198
|
Wed Aug 9 11:32:56 2023 |
Jon | Infrastructure | General | New power cables | I delivered new NEMA 5-15 (120V / 15 A)
power cables to the lab for the following
items: |
|
562
|
Fri Apr 25 19:18:10 2025 |
Luke | Update | Scripts/Programs | New optimization plots | I have created two more plots. One on the
transmitted power for a specific configuration.
This was done by taking the product of the |
 |
575
|
Sun May 11 19:36:42 2025 |
Luke | Update | Scripts/Programs | New optimization plots | Slides
I have re-run the optimization plots
with the changes mentioned last week. |
|
135
|
Tue Jun 27 15:18:26 2023 |
Pamella | Update | FLIR | New data collection |
[Pamella]
Yesterday,
I did a new data collection. I could get
a better data in this time and I realized |
 |
123
|
Tue Jun 13 21:33:46 2023 |
Pamella | Update | General | New cabinet for PPI | [Pamella and Dr.Richardson]
Dr. Richardson
installed the new cabinet outside the room
for the PPI equipments, and then I wiped |
|
157
|
Fri Jul 14 16:49:42 2023 |
Pamella | Update | FLIR | New bridge and calibration data | [Pamella]
Aiden 3D printed a new
bridge for the heater and I installed the
new bridge yesterday.
I started |
|
367
|
Mon May 13 14:48:27 2024 |
Aiden | Update | VAC | New Vacuum Chamber Design | I created a new model for the vacuum chamber
based on the ideas from last week's meeting.
It
should be noted that we can not have the |
|
398
|
Mon Jul 8 17:01:45 2024 |
Shane | Update | CDS | New CyMAC internal layout | [Jon, Shane]
Internal layout of CyMAC has
been updated (labeled image attached) to
accommodate the replacement of the two ribbon |
|
108
|
Tue May 30 14:51:27 2023 |
Pamella | Update | FLIR | New 3D mask - Bigger triangles shapes. | [Pamella]
Change the 3D mask
Started removing the old mask in the reflector.
Started cutting the new aluminum lid for |
 |
172
|
Tue Jul 25 15:35:14 2023 |
Shane | Update | Electronics | More chassis moved | Finished basic assembly of binary input and
output chassis today, and moved one to top
shelf of work bench. The other is in corner |
|
91
|
Wed May 3 19:03:47 2023 |
Julian,Pamella and Cao | Physics | VAC | Modify vacuum asssembly and install RGA | [Pamella, Julian, Cao]
Today we
started re-configuring the vacuum chamber
components.
Particle count |
|
111
|
Wed May 31 16:18:41 2023 |
Aiden | Summary | General | Mock FROSTI | Finished assembly on the Mock FROSTI so it
is ready for the fit test at LIGO lab. |
|
397
|
Mon Jul 8 12:26:10 2024 |
Michael | Update | Interferometer Simulations | Minimizing Astigmatic Effects in the SRC of LIGO | This is the first look and analysis of the
effects of astigmatism in the aLIGO optical
layout which can lead to mode mismatch and |
|
339
|
Sat Feb 24 08:53:38 2024 |
Jon | Infrastructure | Computers | Matlab upgraded to 2023b on Chimay | I upgraded Matlab on chimay to the latest
stable release, 2023b. From some quick tests,
it appears to be in working order. Let me |
|
496
|
Thu Jan 2 17:52:58 2025 |
Luis | Update | VAC | MR Testing Continuation | [Luis, Luke]
RGA Volume:
T = 22°C, P = 2.10e-9 Torr
Main Volume: |
  |
490
|
Mon Dec 16 21:32:21 2024 |
Luis | Update | VAC | MR Testing | [Luis, Luke]
The MR material was
placed in the vacuum chamber following standard
procedures to ensure the vacuum remained |
|
494
|
Sun Dec 22 20:43:35 2024 |
Luis | Update | VAC | MR Testing | [Luis, Luke]
RGA Volume:
T = 23°C, P = 3.0e-9 Torr
Main Volume: |
 |
467
|
Tue Nov 5 09:56:04 2024 |
