  548   Tue Apr 8 00:17:01 2025 MichaelUpdateInterferometer SimulationsSqueezing Performance Graphs for Case With and Without Toroidal Mirrors in LIGO
I've created some graphs for the frequency dependent observed squeezing level in LIGO for both the nominal case and the case where we include toroidal mirrors, giving some interesting results. https://docs.google.com/presentation/d/1RBr47hNaxFTdGrwys5ZCUEUOgVOVHmZ2B_5EQwY62IY/edit?usp=sharing
  129   Tue Jun 20 22:14:24 2023 Pamella, CaoInfrastructureVACShort term testing of vacuum heater controller units
[Pamella, Cao]

Fuse replacement

  • Replace blown 10A fuse in ucontroller outside cleanroom
  • Replace 10 A fuse in main power connection slot of the controller unit inside cleanroom
  • Pamella wiped down unit outside cleanroom.
  • Controller units turned on and temperature setpoint set to be 80 deg C
  • Temperature settle in approx. 15 minutes(as recorded by the RTD). No problems with fuses observed
  • Recording of pressure gauges (in Torr) :
    1. Before turning heater on :
      1. Gauge 1(main chamber): 3.73E-7
      2. Gauge 2(RGA line): 3.65E-7
      3. Gauge 3(Pump line): 3.8E-4
    2. After 15 minutes :
      1. Gauge 1(main chamber): 7.07E-7
      2. Gauge 2(RGA line): 6.12E-7
      3. Gauge 3(Pump line): 3.8E-4
  • Reduce setpoint temperature to 60 deg C due to Pinrani gauge (Gauge 3) temperature limit
  • Upon returned to lab to reduce temperature (35 minutes after turned on):
    1. Gauge 1(main chamber): 1.22E-6
    2. Gauge 2(RGA line): 9.98E-7
    3. Gauge 3(Pump line): 3.8E-4
  • Once temperature has settled to 60 C (approx 20 mins after changing setpoint), pressure readout showed:
    1. Gauge 1(main chamber): 1.37E-6
    2. Gauge 2(RGA line): 1.10E-6
    3. Gauge 3(Pump line): 3.8E-4
  • Heater left on for the whole afternoon, pressure readout upon returning to lab at 5:30 pm:
    1. Gauge 1(main chamber): 3.43E-6
    2. Gauge 2(RGA line): 2.61E-6
    3. Gauge 3(Pump line): 3.8E-4

  322   Tue Feb 13 04:05:32 2024 MichaelUpdateInterferometer SimulationsShoelaces 1 Layout Simulated in GTrace
I've worked on and have completed a first simulation of Cosmic Explorer's Shoelaces 1 layout. This is based off of Pooyan's original work with Gtrace much like the Long Crab 1 layout I worked on last week. This layout will allow me to quickly created the alternate shoelaces layouts. I've included an image of the dxf, and a desmos model for reference.
Attachment 1: shoelaces1_dxf.JPG
shoelaces1_dxf.JPG
Attachment 2: shoelaces1_desmos.JPG
shoelaces1_desmos.JPG
  163   Tue Jul 18 16:04:26 2023 PamellaUpdateFLIRSetup FLIR with black wall (black body)
[Pamella]
  • Today I tried get data the heater with the black screen but doesn't looks possible have just one "energy" point straight to FLIR camera. Tyler and I tried different current and temperatures but keep very bad data. I attached a snap below.
  • I attached a photo about the new setup below. The FLIR is in the most close point possible/safety with the heater. The heater is very close to the black wall but is not touch the screen so is safety.
Attachment 1: AcquisitionImage(Jul-18-2023_15_24).jpg
AcquisitionImage(Jul-18-2023_15_24).jpg
Attachment 2: IMG_8721.jpeg
IMG_8721.jpeg
Attachment 3: IMG_8722.jpeg
IMG_8722.jpeg
  505   Tue Jan 28 13:30:46 2025 shaneUpdateCDSSerial comms testing update
Attempted to communicate with the smaller vac pump (TwissTor 74) via Agilent software today. Was able to communicate with the pump via python serial connection code as usual, with no issues. When using the manufacturer software though, it was unable to 'locate' the pump and failed to connect to it. So manufacturer software works for the big (older) pump, but not the smaller, newer one. Unclear if this is somehow related to the fact that using the manufacturer software for the bigger pump involved manually connecting its controller to spica with a db9, and there was no obvious way to do that for the smaller pump's controller.
  419   Fri Aug 2 13:50:22 2024 ShaneUpdateCDSSerial Comm. Test (Agilent Turbo Pump)
Did a brief communication test with the agilent turbo pump today, to see if we could get serial communications up and running for it. Used a simplified python script with sockets package to establish a connection and send a simple command to query the pump's operational status. The connection was successful, and had no issues establishing. The command also sent successfully, and received a response. The response didn't make sense, though, as all the possible statuses correspond to integers 0-7, and this test returned the integer 15. Need to troubleshoot some more to figure out why it's returning nonsense values. Possible match-up issue with the way the information is being encoded on each end? At the very least, connection and command sending are both working fine, and this showed that the pin-out connections we were assuming (image attached) are correct for basic connection to work.
Attachment 1: pinouts.jpeg
pinouts.jpeg
  358   Mon Apr 8 14:43:29 2024 PooyanUpdateInterferometer SimulationsSIS update single and coupled cavities
[Pooyan, Cynthia]

