CaoInfrastructureClean & BakeNitrogen gas tank replacedThe nitrogen gas tank has been replaced with
a new unit. The new tank is ultra pure nitrogen
(>99.9% nitrogen).

The new tank has been
  
  26   Fri Feb 10 16:34:45 2023 Huy Tuong CaoInfrastructureClean & BakeNitrogen gas tank ready to useCao,


Today I fixed the final bit related
to the nitrogen gas tank, which is to apply
sealing tape to M-NPT connector of the hose
 AirGunSealed.jpg 
  412   Fri Jul 26 17:25:42 2024 JonInfrastructureComputersNew workstation ws4 installed in 1129Today I installed the second desktop workstation
in 1129. The new machine is an Intel NUC13ANHi5,
with a 12-Core Intel i5-1340P CPU, 32GB DDR4
 ws4.jpg 
  379   Thu Jun 20 18:01:11 2024 JonInfrastructureComputersNew workstation ws3 in 1129I have repurposed a spare Intel NUC to serve
as the first of two planned workstations
in 1129. Today I set it up with a fresh installation
  
  385   Wed Jun 26 15:33:41 2024 JonInfrastructureComputersNew workstation ws3 in 1129
Set-up of the first CDS workstation for
1129, ws3, is complete and the machine is
ready for use. The login credentials are
 IMG_1368.jpg 
  198   Wed Aug 9 11:32:56 2023 JonInfrastructureGeneralNew power cablesI delivered new NEMA 5-15 (120V / 15 A)
power cables to the lab for the following
items:
 IMG_0299.jpg 
  562   Fri Apr 25 19:18:10 2025 Luke UpdateScripts/ProgramsNew optimization plotsI have created two more plots. One on the
transmitted power for a specific configuration.
This was done by taking the product of the
 effective_power.pngproximity.png 
  575   Sun May 11 19:36:42 2025 Luke UpdateScripts/ProgramsNew optimization plotsSlides
I have re-run the optimization plots
with the changes mentioned last week. 
  
  640   Tue Sep 2 18:33:38 2025 LiuInfrastructureGeneralNew lab room 1125 layout and measurementAction items for facilities
 

Ceiling lights replacement
Fume
 1125.pdf 
  135   Tue Jun 27 15:18:26 2023 PamellaUpdateFLIRNew data collection  
[Pamella]



  Yesterday,
I did a new data collection.  I could get
a better data in this time and I realized
 FLIR_data.002.jpegFLIR_data_2.002.jpeg 
  123   Tue Jun 13 21:33:46 2023 PamellaUpdateGeneralNew cabinet for PPI[Pamella and Dr.Richardson]

Dr. Richardson
installed the new cabinet outside the room
for the PPI equipments, and then I wiped
  
  157   Fri Jul 14 16:49:42 2023 PamellaUpdateFLIRNew bridge and calibration data[Pamella]


Aiden 3D printed a new
bridge for the heater and I installed the
new bridge yesterday. 
 I started
 IMG_8606.jpeg 
  367   Mon May 13 14:48:27 2024 AidenUpdateVACNew Vacuum Chamber DesignI created a new model for the vacuum chamber
based on the ideas from last week's meeting.

It
should be noted that we can not have the
 VaccumChamberAssembly__Redesign_v5.jpg 
  398   Mon Jul 8 17:01:45 2024 ShaneUpdateCDSNew CyMAC internal layout[Jon, Shane]

Internal layout of CyMAC has
been updated (labeled image attached) to
accommodate the replacement of the two ribbon
 updated_cymac.jpeg 
  108   Tue May 30 14:51:27 2023 PamellaUpdateFLIRNew 3D mask - Bigger triangles shapes.[Pamella]

 Change the 3D mask 

Started removing the old mask in the reflector.

Started cutting the new aluminum lid for
 AcquisitionImage(May-30-2023_14_38).jpgthumbnail_IMG-7303.jpg 
  643   Tue Sep 9 12:13:38 2025 LiuUpdateInterferometer SimulationsMulti-ring FROSTI optimization for A# with grid searchMulti-ring FROSTI optimization based on IFO
metrics for A# with grid search
 Update.pdf 
  616   Tue Jul 29 11:27:57 2025 LiuUpdateInterferometer SimulationsMulti-ring FROSTI optimization for A#   Update.pdfscene-export-temp.htmlscene-export-deformation.html 
  625   Tue Aug 12 12:16:21 2025 LiuUpdateInterferometer SimulationsMulti-ring FROSTI optimization for A#Multi-ring FROSTI optimization for A# with
static polishing
 Update.pdf 
  647   Tue Sep 23 12:39:29 2025 LiuUpdateInterferometer SimulationsMulti-ring FROSTI optimization for A#   Update.pdf 
  652   Thu Oct 9 12:18:14 2025 LiuUpdateInterferometer SimulationsMulti-ring FROSTI optimization for A#   Update.pdf 
  633   Tue Aug 26 12:14:24 2025 LiuUpdateInterferometer SimulationsMulti-ring FROSTI design for A# with ring heater optimization Multi-ring FROSTI design for A# with ring
heater optimization 
 Update_(1).pdf 
  639   Tue Sep 2 12:41:33 2025 LiuUpdateInterferometer SimulationsMulti-ring FROSTI design for A# with ring heater optimization[Tyler, Liu]