Luis Martin | Update | Clean & Bake | MR Bake | [Luke, Luis]
On Friday, 11/1/24,
the MR was unpackaged and cleaned under the |
|
329
|
Mon Feb 19 14:40:21 2024 |
Shane | Update | CDS | MEDM screen for FROSTI temp readouts | Here's the latest draft of the MEDM screen
for the FROSTI heating elements' temperature
readouts. Note that the MEDM screen isn't |
 |
346
|
Thu Feb 29 17:16:48 2024 |
Shane | Update | CDS | MEDM screen for FROSTI T/P readouts | Here's the latest draft of the MEDM screen
for the FROSTI temp and power readouts, now
with a button linking to the c1msc file display. |
|
593
|
Wed Jun 11 16:33:45 2025 |
Pooyan | Update | Computers | Luke's ray tracing hosting |
Hosted Lukes model on Chimay. It's
available at https://richardsonlab.ucr.edu/real-time-frosti
The
sourcecode is at Github. |
|
334
|
Wed Feb 21 23:15:07 2024 |
Michael | Update | Interferometer Simulations | Long Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in Beamsplitter | I have created the long shoelaces 1 layout
for cosmic explorer using gtrace, a slight
modification from the shoelaces 1 layout |
  |
317
|
Tue Feb 6 22:40:25 2024 |
Michael | Update | Scripts/Programs | Long Crab 1 Design Created In Gtrace | Worked on and completed the python code for
the simulation of the Long Crab 1 layout
for Cosmic Explorer basing off of Pooyan's |
 |
476
|
Wed Nov 20 12:31:24 2024 |
Luis | Update | VAC | Leak test RGA Scan after vacuum repairs | [Luke, Luis]
After the gasket replacement performed
on Monday (11/18/24) we let the vacuum pump |
|
474
|
Tue Nov 19 17:10:34 2024 |
Luke | Update | VAC | Leak check | Chamber temperature: 23C
Chamber Initial Pressure: ~1.8e-8
main, ~3.5e-8 rga |
  |
462
|
Wed Oct 23 11:48:06 2024 |
Luis Martin | Update | VAC | Leak Test Results | [Luke, Luis, Mary, Ma]
On 10/22/24 Luke, Ma, Mary and myself
ran a leak test, the results are displayed |
|
273
|
Mon Nov 20 20:45:16 2023 |
Aiden | Update | VAC | Leak Test |
[Aiden, Luis]
Tested every weld
and flange to find leaks. Only found that
the flange on the turbo pump and reducing |
|
116
|
Tue Jun 6 16:15:09 2023 |
Peter | Update | VLC Update | Launch Optics for Visible Light Cavity | I assembled the first few components of the
launch optics for the visible light cavity.
Below is an image of the current table configuration, |
 |
337
|
Fri Feb 23 15:01:48 2024 |
Shane | Update | CDS | Latest draft of MEDM screen for FROSTI readouts | Here's the latest draft of the MEDM screen
for the FrOSTI temp and power readouts. Also,
debugged the text readout boxes so they're |
 |
495
|
Mon Dec 23 14:33:36 2024 |
Tyler | Update | TCS | Latest RIN Measurement Results | Attached below are the measurements I took
from the FROSTI from 12/18-12/22. |
   |
62
|
Tue Apr 4 09:53:37 2023 |
Peter | Update | VLC Update | Laser intensity/polarization drift measurements | The set up for the next round of beam characterization
measurements has begun. The beam is initially
passing through a half waveplate, is split |
|
65
|
Thu Apr 6 10:20:43 2023 |
Peter | Update | VLC Update | Laser intensity/polarization drift measurements | More optical components were added to the
optical set up for laser intensity / polarization
drift measurements. Both lenses and both |
|
83
|
Fri Apr 28 11:21:01 2023 |
Peter | Update | VLC Update | Laser intensity/polarization drift measurements | The Digi-key cables have arrived, and I have
began implementing them in the intensity
drift measurements.