Attached is a brief recap PDF file. A video file showing separate HOMs plots for the cavity scan with ETM08 surface map is also attached.

The codes are available at https://git.ligo.org/uc_riverside/hom-rh/-/tree/main/SIS

Attachment 1: IFOSim_SIS__update_4_8_24.pdf
IFOSim_SIS__update_4_8_24.pdf
Attachment 2: Screen_Recording_2024-03-31_at_2.46.29_AM.mov
  381   Mon Jun 24 14:28:51 2024 Cynthia UpdateInterferometer SimulationsSIS cavity with thermal effect
tried to run a cavity scan with thermal deformation and ring heater for ITM04 ETM08 (aLIGO mirrors). Not sure about the accuracy of the graph as there is some commands that still need to verified.
Attachment 1: ETM08thermal.png
ETM08thermal.png
  444   Mon Sep 23 08:29:49 2024 LukeUpdateInterferometer SimulationsRingheater update

Ringheater Update

If the link does not work here is the file.

Attachment 1: 20240923_Update.pptx
  513   Sun Feb 16 16:45:18 2025 Luke UpdateGeneralRingheater position optimization

Over the last couple weeks I have been working on finding the optimal position of the ringheater's thermal profile. 

Today I would like to give an update of where I am at and my next steps.

Using the python COMSOL interface I have been able to run and save deformation data sweeping through a great deal of potential combinations of widths and positions.

I then calculated their zernike coefficients and using a very simple "quality" function (02 - (40)*10 - (4-4)*10), where 02 stands for the zernike mode of quadratic deformation, I was able to generate a heat map of comparing the "quality" verses the width and position used. 

Seen below are four plots. The first is simply the 02 coefficient of the decomposition followed by the negative of 40 and 4-4 then the "quality."

This 'quality' function was an arbitrary choice on my part. I believe that my next step would either be defining a more useful function or using finesse to model the actual effects of this surface deformation.

Attachment 1: 02.png
02.png
Attachment 2: _40.png
_40.png
Attachment 3: _4-4.png
_4-4.png
Attachment 4: 02_40_4-4.png
02_40_4-4.png
  423   Mon Aug 12 16:35:30 2024 Luke Update Ringheater modeling Update
Attachment 1: HR_surface_deformation.png
HR_surface_deformation.png
Attachment 2: Irradiation_pattern_input.png
Irradiation_pattern_input.png
Attachment 3: HR_surface_deformation_other.png
HR_surface_deformation_other.png
  452   Wed Oct 2 12:05:42 2024 Luke Update Ringheater modeling Update

Power point slides

  502   Sat Jan 25 18:19:39 2025 Luke UpdateGeneralRingheater modeling Update

Here is a quick update on some of the things I have been working on regarding my project. 

  521   Sun Feb 23 16:00:07 2025 Luke UpdateScripts/ProgramsRingheater modeling Update

These are some plots:

The first shows the convergence of the 02 mode reducing the size of the mesh. The second shows the the numerical error of the zernike.

The first is found by sweeping a parameter that changes the size of the mesh. The HR surface was set to half a cm for all values.

The second by taking the inner product of a zernike mode with its self and calculating its deviation from pi for varying fineness of the mesh.

Attachment 1: mesh_convergence.png
mesh_convergence.png
Attachment 2: numerical_error_in_innerproduct_of_zernike_basis_elemets.png
numerical_error_in_innerproduct_of_zernike_basis_elemets.png
  569   Sun May 4 18:17:45 2025 Luke UpdateScripts/ProgramsRingheater modeling Update

Slides

I have changed some properties of the thermal model and am re-running the thermal sweeping

I have also been messing around with making a logo

  584   Mon Jun 2 09:45:06 2025 Luke UpdateScripts/ProgramsRingheater modeling Update

Slides

I have added some slides to my meeting updates. The updates include: my choice in position and width, some figures I have added to my write up, and what I think my immediate steps are to wrap up.

I have also made a new FROSTI model that conducts its raytracing in real time. Something that was severely lacking in the previous model.

