Wed Apr 12 16:17:50 2023, shane, Update, General, Particle Counter moved
|
With the added height of the new docking station, the particle counter no longer fits under the Windows monitor in the electronics rack and has been moved
to the desk in the corner of the lab. |
Mon Apr 17 17:06:49 2023, Aiden, Summary, General, Clean and Bake batch 11
|
Cleaned the Viton O-Ring for the main chamber in Liquinox for 10 minutes. Then put it in the oven to back for;
1. Ramp to 100 degC in 15 min.
2. Dwell
at 100 degC for 30 min.
3. Ramp to 180 degC in 30 min.
4. Dwell at 180 degC for 24 hours.
5. Off
Note: There were three viton -rings in the bag sent
to us. I cleaned and baked 2 of them and left the third in the bag. |
Fri Apr 21 16:51:26 2023, Pamella, Update, General, Cleaning cables.
|
Cables for the vacuum system.
Today i wiped, bagged and tagged two cables for the vacuum system. I used IPA wipes for cleaning this two split
power cord. I attached a image below.
|
Mon Apr 24 17:38:45 2023, Aiden, Summary, General, Clean and Bake Batch 12
|
Today I Bagged and tagged the o-rings from batch 11 and placed them inside the clean room. I also cleaned batch 12 parts in liquinox for 10 minutes and
them placed them into the oven where they will undergo the following steps;
1. Ramp to 100 degC in 15 min.
2. Dwell at 100 degC for 30 min.
3. Ramp
to 200 deg C in 30 min.
4. Dwell at 200 deg C for 48 hours.
5. Off |
Thu Apr 27 09:48:34 2023, Aiden, Summary, General, Batch 12 Bagging
|
I took batch 12 out of the oven and put them in a bag and placed the bag inside the clean room in the first large stainless steel container.
I also looked
at the small gauge that we felt like needed to be baked and I can confirm that without further cleaning around the inside of the gauge it should not be
connected to the main vacuum. I have attached a photo of the inside of the gauge. |
Fri Apr 28 19:39:19 2023, Cao, Summary, General, Clean and Bake Leybold TTR 91 Pirani Gauge
|
Quote:
I took batch 12 out of the oven and put
them in a bag and placed the bag inside the clean room in the first large stainless steel container.
I also looked at the small gauge that we felt like |
Mon May 8 12:00:03 2023, Pamella, Shane, Julian, Update, General, Cleanroom particle counts and cleaning the cleanroom.
|
[Pamella,Julian, Shane]
Today we cleaned the clean-room (floor, surfaces) and particle count.
10:00 am: Started particle count.
Zone 3:
0.3u: 1330
0.5u: 540
1.0u: 415
Zone 4:
0.3u: 290
0.5u:
83
1.0u: 0
Clean-room:
10:30 am: Started wiping down the surfaces inside the clean-room
10:41 am: |
Wed May 10 10:49:34 2023, Aiden, Update, General, RGA Software
|
[Aiden, Cao]
Went over how to use the RGA software, how to change the graph units, scaling and mass detection. Also went over how to remove the RGA from
the vacuum system as well as procedure for turning it on. |
Wed May 17 12:18:08 2023, Pamella, Julian and Shane , Update, General, Cleaning room and particle count
|
[Pamella, Julian and Shane]
Particle count:
10 am: Started particle count
Zone 3 :
0.3u: 1288
0.5u: 332
1.0u: 124
Zone 4 :
0.3u: 498
0.5u: 166
1.0u: 83
10:40 am: Checked the surfaces inside the cleanroom.
10:50 am: Started vacuuming the cleanroom.
11:15 am: Started mopping the cleanroom. |
Wed May 31 11:42:16 2023, Pamella, Julian and Shane, Update, General, Cleaning room and particle count
|
[Pamella, Shane and Julian]
Cleaning room and particle count
09:58 am: Started the particle count
Zone
3:
0.3u : 1,995
0.5u : 540
1.0u : 0
Zone 4:
0.3u : 124
0.5u : 0
1.0u : 0
10:25 am: Started checking the surfaces inside the cleanroom.
