  198   Wed Aug 9 11:32:56 2023 JonInfrastructureGeneralNew power cablesI delivered new NEMA 5-15 (120V / 15 A)
power cables to the lab for the following
items:
 IMG_0299.jpg 
  562   Fri Apr 25 19:18:10 2025 Luke UpdateScripts/ProgramsNew optimization plotsI have created two more plots. One on the
transmitted power for a specific configuration.
This was done by taking the product of the
 effective_power.pngproximity.png 
  575   Sun May 11 19:36:42 2025 Luke UpdateScripts/ProgramsNew optimization plotsSlides
I have re-run the optimization plots
with the changes mentioned last week. 
  
  135   Tue Jun 27 15:18:26 2023 PamellaUpdateFLIRNew data collection  
[Pamella]



  Yesterday,
I did a new data collection.  I could get
a better data in this time and I realized
 FLIR_data.002.jpegFLIR_data_2.002.jpeg 
  123   Tue Jun 13 21:33:46 2023 PamellaUpdateGeneralNew cabinet for PPI[Pamella and Dr.Richardson]

Dr. Richardson
installed the new cabinet outside the room
for the PPI equipments, and then I wiped
  
  157   Fri Jul 14 16:49:42 2023 PamellaUpdateFLIRNew bridge and calibration data[Pamella]


Aiden 3D printed a new
bridge for the heater and I installed the
new bridge yesterday. 
 I started
 IMG_8606.jpeg 
  367   Mon May 13 14:48:27 2024 AidenUpdateVACNew Vacuum Chamber DesignI created a new model for the vacuum chamber
based on the ideas from last week's meeting.

It
should be noted that we can not have the
 VaccumChamberAssembly__Redesign_v5.jpg 
  398   Mon Jul 8 17:01:45 2024 ShaneUpdateCDSNew CyMAC internal layout[Jon, Shane]

Internal layout of CyMAC has
been updated (labeled image attached) to
accommodate the replacement of the two ribbon
 updated_cymac.jpeg 
  108   Tue May 30 14:51:27 2023 PamellaUpdateFLIRNew 3D mask - Bigger triangles shapes.[Pamella]

 Change the 3D mask 

Started removing the old mask in the reflector.

Started cutting the new aluminum lid for
 AcquisitionImage(May-30-2023_14_38).jpgthumbnail_IMG-7303.jpg 
  172   Tue Jul 25 15:35:14 2023 ShaneUpdateElectronicsMore chassis movedFinished basic assembly of binary input and
output chassis today, and moved one to top
shelf of work bench. The other is in corner
 IMG_8409.HEIC 
  91   Wed May 3 19:03:47 2023 Julian,Pamella and CaoPhysicsVACModify vacuum asssembly and install RGA[Pamella, Julian, Cao]

   Today we
started re-configuring the vacuum chamber
components. 

 Particle count
 vaccum_chamber_re-configuration.jpg 
  111   Wed May 31 16:18:41 2023 AidenSummaryGeneralMock FROSTIFinished assembly on the Mock FROSTI so it
is ready for the fit test at LIGO lab.
 IMG_4394.jpg 
  397   Mon Jul 8 12:26:10 2024 MichaelUpdateInterferometer SimulationsMinimizing Astigmatic Effects in the SRC of LIGOThis is the first look and analysis of the
effects of astigmatism in the aLIGO optical
layout which can lead to mode mismatch and
  
  339   Sat Feb 24 08:53:38 2024 JonInfrastructureComputersMatlab upgraded to 2023b on ChimayI upgraded Matlab on chimay to the latest
stable release, 2023b. From some quick tests,
it appears to be in working order. Let me
  
  496   Thu Jan 2 17:52:58 2025 LuisUpdateVACMR Testing Continuation [Luis, Luke]
        RGA Volume:
T = 22°C, P = 2.10e-9 Torr
        Main Volume:
 2024-12-16_PostBake2_ArO_overlay.png2025-1-2_MR-Bake1_ArO.png2025-1-2_MR-Bake1_ArC_overlay.png 
  490   Mon Dec 16 21:32:21 2024 LuisUpdateVACMR Testing[Luis, Luke]

The MR material was
placed in the vacuum chamber following standard
procedures to ensure the vacuum remained
 IMG_6011.HEIC 
  494   Sun Dec 22 20:43:35 2024 LuisUpdateVACMR Testing[Luis, Luke]
        RGA Volume:
T = 23°C, P = 3.0e-9 Torr
        Main Volume:
 2024-12-13_PostBake2_ArO_Degas_overlay.png2024-12-22_MR-Bake1_ArO.png 
  467   Tue Nov 5 09:56:04 2024 Luis MartinUpdateClean & BakeMR Bake    [Luke, Luis]
    