  430   Tue Aug 27 18:37:40 2024 LukeUpdateInterferometer SimulationsRingheater model update
Updated the model to produce a more circular deformation in the HR surface. The first three attachments are from irradiance patterns gotten from ray tracing. The last is from a pre-defined irradiance pattern.
Attachment 1: Initial_1W.png
Initial_1W.png
Attachment 2: Increased_rays_100W.png
Increased_rays_100W.png
Attachment 3: Increased_rays_more_100W.png
Increased_rays_more_100W.png
Attachment 4: Initial_100W.png
Initial_100W.png
  541   Sun Mar 23 15:39:06 2025 Luke JohnsonUpdateScripts/ProgramsRingheater Location optimization
Attached are some plots that show a new parameter sweep with a finer mesh then before. I have also been able to get a heatmap of power of HOMs in a very simple finesse model.
Attachment 1: _4-4.png
_4-4.png
Attachment 2: _40.png
_40.png
Attachment 3: 02.png
02.png
Attachment 4: HOM_power.svg
HOM_power.svg
  439   Mon Sep 16 07:28:16 2024 LukeUpdateInterferometer SimulationsRing heater update
Attachment 1: 20240916_Ringheater_updates.pptx
  403   Sat Jul 13 15:09:04 2024 LukeUpdateGeneralRing heater COMSL model update

After the feedback from last meeting and Liu's help narrowing down what I should do to improve the model. I made some changes: First with Liu's help I made the proportions of the test mass and ring heater much more reasonable and parametrized by constants. Second from Cao's paper "FROSTI Nonimaging Reflector Design" Liu showed me what I should do to define the elliptical mirrors. Third during Friday's modeling/programming meeting walked me through getting the different irradiance plots to work. 

Attachment 1: image_2024-07-13_150654436.png
image_2024-07-13_150654436.png
Attachment 2: image_2024-07-13_150704735.png
image_2024-07-13_150704735.png
Attachment 3: image_2024-07-13_150716079.png
image_2024-07-13_150716079.png
Attachment 4: image_2024-07-13_150726593.png
image_2024-07-13_150726593.png
  342   Tue Feb 27 03:26:28 2024 MichaelUpdateInterferometer SimulationsReverse aLIGO Layout Created in Gtrace
I've created the simulation for reverse aLIGO layout in gtrace. Attached are the desmos model and the output dxf file. From here Pooyan and I plan to create a brief report of our progress to the CE optical design group.
Attachment 1: reverse_aligo_desmos.JPG
reverse_aligo_desmos.JPG
Attachment 2: reverse_aligo_dxf.JPG
reverse_aligo_dxf.JPG
  344   Wed Feb 28 12:02:08 2024 TylerUpdateGeneralResistors for Heater Elements Update
Power Res (Ohm) RTD Res (Ohm)

Heater 1= 72.8; 80.6

Heater 2= 69.5; 80.8

Heater 3= 70; 83.2

Heater 4= 70.6; 78.7

Heater 5= 69.9; 80.6

Heater 6= 71.1; 78.2

Heater 7= 68.5; 76.8

Heater 8= 70.1; 82.8

Quote:
Power Res (Ohm) RTD Res (Ohm)

Heater 1= 73.6; 81.8

Heater 2= 70.4; 82.1

Heater 3= 71; 84.5

Heater 4= 71.5; 80

Heater 5= 70.5; 81.7

Heater 6= 72; 79.4

Heater 7= 69.2; 78.2

Heater 8= 71.1; 84.2

 

  307   Wed Jan 17 15:47:49 2024 AidenUpdateGeneralResistors for Heater Elements
Power Res (Ohm) RTD Res (Ohm)

Heater 1= 73.6; 81.8

Heater 2= 70.4; 82.1

Heater 3= 71; 84.5

Heater 4= 71.5; 80

Heater 5= 70.5; 81.7

Heater 6= 72; 79.4

Heater 7= 69.2; 78.2

Heater 8= 71.1; 84.2

  517   Tue Feb 18 11:19:13 2025 Luke ConfigurationVACRepositioning of the lid's temperature probe
Before the recent bake I slightly repositioned the temperature probe on the lid from beside the heater tape to under the heater tape. This was done to better know and control the temperatures of the chamber while baking. It has appeared to work with the temperatures being held very close to the 120C target.
  170   Mon Jul 24 14:55:53 2023 JonUpdateVACRemoved extension power cable
I removed the extension cable that was powering the leftmost heater controller, since there is no bake currently happening. It is currently powering the LED over the electronics bench, and can be removed if needed. I will be ordering more extension cords to permanentize our setups.
  466   Tue Oct 29 16:37:35 2024 TylerUpdateElectronicsRed Pitaya OS Update

The Red Pitaya ecosystem has been upgraded to OS 2.00-35, with a key feature being greater freedom in adjusting the sampling frequency for signal analysis. Before, decimation factors could only be applied if they were a power of 2 (i.e 2,4,8,16,...) up to 65536. Now, the factors can be any power of two up to 16, and any whole number greater than 16 up to 65536. Further information can be found here.