10:30 |
Wed May 31 16:18:41 2023, Aiden, Summary, General, Mock FROSTI
|
Finished assembly on the Mock FROSTI so it is ready for the fit test at LIGO lab. |
Tue Jun 6 16:04:46 2023, Aiden, Update, General, Water
|
Aiden went and refilled the de-ionized water to continue clean and bake batches. |
Mon Jun 12 18:52:00 2023, Pamella, Update, General, Heater system parts - Wiped and bagged
|
[Pamella]
Cleaning the heater system parts.
04:32 pm: Started wiping the heater system parts.
06:38 pm: Finished wiping the heater
and some parts to the system. I wiped, tagged and bagged the heater system, power cables, adapter cables and power connectors. Also I wiped, bagged and
tagged the aluminum foil tape.
06:43 pm: I putted all bags inside the cleanroom.
To do: I started but I was not able to finished |
Tue Jun 13 10:28:50 2023, Pamella, Update, General, Wiped and bagged the heating and cords.
|
[Pamella]
Cleaning the heater system parts.
09:13 am: Started wiping the last parts for the heater system (heating and cords).
10:18 am: Finished wiping the parts to the heater system (heating and cords). I wiped, tagged and bagged the heating and cords.
Note: In some parts looks like the silicone insulation material is having some sort of residue on the wipe so I wiped very careful this part and just for |
Tue Jun 13 21:33:46 2023, Pamella, Update, General, New cabinet for PPI
|
[Pamella and Dr.Richardson]
Dr. Richardson installed the new cabinet outside the room for the PPI equipments, and then I wiped all surfaces inside
and outside of the new cabinet.
Dr.Richardson and I have finished organizing the PPI within the new cabinet. Also we have new supplies of gloves,
and will likely have more supplies for other PPIs soon. |
Thu Jul 13 15:31:21 2023, Jon, Update, General, Ant traps placed around lab
|
In response to reports that ants have been observed in the lab, I placed five ant bait traps around the room today. Each is sitting on the floor on top
of a piece of aluminum foil, in areas unlikely to be inadvertently stepped on. They contain liquid which will spill
out if picked up, so please take care not to disturb them. |
Thu Jul 13 16:59:03 2023, Jon, Update, General, Ant traps placed around lab
|
Update: After seeing the strong response to the first set, I redistributed them to the hottest spots and added one more trap.
Quote:
In response to reports that ants have been observed in the lab, |
Sun Jul 16 15:21:56 2023, Pamella, Update, General, General update about some problems in the lab.
|
[Pamella]
General information about the lab facility.
Changed sticky floor mats, because close to entrance the cleanroom,
both sticky floor had a many died ants on top.
The light on top of the internet cable bridge is burned out.. I just saw this today but I am
not sure if was like this before.
The ant bait traps seem very efficient and right now only a few ants are running around in the lab, most are |
Wed Aug 9 11:32:56 2023, Jon, Infrastructure, General, New power cables
|
I delivered new NEMA 5-15 (120V / 15 A) power cables to the lab for the following items:
WS2 (cleanroom) cart - 10ft cable
Electronics workbench overhead LED - 10ft cable
Both PI heater controller sets - (2)
6ft cables
I installed the new cables on the WS2 cart and the workbench myself, and left the two 6ft cables (as pictured below) for Aiden |
Tue Aug 29 22:07:38 2023, Aiden, Update, General, Electronic Bench
|
Dr Richardson is working on mounting more power supplies in the server rack and is using the electronics bench. Be aware to not move anything on the bench
itself. |
Tue Sep 5 16:43:19 2023, Aiden, Update, General, VAC System Heating Update
|
Checked on bake 5 today after 3 days of equilibrium. The RGA cross is at 106 C and the turbo pump cross is at 74 C. This was reached while the PID controllers
were at 140 C. I will now slowly raise the temperature to 150 on the PID controllers and see if the difference in the RGA cross can be reduced. |