        On Friday, 11/1/24,
the MR was unpackaged and cleaned under the
  
  329   Mon Feb 19 14:40:21 2024 ShaneUpdateCDSMEDM screen for FROSTI temp readoutsHere's the latest draft of the MEDM screen
for the FROSTI heating elements' temperature
readouts. Note that the MEDM screen isn't
 IMG_6094.jpegIMG_6092.jpeg 
  346   Thu Feb 29 17:16:48 2024 ShaneUpdateCDSMEDM screen for FROSTI T/P readoutsHere's the latest draft of the MEDM screen
for the FROSTI temp and power readouts, now
with a button linking to the c1msc file display.
 IMG_6259.jpeg 
  593   Wed Jun 11 16:33:45 2025 PooyanUpdateComputersLuke's ray tracing hosting
Hosted Lukes model on Chimay. It's
available at https://richardsonlab.ucr.edu/real-time-frosti
The
sourcecode is at Github.
  
  334   Wed Feb 21 23:15:07 2024 MichaelUpdateInterferometer SimulationsLong Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in BeamsplitterI have created the long shoelaces 1 layout
for cosmic explorer using gtrace, a slight
modification from the shoelaces 1 layout
 long_shoelaces1_desmos.JPGAR_side_with_reflection.PNGAR_side_without_reflection.PNG 
  317   Tue Feb 6 22:40:25 2024 MichaelUpdateScripts/ProgramsLong Crab 1 Design Created In GtraceWorked on and completed the python code for
the simulation of the Long Crab 1 layout
for Cosmic Explorer basing off of Pooyan's
 Long_Crab1.pnglong_crab_1_desmos.PNG 
  476   Wed Nov 20 12:31:24 2024 LuisUpdateVACLeak test RGA Scan after vacuum repairs[Luke, Luis]
After the gasket replacement performed
on Monday (11/18/24) we let the vacuum pump
 2024-11-20_PostBake1_ArO.png 
  474   Tue Nov 19 17:10:34 2024 Luke UpdateVACLeak checkChamber temperature: 23C
Chamber Initial Pressure: ~1.8e-8
main, ~3.5e-8 rga
 image.pngIMG_5116.jpegIMG_5117.jpeg 
  462   Wed Oct 23 11:48:06 2024 Luis MartinUpdateVACLeak Test Results[Luke, Luis, Mary, Ma]
 On 10/22/24 Luke, Ma, Mary and myself
ran a leak test, the results are displayed
  
  273   Mon Nov 20 20:45:16 2023 AidenUpdateVACLeak Test
[Aiden, Luis]

Tested every weld
and flange to find leaks. Only found that
the flange on the turbo pump and reducing
  
  116   Tue Jun 6 16:15:09 2023 PeterUpdateVLC UpdateLaunch Optics for Visible Light CavityI assembled the first few components of the
launch optics for the visible light cavity.
Below is an image of the current table configuration,
 IMG-0882.jpgIMG-0883.jpg 
  337   Fri Feb 23 15:01:48 2024 ShaneUpdateCDSLatest draft of MEDM screen for FROSTI readoutsHere's the latest draft of the MEDM screen
for the FrOSTI temp and power readouts. Also,
debugged the text readout boxes so they're
 IMG_6128.jpg23.jpg 
  495   Mon Dec 23 14:33:36 2024 TylerUpdateTCSLatest RIN Measurement ResultsAttached below are the measurements I took
from the FROSTI from 12/18-12/22.
 Updated_ASD_plots.pdfDark_Noise_Thermal_ASD_plots.pdfDC_Voltages.pdfRP-2.jpg 
  62   Tue Apr 4 09:53:37 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsThe set up for the next round of beam characterization
measurements has begun. The beam is initially
passing through a half waveplate, is split
 initial_Intens_measure_set_up.jpg 
  65   Thu Apr 6 10:20:43 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsMore optical components were added to the
optical set up for laser intensity / polarization
drift measurements. Both lenses and both
 Optical_Setup_4-6-23.jpg 
  83   Fri Apr 28 11:21:01 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsThe Digi-key cables have arrived, and I have
began implementing them in the intensity
drift measurements. 