  78   Tue Apr 25 11:56:37 2023 JonUpdateVLC ElectronicsRed Pataya has arrived
The Red Pataya 125-14 starter kit that we ordered for locking the 532 nm cavity has arrived. I left it laying on the optical table near the laser.
Attachment 1: Red_Pataya.jpg
Red_Pataya.jpg
  366   Mon May 13 13:03:41 2024 TylerUpdateFLIRReadout Code Updates
[Tyler]

Some changes have been made to the FLIR readout code to help improve its functionality:

  • More accurate temperature readings than before due to updates in the calculation procedure. A bug was causing one of the parameters to not update correctly; this is now fixed.
  • Saved data now stored in HDF5 files rather than CSV.
  • User can now enable automatic data storage by specifying a collection interval (in minutes). The choice of manually saving data is still present if desired.
Below is an image of the graphical interface. This is an old screenshot. Visually, there is no difference between the older and newer version. The differences come from the list above, which help the user more reliably measure and store data for later analysis.

Attachment 1: AcquisitionImage(Jul-18-2023_15_24).jpg.png
AcquisitionImage(Jul-18-2023_15_24).jpg.png
  313   Fri Feb 2 16:56:56 2024 JonUpdateCDSRTS model implemented for FROSTI RTD readouts

Summary

Today I finished implementing an RTS model to read out the integrated FROSTI RTDs (temperature sensors) via the CyMAC. The model is named "MSC" and is located at cymac:/opt/rtcds/usercode/models/c1msc.mdl. We successfully tested it with the heater elements operating in vacuum at low power (12 VDC), finding them to reach an average steady-state temperature of 160 C.

From the cymac host, the MEDM control screen can be accessed with the terminal command "sitemap" (from any directory).

Measurement Technique

Each FROSTI heater element [299] contains an internal two-wire RTD placed near the front emitting surface, which enables the temperature of the blackbody emitter to be directly monitored. From the measured temperature and the emissivity of the uncoated aluminum nitride surface (known to be ~1 in the IR), the radiated source-plane power can also be estimated.

The resistance of each RTD is measured via a ratiometric technique. The RTDs are powered in series with a 1 kΩ reference resistor located inside the readout chassis [305], whose temperature is not changing. The signal is obtained by taking the ratio of the voltage difference across each individual RTD to the voltage difference across the reference resisitor. The advantage of this technique is that the ratio of  the voltage differences is insensitive to changes in the current through the resistors (since they are all in series; see [271] for wiring diagram).

Implementation Detail

The signal flow is shown in Attachment 1. The eight RTD signals enter through ADC channels 0-7, along with the reference resistor signal on channel 8. The first set of filter modules apply a calibration gain to convert the signals from raw ADU counts to units of input-referred voltage. The ratio of each RTD signal to the reference resistor signal is then taken. The second set of filter modules multiply the voltage-difference ratios by the resistance of the reference resistor, 1 kΩ ± 0.01%, to obtain the RTD resistances in physical units of ohms.

Finally, a freeform math module is used to invert the quadratic relation between each RTD's resistance and temperature. The final signals passed to the third set of filter modules are the RTD temperatures in physical units of degrees C. The temperatures of the tungsten RTDs are estimated assuming TCR coefficients of A=0.0030 C-1 (±10%) and B=1.003E-6 C-2, which were provided by the manufacturer.

One DAC channel is used to provide the excitation voltage for the RTD measurement, which is visible on the far right of the control screen. At its maximum output voltage of +10 V, the DAC can drive a maximum current of 10 mA.

Attachment 1: sitemap_screen.png
sitemap_screen.png
  305   Tue Jan 16 12:20:21 2024 TylerConfigurationElectronicsRTD Readout Chassis Update 2

I performed another continuity test on the RTD chassis wiring, and everything seems to be set up correctly. The chassis should be ready for installation.

Quote:

Below is the current state of the RTD readout chassis wiring. Initial continuity tests seem good, will run through one more time to confirm.

Quote:

The custom front and rear panels for the RTD readout chassis arrived last Friday. I installed them in the chassis frame to check their fit. They fit very well, so all that now remains is to complete the internal wiring and test the connections.

The chassis panel designs are archived to LIGO-D2300452 and LIGO-D2300453.

Quote:

Below are a basic diagram of what the RTD measurement circuit logically looks like and an example schematic of the actual wiring. The schematic wiring will be placed internally into a chassis, connected to the RTDs via DB25 cable.