Wed Nov 8 17:55:49 2023, Jon, Update, General, Lab Clean-Up Day 1
|
[Jon, Tyler, Shane, Peter, Luis]
Today we completed the first phase of lab clean-up. Activities included:
CF/KF parts stored under the cleanroom table were removed and transferred to Physics 1129
Cleanroom workbench cleared, with all |
Tue Nov 21 22:09:44 2023, Aiden, Update, General, Testing Parts 8x
|
[Aiden, Luis]
Luis and Aiden vented the chamber today. We closed off the RGA section and then proceeded to open the the vent on the main body after
turning off the turbo and backing pump. We then opened the lid and placed in all the stainless steel hardware that will be used in evaluating the FROSTI
optics and heater elements. We also inspected the weldments before closing it up. Check the clean and bake data base where there is now a new section outlining |
Sat Dec 9 12:34:12 2023, Jon, Update, General, Electronics workshop migrated to 1129
|
[Jon, Tyler, Shane, Luis]
On Wednesday we completed the migration of the electronics workshop from 1119 to the large new workbenches in 1129. The two workstations pictured
closest to the front of the room are for electronics assembly and testing, while the two in the rear will house LIGO CDS workstations. We moved all of |
Mon Jan 8 20:24:53 2024, Aiden, Update, General,
|
[Jon, Aiden]
Installed the heater elements into their fixture and prepped the cables by twisting the wires into pairs. We also installed the pins
onto the wires and placed them into the peek DB 25 connector. The installation tool we had did not fit the pin size we had so the pins needed to be installed
by hand by opening the connector and holding them in place. In the future we will need to make sure we twist the wires together, group them, and then splice |
Mon Jan 15 22:29:34 2024, Jon, Infrastructure, General, Cabinet installation & lab clean-up completed
|
[Jon, Tyler, Aiden, Shane, Pooyan, Michael, Cynthia, Luke]
On Wednesday, we completed long list of work towards making the new lab (1129) fully operational and enabling the next phase of FROSTI testing.
Cabinet Installation
Three new VWR cabinets with sliding glass doors were installed in 1129. Each unit measures 48" |
Wed Jan 17 15:47:49 2024, Aiden, Update, General, Resistors for Heater Elements
|
Power Res (Ohm) RTD Res (Ohm)
Heater 1= 73.6; 81.8
Heater 2= 70.4; 82.1
Heater 3= 71; 84.5
Heater 4= 71.5; 80
Heater
5= 70.5; 81.7
Heater 6= 72; 79.4
Heater 7= 69.2; 78.2
Heater 8= 71.1; 84.2 |
Tue Feb 20 08:01:30 2024, Jon, Infrastructure, General, Power and network equipment installed in 1129 rack
|
[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On Thursday we installed the power conditioning/distribution equipment and networking equipment in the new 1129
rack. The hardware is identical to the setup in the 1119 rack and includes:
Tripp Lite SU5KRT3UTF - 208V, 5kVA on-line UPS with 120V transformer
CyberPower PDU20M2F12R - metered power distribution unit, |
Tue Feb 20 18:08:24 2024, Aiden, Update, General, Degassing the RGA
|
I took an RGA measurement before and after degassing the RGA. Both data was taken with the Argon open. The pressure before taking data was 2.39 e-8 torr
in the main volume. Note that the main chamber was fully valved off for the degas and the main chamber pressure quickly rose to e-6 torr. Further investigation
of this rise should be done as this might be the main culprit for the leaking. |
Mon Feb 26 15:15:39 2024, Aiden, Update, General, Vacuum Chamber Baking Update
|
Started Bake 12 on Wednesday Feb. 21 and turned the bake off on Saturday Feb. 24. This was a normal low temp bake with the PID controllers set to 110 degC. |
Wed Feb 28 12:02:08 2024, Tyler, Update, General, Resistors for Heater Elements Update
|
Power Res (Ohm) RTD Res (Ohm)
Heater 1= 72.8; 80.6
Heater 2= 69.5; 80.8
Heater 3= 70; 83.2
Heater 4= 70.6; 78.7
Heater
5= 69.9; 80.6
Heater 6= 71.1; 78.2
Heater 7= 68.5; 76.8
Heater 8= 70.1; 82.8
Quote:
|
Sun Mar 24 11:49:27 2024, Aiden, Update, General, FROSTI RGA Scan
|