There was a slight |
|
102
|
Mon May 22 16:43:28 2023 |
Peter | Update | VLC Electronics | Laser intensity/polarization drift measurements | In order to fully analyze the polarization
data taken last Thursday, I needed to convert
the signal output (which is in volts) to |
  |
107
|
Wed May 24 14:28:26 2023 |
Peter | Update | VLC Electronics | Laser intensity/polarization drift measurements | I went in and took polarization drift data
for 16 hours. The run started at 6:08pm and
finished at 9:15am the next day. The four |
   |
21
|
Sat Feb 4 17:01:03 2023 |
Peter | Update | VLC Electronics | Laser Data | Peter and Ryan took laser beam data. Configuration:
100mm focal length lens is ~100mm from lens.
150mm focal length lens is ~200mm from first |
 |
46
|
Wed Mar 8 18:35:52 2023 |
Pamella | Update | | Lab cleaning | Today Pamella finished cleaning of the cleanroom,
starting with the HEPA vacuuming, mopping
and clearing all floor with IPA wipes.
Also |
|
68
|
Tue Apr 11 17:56:15 2023 |
Pamella | Update | General | Lab cleaning | Today Pamella and Julian finished cleaning
of the cleanroom, starting with the HEPA
vacuuming, mopping and clearing all floor |
|
257
|
Wed Nov 8 17:55:49 2023 |
Jon | Update | General | Lab Clean-Up Day 1 | [Jon, Tyler, Shane, Peter, Luis]
Today we completed the first phase
of lab clean-up. Activities included: |
|
528
|
Tue Mar 4 03:05:42 2025 |
Xuesi Ma | Update | ELOG | LOG | 1424564097.243212 2025/02/26 00:14:39 UTC Time
start
12V 2A right after start all 8 elements |
|
182
|
Mon Jul 31 12:39:01 2023 |
Shane | Update | Electronics | LED cable assemblies installed | Today I put together the two LED cable assemblies
for the CyMAC and mounted them in the anti-aliasing
and anti-imaging chassis. |
 |
134
|
Tue Jun 27 14:04:42 2023 |
Sophia A. | Update | Measuring Noise in Interferometer | Interferometer set up and connection to red pitaya | Today we (Sophia and Tyler) constructed the
set-up for the electrical noise calculation
that I will be conducting this summer. I |
  |
81
|
Thu Apr 27 16:23:44 2023 |
Cao, Pamella and Julian | Physics | VAC | Installing vacuum system (cont.) |
[Pamella, Cao and Julian, Shane]
Particles account
10:37 am: Starting the particles account |
 |
87
|
Mon May 1 17:10:25 2023 |
Julian, Cao | Physics | VAC | Installing Pirani gauge and RGA probe onto to vacuum chamber | [Julian, Cao]
03:00 pm: Particle
count
: Zone 3
|
  |
11
|
Mon Oct 3 17:21:39 2022 |
Cao | Update | TCS | Inspection of macor parts | The macor parts arrived and inspected today.
These include:
Macor spacer
(drawing: LIGO_Redesign_Macor_Spacer_Drawing_v4.pdf |
7x |
582
|
Mon May 26 23:24:33 2025 |
Michael | Update | Interferometer Simulations | Initial Monte Carlo Simulations for Toroidal Mirrors Project | I've run an initial Monte Carlo simulation
for statistical comparison of toroidal mirrors
for the dual FROSTI TCS case. Below is the |
|
571
|
Tue May 6 13:07:34 2025 |
Michael | Update | Interferometer Simulations | Initial Convergence Plots for Toroidal Mirrors Project | |
  |
373
|
Mon Jun 3 14:14:39 2024 |
Tyler | Update | FLIR | Initial CIT FROSTI Analysis | [Tyler]
Attached below are the initial
results of the CIT FROSTI testing analysis.
|
|
323
|
Tue Feb 13 11:54:45 2024 |
Tyler | Configuration | FLIR | In-Air Optical Test Configuration |
Below is the proposed schematic for FROSTI
optical testing, chosen so enough space is
allotted for prototype assembly.
|
|
349
|
Tue Mar 19 10:55:30 2024 |
Tyler | Update | FLIR | In-Air Optical Test | Below is an image I took using the FLIR just
before leaving for the LVK meeting. The profile
is roughly what we would expect (annular). |
|