Note: The DB25 Breakout Board connector is Female, not Male.

 

 

Attachment 1: IMG_8146.jpg
IMG_8146.jpg
Attachment 2: IMG_8147.jpg
IMG_8147.jpg
  300   Tue Jan 9 12:08:59 2024 TylerConfigurationElectronicsRTD Readout Chassis Update

Below is the current state of the RTD readout chassis wiring. Initial continuity tests seem good, will run through one more time to confirm.

Quote:

The custom front and rear panels for the RTD readout chassis arrived last Friday. I installed them in the chassis frame to check their fit. They fit very well, so all that now remains is to complete the internal wiring and test the connections.

The chassis panel designs are archived to LIGO-D2300452 and LIGO-D2300453.

Quote:

Below are a basic diagram of what the RTD measurement circuit logically looks like and an example schematic of the actual wiring. The schematic wiring will be placed internally into a chassis, connected to the RTDs via DB25 cable.

Note: The DB25 Breakout Board connector is Female, not Male.

 

Attachment 1: IMG_8105.jpg
IMG_8105.jpg
  364   Thu May 2 22:43:36 2024 TylerUpdateElectronicsRTD Readout Chassis Redesign
[Tyler, Jon]

Today the FROSTI RTD readout chassis underwent a redesign:

Instead of the original ratiometric method, which involved wiring the FROSTI RTDs in series, each element is individually powered by separate excitations. Each element additionally possesses its own reference resistor of 100 Ohm. Now, if an RTD experiences an electrical short, it should not affect the measurements of the others in sequence, as it had with the original design.

Attachment 1: IMG_9013.jpg
IMG_9013.jpg
  298   Fri Dec 29 16:02:27 2023 JonConfigurationElectronicsRTD Readout Chassis

The custom front and rear panels for the RTD readout chassis arrived last Friday. I installed them in the chassis frame to check their fit. They fit very well, so all that now remains is to complete the internal wiring and test the connections.

The chassis panel designs are archived to LIGO-D2300452 and LIGO-D2300453.

Quote:

Below are a basic diagram of what the RTD measurement circuit logically looks like and an example schematic of the actual wiring. The schematic wiring will be placed internally into a chassis, connected to the RTDs via DB25 cable.

Note: The DB25 Breakout Board connector is Female, not Male.
Attachment 1: front.jpeg
front.jpeg
Attachment 2: rear.jpeg
rear.jpeg
Attachment 3: overhead.jpeg
overhead.jpeg
  351   Thu Mar 21 16:56:42 2024 TylerUpdateDAQRTD Parameter Calibration
[Jon,Tyler]

We noticed that the RTD temperature readings given on the Cymac were off, and traced the issue to miscalibration in the relationship between the resistance and temperature of each RTD (Callendar-Van Dusen eqn). Below is the table of values inferred from independent measurements of temperature and resistance to rectify this problem. This data was then fitted to better determine the coefficients present in the temperature-resistance relation:

       R_0 (ohm)   Alpha    Beta

RTD 0   80.8674   0.001315   4.273e-6

RTD 1   79.5704   0.001887   3.7873e-6

RTD 2   81.7334   0.002014   2.1724e-6

RTD 3   74.3060   0.003677   3.6022e-8

RTD 4   81.1350   0.001761   2.3598e-6

RTD 5   77.9610   0.002423   -7.5192e-7

RTD 6   78.7980   0.001373   6.2909e-6

RTD 7   83.8616   0.001890   3.3529e-6

Attachment 1: RTD_Calib-2.png
RTD_Calib-2.png
Attachment 2: IMG_8569.jpg
IMG_8569.jpg
  354   Mon Mar 25 10:55:33 2024 TylerUpdateDAQRTD Parameter Calibration
Refitted RTD calibration, neglecting quadratic term:

       R_0 (ohm)   Alpha (1/C)

RTD 0   79.3962   0.002031

RTD 1   78.2874   0.002530

RTD 2   80.9775   0.002381

RTD 3   74.2947   0.003684

RTD 4   80.3199   0.002157

RTD 5   78.2106   0.002297

RTD 6   76.6825   0.002438

RTD 7   82.6645   0.002458


Measurements taken can be found here. An uncertainty of 1 C was assumed for temperature.