There was a slight
 IMG-0183.jpg 
  102   Mon May 22 16:43:28 2023 PeterUpdateVLC ElectronicsLaser intensity/polarization drift measurementsIn order to fully analyze the polarization
data taken last Thursday, I needed to convert
the signal output (which is in volts) to
 S-P_Polarization_Diagram.svgPolar_angle_vs_time.pngRel_Intens_vs_time.png 
  107   Wed May 24 14:28:26 2023 PeterUpdateVLC ElectronicsLaser intensity/polarization drift measurementsI went in and took polarization drift data
for 16 hours. The run started at 6:08pm and
finished at 9:15am the next day. The four
 Time_Series_Trial_7_16hrs.pngPower_vs_Time_16hrs.pngPolar_angle_vs_time_16hrs.pngRel_Intens_vs_time_16hrs.png 
  21   Sat Feb 4 17:01:03 2023 PeterUpdateVLC ElectronicsLaser DataPeter and Ryan took laser beam data. Configuration:
100mm focal length lens is ~100mm from lens.
150mm focal length lens is ~200mm from first
 OmegaX_M2_Fit_3.pngOmegaY_M2_Fit_3.png 
  46   Wed Mar 8 18:35:52 2023 PamellaUpdate Lab cleaning Today Pamella finished cleaning of the cleanroom,
starting with the HEPA vacuuming,  mopping
and clearing all floor with IPA wipes. 
Also
  
  68   Tue Apr 11 17:56:15 2023 PamellaUpdateGeneralLab cleaning Today Pamella and Julian finished cleaning
of the cleanroom, starting with the HEPA
vacuuming, mopping and clearing all floor
  
  257   Wed Nov 8 17:55:49 2023 JonUpdateGeneralLab Clean-Up Day 1[Jon, Tyler, Shane, Peter, Luis]
Today we completed the first phase
of lab clean-up. Activities included:
  
  528   Tue Mar 4 03:05:42 2025 Xuesi MaUpdateELOGLOG1424564097.243212 2025/02/26 00:14:39 UTC Time
start
12V 2A right after start all 8 elements
  
  182   Mon Jul 31 12:39:01 2023 ShaneUpdateElectronicsLED cable assemblies installed Today I put together the two LED cable assemblies
for the CyMAC and mounted them in the anti-aliasing
and anti-imaging chassis.
 IMG_8514.jpegIMG_8516.jpeg 
  134   Tue Jun 27 14:04:42 2023 Sophia A. UpdateMeasuring Noise in InterferometerInterferometer set up and connection to red pitayaToday we (Sophia and Tyler) constructed the
set-up for the electrical noise calculation
that I will be conducting this summer. I
 IMG_6756.jpgIMG_6754.jpgIMG_6755.jpg 
  81   Thu Apr 27 16:23:44 2023 Cao, Pamella and JulianPhysicsVACInstalling vacuum system (cont.)
 
[Pamella, Cao and Julian, Shane]



 Particles account 

10:37 am: Starting the particles account
 IMG_0139.pngIMG_0136.png 
  87   Mon May 1 17:10:25 2023 Julian, CaoPhysicsVACInstalling Pirani gauge and RGA probe onto to vacuum chamber [Julian, Cao] 



 03:00 pm: Particle
count

:  Zone 3 

 PXL_20230501_225241491.jpgPXL_20230501_235854958.jpgPXL_20230501_234750795.MP.jpg 
  11   Mon Oct 3 17:21:39 2022 CaoUpdateTCSInspection of macor partsThe macor parts arrived and inspected today.
These include:


 Macor spacer
(drawing:  LIGO_Redesign_Macor_Spacer_Drawing_v4.pdf
 7x 
  582   Mon May 26 23:24:33 2025 MichaelUpdateInterferometer SimulationsInitial Monte Carlo Simulations for Toroidal Mirrors ProjectI've run an initial Monte Carlo simulation
for statistical comparison of toroidal mirrors
for the dual FROSTI TCS case. Below is the
  
  571   Tue May 6 13:07:34 2025 MichaelUpdateInterferometer SimulationsInitial Convergence Plots for Toroidal Mirrors Project   Convergence_Plots_5_6_25.pdfConvergence_Plots_5_6_25-1.pdfaperture_num_points_convergence.png 
  373   Mon Jun 3 14:14:39 2024 TylerUpdateFLIRInitial CIT FROSTI Analysis [Tyler]


Attached below are the initial
results of the CIT FROSTI testing analysis.
 CIT_FROSTI_Analysis_Group_Meeting-2.pdf 
  323   Tue Feb 13 11:54:45 2024 TylerConfigurationFLIRIn-Air Optical Test Configuration
Below is the proposed schematic for FROSTI
optical testing, chosen so enough space is
allotted for prototype assembly.
 In-air_optical_test_sketch.png 
  349   Tue Mar 19 10:55:30 2024 TylerUpdateFLIRIn-Air Optical TestBelow is an image I took using the FLIR just
before leaving for the LVK meeting. The profile
is roughly what we would expect (annular).
 FroSTI_Thermal_Profile.png 