Took RGA data 1 day after the conclusion of Bake 13. Bake 13 ended on Saturday March 23, the RGA data shown was taken on Sunday March 24. The scan shows
that the FROSTI is very clean with no outgassing. The HC levels are at 25 e-10. The pressure in the chamber was also a 1.64 e-8 Torr. |
Mon Jun 17 11:47:46 2024, Liu, Infrastructure, General, Temporary cooling units for the labs
|
Below are the temporary cooling units installed last week in labs 1119 and 1129. They are the temp. replacement for the building AC system, which will be
shut down during the Physics roof replacement. |
Thu Jul 11 21:01:37 2024, Jon, Infrastructure, General, Cable tray installed in 1129
|
Today I installed a 10' cable tray in 1129, for permanently routing Ethernet lines to the workstations. It is securely bolted to C-channels in the side
wall and in the center cable tray. |
Sat Jul 13 15:09:04 2024, Luke, Update, General, Ring heater COMSL model update
|
After the feedback from last meeting and Liu's help narrowing down what I should do to improve the model. I made some changes: First with Liu's help
I made the proportions of the test mass and ring heater much more reasonable and parametrized by constants. Second from Cao's paper "FROSTI Nonimaging
Reflector Design" Liu showed me what I should do to define the elliptical mirrors. Third during Friday's modeling/programming meeting walked me through |
Tue Jul 30 07:42:47 2024, Jon, Infrastructure, General, Cable tray installed in 1119
|
Yesterday I installed another 5' cable tray in 1119, for permanently routing Ethernet lines to the L-bench. It is securely bolted to the top of the electronics
rack, on one end, and to the top of the glass-door storage cabinet, on the other. This eliminates the need for the cable ramp which previously sat behind
the rack. |
Wed Nov 13 14:06:00 2024, Luke , Update, General,
|
slides |
Wed Apr 19 17:39:50 2023, Pamella, Update, FLIR, FLIR project
|
FLIR project updates- Initial tests
10:00: Starting test in position 2 cm to the black wall.
Parameters : 0,305
A, 05,5 V and the temperature inside the mirrors 141,8°C.
10:23 Finished this first tried and take snap. The image is attached below.
The name for the picture for this tried is “AcquisitionImage(Apr-19-2023_10 23)”.
10:37. Starting test in another position |
Fri Apr 21 15:21:18 2023, Pamella, Update, FLIR,
|
FLIR project updates
01:50 pm: Starting test position 34 mm distance to black wall.
Parameters : 0.100 A, 1.5 V and
the temperature inside the mirrors 40°C.
2:09 pm : Finished the test and figured out this position it is too far the black wall so now we change
for more close position.
2:17 pm: Starting test in another position: 10 mm distance to the black wall( this measurement |
Mon May 22 17:08:50 2023, Pamella, Update, FLIR, FLIR project - Installing the mask.
|
[Pamella]
The new mask for the reflector.
1:40 pm: Started reconfiguration on the FLIR camera project. Changed the
old bridge for the new mask-bridge.
2:00 pm: Started figure out the best way to cutting the aluminum foil with the new mask. Unfortunately,
I had been some problems for cutting the perfect shape triangles with the mask because the size inside the triangle is different (smaller) than cutter/knife, |
Tue May 23 16:52:56 2023, Pamella, Update, FLIR, FLIR project - Reinstalling the mask and Reconfiguration FLIR position.
|
[Pamella]
Reinstalling the mask and Reconfiguration FLIR position.
Today i change the aluminum foil inside the 3D mask. After some
tries i was able to have a better shape for the triangles.
I reinstalled the connections (the light with the thermometer point). Also i checked
for the focal point inside the reflector, looks fine.
I did a reconfiguration for the initial tests, without the black wall. I moved the FLIR |
Wed May 24 14:06:27 2023, Pamella, Update, FLIR, FLIR project - Tests
|
[Pamella]
Initial tests
10:30 am : Started trying take some test with the new position/configuration between the 3D reflector-mask
and the FLIR camera.