Quote:
[Jon,Tyler]

We noticed that the RTD temperature readings given on the Cymac were off, and traced the issue to miscalibration in the relationship between the resistance and temperature of each RTD (Callendar-Van Dusen eqn). Below is the table of values inferred from independent measurements of temperature and resistance to rectify this problem. This data was then fitted to better determine the coefficients present in the temperature-resistance relation:

       R_0 (ohm)   Alpha    Beta

RTD 0   80.8674   0.001315   4.273e-6

RTD 1   79.5704   0.001887   3.7873e-6

RTD 2   81.7334   0.002014   2.1724e-6

RTD 3   74.3060   0.003677   3.6022e-8

RTD 4   81.1350   0.001761   2.3598e-6

RTD 5   77.9610   0.002423   -7.5192e-7

RTD 6   78.7980   0.001373   6.2909e-6

RTD 7   83.8616   0.001890   3.3529e-6

 

Attachment 1: RTD_Calib_nobeta.png
RTD_Calib_nobeta.png
  355   Tue Mar 26 13:51:56 2024 TylerUpdateDAQRTD Parameter Calibration

Another re-fit, but this time the quadratic coefficient (beta) is set to 1.003e-6:

       R_0 (ohm)   Alpha (1/C)

RTD 0   79.7386   0.001863

RTD 1   78.6248   0.002359

RTD 2   81.3254   0.002211

RTD 3   74.6127   0.003509

RTD 4   80.6652   0.001988

RTD 5   78.5450   0.002127

RTD 6   77.0144   0.002268

RTD 7   83.0204   0.002288

Quote:
Refitted RTD calibration, neglecting quadratic term:

       R_0 (ohm)   Alpha (1/C)

RTD 0   79.3962   0.002031

RTD 1   78.2874   0.002530

RTD 2   80.9775   0.002381

RTD 3   74.2947   0.003684

RTD 4   80.3199   0.002157

RTD 5   78.2106   0.002297

RTD 6   76.6825   0.002438

RTD 7   82.6645   0.002458


Measurements taken can be found here. An uncertainty of 1 C was assumed for temperature.

Quote:
[Jon,Tyler]

We noticed that the RTD temperature readings given on the Cymac were off, and traced the issue to miscalibration in the relationship between the resistance and temperature of each RTD (Callendar-Van Dusen eqn). Below is the table of values inferred from independent measurements of temperature and resistance to rectify this problem. This data was then fitted to better determine the coefficients present in the temperature-resistance relation:

       R_0 (ohm)   Alpha    Beta

RTD 0   80.8674   0.001315   4.273e-6

RTD 1   79.5704   0.001887   3.7873e-6

RTD 2   81.7334   0.002014   2.1724e-6

RTD 3   74.3060   0.003677   3.6022e-8

RTD 4   81.1350   0.001761   2.3598e-6

RTD 5   77.9610   0.002423   -7.5192e-7

RTD 6   78.7980   0.001373   6.2909e-6

RTD 7   83.8616   0.001890   3.3529e-6

 

 

Attachment 1: Screenshot_2024-03-26_at_1.23.27_PM.png
Screenshot_2024-03-26_at_1.23.27_PM.png
  416   Mon Jul 29 13:39:16 2024 TylerUpdateDAQRTD Parameter Calibration
[Tyler]

Using the data taken during the FROSTI testing at Caltech, I attempted to find a better calibration of the RTD sensors, given our past issues with inaccurate readings. The fit parameters, alpha and beta, are still all different from the initial values given to us by Fralock (alpha = .003, beta = 1.003e-6, R_0 was not given), but the true values will differ based on factors such as part geometry.

Quote:
Refitted RTD calibration, neglecting quadratic term:

       R_0 (ohm)   Alpha (1/C)

RTD 0   79.3962   0.002031

RTD 1   78.2874   0.002530

RTD 2   80.9775   0.002381

RTD 3   74.2947   0.003684

RTD 4   80.3199   0.002157

RTD 5   78.2106   0.002297

RTD 6   76.6825   0.002438

RTD 7   82.6645   0.002458


Measurements taken can be found here. An uncertainty of 1 C was assumed for temperature.

Quote:
[Jon,Tyler]

We noticed that the RTD temperature readings given on the Cymac were off, and traced the issue to miscalibration in the relationship between the resistance and temperature of each RTD (Callendar-Van Dusen eqn). Below is the table of values inferred from independent measurements of temperature and resistance to rectify this problem. This data was then fitted to better determine the coefficients present in the temperature-resistance relation:

       R_0 (ohm)   Alpha    Beta

RTD 0   80.8674   0.001315   4.273e-6

RTD 1   79.5704   0.001887   3.7873e-6

RTD 2   81.7334   0.002014   2.1724e-6

RTD 3   74.3060   0.003677   3.6022e-8

RTD 4   81.1350   0.001761   2.3598e-6

RTD 5   77.9610   0.002423   -7.5192e-7

RTD 6   78.7980   0.001373   6.2909e-6

RTD 7   83.8616   0.001890   3.3529e-6

 

 

Attachment 1: RTD_Recal_params.png
RTD_Recal_params.png
Attachment 2: RTD_recal_plots_fin.png
RTD_recal_plots_fin.png
  271   Mon Nov 20 10:10:50 2023 TylerConfigurationElectronicsRTD Logic/Schematic Diagrams

Below are a basic diagram of what the RTD measurement circuit logically looks like and an example schematic of the actual wiring. The schematic wiring will be placed internally into a chassis, connected to the RTDs via DB25 cable.