Ring heater optimization,
continued
 Update.pdf 
  172   Tue Jul 25 15:35:14 2023 ShaneUpdateElectronicsMore chassis movedFinished basic assembly of binary input and
output chassis today, and moved one to top
shelf of work bench. The other is in corner
 IMG_8409.HEIC 
  91   Wed May 3 19:03:47 2023 Julian,Pamella and CaoPhysicsVACModify vacuum asssembly and install RGA[Pamella, Julian, Cao]

   Today we
started re-configuring the vacuum chamber
components. 

 Particle count
 vaccum_chamber_re-configuration.jpg 
  111   Wed May 31 16:18:41 2023 AidenSummaryGeneralMock FROSTIFinished assembly on the Mock FROSTI so it
is ready for the fit test at LIGO lab.
 IMG_4394.jpg 
  397   Mon Jul 8 12:26:10 2024 MichaelUpdateInterferometer SimulationsMinimizing Astigmatic Effects in the SRC of LIGOThis is the first look and analysis of the
effects of astigmatism in the aLIGO optical
layout which can lead to mode mismatch and
  
  617   Tue Jul 29 11:45:19 2025 MapleUpdateTCSMeeting update   Maple_TCS_update_jul_29.pdf 
  339   Sat Feb 24 08:53:38 2024 JonInfrastructureComputersMatlab upgraded to 2023b on ChimayI upgraded Matlab on chimay to the latest
stable release, 2023b. From some quick tests,
it appears to be in working order. Let me
  
  496   Thu Jan 2 17:52:58 2025 LuisUpdateVACMR Testing Continuation [Luis, Luke]
        RGA Volume:
T = 22°C, P = 2.10e-9 Torr
        Main Volume:
 2024-12-16_PostBake2_ArO_overlay.png2025-1-2_MR-Bake1_ArO.png2025-1-2_MR-Bake1_ArC_overlay.png 
  490   Mon Dec 16 21:32:21 2024 LuisUpdateVACMR Testing[Luis, Luke]

The MR material was
placed in the vacuum chamber following standard
procedures to ensure the vacuum remained
 IMG_6011.HEIC 
  494   Sun Dec 22 20:43:35 2024 LuisUpdateVACMR Testing[Luis, Luke]
        RGA Volume:
T = 23°C, P = 3.0e-9 Torr
        Main Volume:
 2024-12-13_PostBake2_ArO_Degas_overlay.png2024-12-22_MR-Bake1_ArO.png 
  467   Tue Nov 5 09:56:04 2024 Luis MartinUpdateClean & BakeMR Bake    [Luke, Luis]
    
        On Friday, 11/1/24,
the MR was unpackaged and cleaned under the
  
  329   Mon Feb 19 14:40:21 2024 ShaneUpdateCDSMEDM screen for FROSTI temp readoutsHere's the latest draft of the MEDM screen
for the FROSTI heating elements' temperature
readouts. Note that the MEDM screen isn't
 IMG_6094.jpegIMG_6092.jpeg 
  346   Thu Feb 29 17:16:48 2024 ShaneUpdateCDSMEDM screen for FROSTI T/P readoutsHere's the latest draft of the MEDM screen
for the FROSTI temp and power readouts, now
with a button linking to the c1msc file display.
 IMG_6259.jpeg 
  593   Wed Jun 11 16:33:45 2025 PooyanUpdateComputersLuke's ray tracing hosting
Hosted Lukes model on Chimay. It's
available at https://richardsonlab.ucr.edu/real-time-frosti
The
sourcecode is at Github.
  
  334   Wed Feb 21 23:15:07 2024 MichaelUpdateInterferometer SimulationsLong Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in BeamsplitterI have created the long shoelaces 1 layout
for cosmic explorer using gtrace, a slight
modification from the shoelaces 1 layout
 long_shoelaces1_desmos.JPGAR_side_with_reflection.PNGAR_side_without_reflection.PNG 
  317   Tue Feb 6 22:40:25 2024 MichaelUpdateScripts/ProgramsLong Crab 1 Design Created In GtraceWorked on and completed the python code for
the simulation of the Long Crab 1 layout
for Cosmic Explorer basing off of Pooyan's
 Long_Crab1.pnglong_crab_1_desmos.PNG 