10:41 am : Started running the python code and take a snap. Parameters: 0.10 A, 1.4 V.
10:50 am : Started take
the snap.It is possible see the triangles, this is a good thing. Negative thing: The middle/center point for the light maybe would be some problems for |
Tue May 30 14:51:27 2023, Pamella, Update, FLIR, New 3D mask - Bigger triangles shapes.
|
[Pamella]
Change the 3D mask
Started removing the old mask in the reflector.
Started cutting the new aluminum lid for the
new 3D mask and assembling in the 3D mask.
Started doing the new cable connections for the light.
Started testing the resistance
in the new cable connections. The multimeter show us 14.2 Ω.
Started attaching the mask with the light and the thermometer sensor.
|
Wed May 31 16:55:55 2023, Pamella, Update, FLIR, FLIR- Focus distance
|
[Pamella and Tyler]
We changed the FLIR Focus Distance for around 0.55 m.
Note: The old focus distance was 1.3 m.
We
tested this new focus distances and looks good. I attached a snap below.
Parameters: 0.1 A , 1.5 V and 38.4 C.
|
Thu Jun 1 14:41:36 2023, Pamella, Update, FLIR, FLIR project - Test without the black wall.
|
[Pamella]
Test without the black wall.
General test:.
11:15 am : Started running the code. Parameters: 0.11 A, 1.9V and
focus distance around 0.55m.
11:28 am : Started snapping the screen. Parameters: 0.12 A, 1.8V and 44.1 C .
First trying:
01:18 pm : Started testing and collection data. Parameters: 0.09 A, 1.4V. Reference position: (0,0).
01:28 pm : Started snapping the screen. |
Fri Jun 2 14:28:40 2023, Pamella, Update, FLIR, FLIR project - Test without the black wall.
|
[Pamella]
Test without the black wall.
Note: So today i collected data for some positions in axis Y (height) for starting
analyses and compares the triangles shapes. I tried keep the same parameters every time.
First position:
01:20 pm :
Started testing and collection data. Parameters: 0.10 A, 1.6V. Reference position: (0,0.05).
01:30 pm : Started snapping the screen. Parameters: |
Thu Jun 8 14:51:58 2023, Pamella, Update, FLIR, FLIR- Distance
|
[Pamella, Tyler]
Today we change the distance between the FLIR camera and reflector (3D-Mask with mirrors and light). Now the distance is
0.2032 m.
Note: This distance is just for take a snap most close possible but we need move again for a little far way because in this distance
we can't move up and down the reflector for have data to compare.
|
Mon Jun 12 12:15:10 2023, Pamella, Update, FLIR, FLIR- Take data in the closest point.
|
[Pamella]
Used the closest point possible for the reflector in front of the FLIR camera.
11:32 am : Turned on the electronic device
(current on) for started taking data.
11:50 am: Started checking the temperature and the parameters.
12:04 pm: Started taking snap
after waited for 30 minutes with the current on. Parameters: Current: 0.13A , Volt: 1.8V and Temperature: 51.4 C.
Note: This snap is in the |
Fri Jun 16 16:17:13 2023, Pamella, Update, FLIR, FLIR - Change the position
|
[Pamella]
Today I change the distance between the FLIR camera and reflector (3D-Mask with mirrors and light). Now the distance is 0.3282 m.
Note: In this distance is possible move up and down the reflector and take data to compare.
The focal point inside the reflector keeping
like little problem, every time I tried adjust this I got some triangles is not with "perfect emission" (looks like different than the others). Also if |
Mon Jun 19 11:20:57 2023, Pamella, Update, FLIR, FLIR - Fixed some problems
|
[Pamella]
08:59 am: Turned on the electronic device (current on) for started taking data.
09:37 am: Tried understanding the
error in the focal point. I realized the pillars was in the wrong place and because of that we got problems to keep the reflector in the correct position
to FLIR focus.
09:58 am: Started checking the temperature and the parameters.Changed the pillars to the original position (0.5645m) just |