Note: The DB25 Breakout Board connector is Female, not Male.
Attachment 1: FIN_RTD_circuit.png
FIN_RTD_circuit.png
Attachment 2: Sample_Circuit_Schematic.png
Sample_Circuit_Schematic.png
  310   Tue Jan 23 12:17:41 2024 TylerUpdateElectronicsRTD Chassis

After updating the wiring in the RTD Chassis, a signal is now seen at each ADC input. However, there seems to be a discrepancy between the voltages I measured out with the multimeter (see below). Next steps include:

  • Finish final debugging
  • Calibrate ADC inputs with known voltage source (likely to use DAC).

Voltage Readings:

RTD 1: 0.576 V

RTD 2: 0.578 V

RTD 3: 0.598 V

RTD 4: 0.563 V

RTD 5: 0.477 V

RTD 6: 0.463 V

RTD 7: 0.456 V

RTD 8: 0.491 V

Reference Resistor: 5.463 V

Total Voltage: 9.665 V

Attachment 1: rtd_updated_circuitry.jpg
rtd_updated_circuitry.jpg
  311   Tue Jan 30 11:36:19 2024 TylerUpdateElectronicsRTD Chassis

Quote:

After updating the wiring in the RTD Chassis, a signal is now seen at each ADC input. However, there seems to be a discrepancy between the voltages I measured out with the multimeter (see below). Next steps include:

  • Finish final debugging
  • Calibrate ADC inputs with known voltage source (likely to use DAC).

Voltage Readings:

RTD 1: 0.576 V

RTD 2: 0.578 V

RTD 3: 0.598 V

RTD 4: 0.563 V

RTD 5: 0.477 V

RTD 6: 0.463 V

RTD 7: 0.456 V

RTD 8: 0.491 V

Reference Resistor: 5.463 V

Total Voltage: 9.665 V

 

After further modification of the RTD readout chassis (i.e. adding resistors, placing reference resistor in front of RTDs), here are the following direct measurements:

RTD 1: 0.484 V

RTD 2: 0.486 V

RTD 3: 0.503 V

RTD 4: 0.474 V

RTD 5: 0.495 V

RTD 6: 0.483 V

RTD 7: 0.476 V

RTD 8: 0.510 V

Reference: 5.847 V


Here are the Cymac signal readings:

RTD 1: 74

RTD 2: 67

RTD 3: 73

RTD 4: 45

RTD 5: 82

RTD 6: 75

RTD 7: 70

RTD 8: 71

Reference: 884


The one (possible) discrepancy here is the readout for RTD 4 via Cymac, since it's signal reading is ~30 counts lower than the others. I do not believe this is a wiring issue due to the direct measurements taken.

  264   Mon Nov 13 11:07:50 2023 TylerUpdateVACRTD Analysis

After initial analysis from last week on a single RTD, I then extended to looking at all 8 in series with R_ref (set to 1 kOhm). Shown below are the edge cases for the setup:

  • RTDs are all at ambient lab temperature. This would correspond to a minimum resistance value.
  • RTDs all read out 400 C. This gives the maximum resistance value.

The results show that indeed only a few mA of current is drawn even at room temperature (a little above 5.5 mA), and this will continue to decrease with increasing temperature. The voltage across a single terminal, at a maximum, is only about 5.4 V.

Attachment 1: Screenshot_2023-11-13_at_11.05.45_AM.png
Screenshot_2023-11-13_at_11.05.45_AM.png
Attachment 2: Screenshot_2023-11-13_at_11.06.04_AM.png
Screenshot_2023-11-13_at_11.06.04_AM.png
  498   Tue Jan 14 10:27:14 2025 TylerUpdateTCSRIN Updates
[Tyler]

Attached below are updated plots for the FROSTI RIN measurements for Jan 14 group meeting.

Attachment 1: ASD_plots_01_14_2025.pdf
ASD_plots_01_14_2025.pdf
  486   Wed Dec 11 13:39:30 2024 TylerUpdateElectronicsRIN Update 12/11/2024
[Tyler]

Attached below are updated ASD plots for the FROSTI RIN measurements. The parameters set for this are the following:

  • DFT Size (N): 16384
  • Sampling Frequency (F_s): 7.629 kHz
  • Resolution (F_s/N): 0.93
  • CH0 DC Voltage w/FROSTI ON: 113.6 mV
  • CH0 DC Voltage w/FROSTI OFF: -5.7 mV
  • CH1 DC Voltage w/FROSTI ON: 113.0 mV
  • CH1 DC Voltage w/FROSTI OFF: -5.7 mV

Each measurement was recorded over a roughly two-day period. Before each spectrum was computed, the time-series signals were AC-coupled (i.e. the DC offset was subtracted from the data). The low-pass filters are still attached for dark and light noise measurements. ADC noise is measured with two 50-ohm terminators attached to the Red Pitaya inputs rather than the IR photodetectors.

Attachment 1: Updated_ASD_plots.pdf
Updated_ASD_plots.pdf
  457   Wed Oct 9 13:52:31 2024 TylerUpdateTCSRIN Update 10/09/2024

I tried adjusting the gain settings on the photodetectors to check if this would help improve the RIN spectra measurements. Overall, it doesn't look like it does, and if anything, looks worse. I assume this is so because as the gain is lowered, the amount of detectable signal from the FROSTI becomes smaller and smaller.

Attachment 1: RIN_plots_CH0.pdf
RIN_plots_CH0.pdf
  470   Wed Nov 13 14:03:32 2024 TylerUpdateElectronicsRIN Update
[Tyler]

We've added two low-pass filters in hopes of reducing any potential aliasing that may be introducing additional noise into the power spectra for the RIN measurements. It still looks like the noise levels are too high. Attached below are some recent measurements taken with the FROSTI powered on and off.

Attachment 1: IMG_0463.jpg
IMG_0463.jpg
Attachment 2: CH0_CH1_ASDs.pdf
CH0_CH1_ASDs.pdf
  477   Wed Nov 20 12:59:37 2024 TylerUpdateElectronicsRIN Update
I went ahead and compared the noise spectrum of the ADC to those of the photodetectors with the FROSTI on and off. As discussed last meeting, it looks like the measurements with the Red Pitaya (RP) are limited by the ADC noise floor. Another avenue to explore in this measurement could be switching to the cymac ADCs.
Attachment 1: ASD_plots.pdf
ASD_plots.pdf
  479   Wed Nov 27 13:48:01 2024 TylerUpdateElectronicsRIN Update
[Tyler]

I downgraded the Red Pitaya back to OS 2.00-18 due to runtime errors during measurement. Once I did this, the device appeared to work much better than it has the last few weeks. First, it appears we can actually see the cutoff of the added low-pass filters that were added in to the RIN setup. Second, there does appear to be a difference again between the FROSTI ON state versus the dark state (i.e. FROSTI OFF). A long measurement of the ADC noise floor in the current configuration still needs to be recorded, but it does appear that the recent highlighted issues with the Red Pitaya have been solved.

Attachment 1: New_ASD_plots.pdf
New_ASD_plots.pdf
  531   Tue Mar 4 10:28:58 2025 TylerUpdateTCSRIN Plot Updates
Attachment 1: Dark_bin_veto.pdf
Dark_bin_veto.pdf
Attachment 2: Mock_final_plot_inst.pdf
Mock_final_plot_inst.pdf
  422   Mon Aug 12 16:24:34 2024 TylerUpdateCleanroomRIN Measurement Update 1
[Tyler]

For some preliminary tests, I moved the IR photodetectors outside of the cleanroom and onto the other optical table. The basic goal was to obtain a signal from both photodetectors. To achieve this, one of the heater cartridges used for early FLIR measurements months ago was hooked up to a power supply (PS). The PS was set to supply 0.20 A with a voltage of 2.8 V; the corresponding power is thus 0.56 W. With this, I was able to measure a signal using the Red Pitaya, the device that will be used for following RIN measurements.

Quote:
[Tyler]

I have begun moving parts into the cleanroom for the upcoming FROSTI RIN tests that will be conducted within the next few weeks. While waiting for the rest of the equipment to arrive to perform the full-scale tests, I have additionally moved the FROSTI under the shelf above the optical table, where it will stay for the meantime. As always, please use caution when in the cleanroom. Aside from the FROSTI, the IR photodetectors that will be used for the test are delicate and costly to replace.

 

Attachment 1: Basic_setup.jpg
Basic_setup.jpg
Attachment 2: RP.jpg
RP.jpg
  417   Mon Jul 29 14:30:16 2024 TylerUpdateCleanroomRIN Measurement Set-up
[Tyler]

I have begun moving parts into the cleanroom for the upcoming FROSTI RIN tests that will be conducted within the next few weeks. While waiting for the rest of the equipment to arrive to perform the full-scale tests, I have additionally moved the FROSTI under the shelf above the optical table, where it will stay for the meantime. As always, please use caution when in the cleanroom. Aside from the FROSTI, the IR photodetectors that will be used for the test are delicate and costly to replace.

Attachment 1: RIN_FROSTI.jpg
RIN_FROSTI.jpg