ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 4 of 10  Not logged in ELOG logo
ID Datedown Author Type Category Subject Text Attachments
  321   Tue Feb 13 01:26:30 2024 PeterUpdateInterferometer SimulationsCARM Power SimulationsCao's simulations of the circulating power
and gouy phase through a single arm cavity
of the interferometer have been reproduced.
 Scenario_3_CARM.pdfScenario_3_CARM_Gouy.pdf 
  320   Mon Feb 12 17:35:47 2024 AidenUpdateVACHeater Element RGA ScanTook more RGA data before and after increasing
the heater elements to 300 degC and before
heating them up.

 bake10_240212_Elements_ArO.pngbake10_240212_Elements_ArC.pngbake10_240212_Elements_300C_ArC.png 
  319   Thu Feb 8 17:37:48 2024 AidenUpdateVACHeater Element RGA ScanTook more RGA data now that the heaters are
powered by 18V. The pressure of the system
during the data taking was 3.8 e-8 torr.
 bake10_240208_Elements_ArO.pngbake10_240208_Elements_ArC.png 
  318   Wed Feb 7 12:43:22 2024 shaneUpdateCleanroomcleanroom particle counts (full 5 zone measurement)Here's today's full 5 zone measurement of
the cleanroom. Everything is back under the
requirement. 
 24.png 
  317   Tue Feb 6 22:40:25 2024 MichaelUpdateScripts/ProgramsLong Crab 1 Design Created In GtraceWorked on and completed the python code for
the simulation of the Long Crab 1 layout
for Cosmic Explorer basing off of Pooyan's
 Long_Crab1.pnglong_crab_1_desmos.PNG 
  316   Mon Feb 5 14:17:52 2024 AidenUpdateVACHeater Element RGA ScanHere are the new RGA scans for the powered
Heater elements. The pressure at the time
of taking data was 2.88 e-8 torr. The HC
 bake10_240205_Elements_ArO.pngbake10_240205_Elements_ArC.png 
  315   Fri Feb 2 19:18:24 2024 shaneUpdateCleanroomcleanroom cleaning and particle count


[Aiden, Shane,
Luis, Luke]


cleaning cleanroom
and particle count
  
  314   Fri Feb 2 19:08:20 2024 AidenUpdateVAC1st Hot Element RGA ScanHere are the measurements for the RGA scan
of the elements while on at around 160C.
The pressure of the chamber during the test
 bake10_240202_Elements_ArC.pngbake10_240202_Elements_ArO.png 
  313   Fri Feb 2 16:56:56 2024 JonUpdateCDSRTS model implemented for FROSTI RTD readoutsSummary
Today I finished implementing
an RTS model to read out the integrated FROSTI
RTDs (temperature sensors) via the CyMAC.
 sitemap_screen.png 
  312   Wed Jan 31 14:37:26 2024 ShaneSummaryCDSpath directions for CyMAC model and parts libraryPath to cds parts library in Matlab simulink:
/usr/share/advligorts/src/src/epics/simLink.
File name CDS_PARTS.mdl
Path to user models:
  
  311   Tue Jan 30 11:36:19 2024 TylerUpdateElectronicsRTD Chassis



  
  310   Tue Jan 23 12:17:41 2024 TylerUpdateElectronicsRTD Chassis
After updating the wiring in the RTD
Chassis, a signal is now seen at each ADC
input. However, there seems to be a discrepancy
 rtd_updated_circuitry.jpg 
  309   Thu Jan 18 18:06:49 2024 shaneUpdateCleanroomcleanroom 5 zone particle count measurementHere's today's full five zone measurement
of the cleanroom
 24.png 
  308   Thu Jan 18 15:13:37 2024 AidenUpdateVACVAC Heating System Update[Aiden]

Took more data today and the
chamber and elements are showing an even
lower HC level than we have gotten before.
 bake10_240118_Elements_ArO.pngJanuary_18_Ar_Open_Elements_Analyzed.png 
  307   Wed Jan 17 15:47:49 2024 AidenUpdateGeneralResistors for Heater ElementsPower         Res (Ohm) RTD Res (Ohm)

Heater
1= 73.6; 81.8

Heater 2= 70.4; 82.1

Heater
3= 71; 84.5

Heater 4= 71.5; 80

Heater
  
  306   Tue Jan 16 16:11:41 2024 AidenUpdateVAC [Aiden,Luis]

Below is the data for the
most recent bake. I believe the chamber is
cleaner than it is actually showing as the
 bake10_240116_Elements_ArO.pngbake10_240116_Elements_ArC.png 
  305   Tue Jan 16 12:20:21 2024 TylerConfigurationElectronicsRTD Readout Chassis Update 2
I performed another continuity test on
the RTD chassis wiring, and everything seems
to be set up correctly. The chassis should
 IMG_8146.jpgIMG_8147.jpg 
  304   Tue Jan 16 10:01:21 2024 PeterUpdateVLC UpdateVLC Faraday Isolator and Mode MatchingAttached is a PDF of my weekly updates.   VLC_Mode_Matching_Design_-_Remastered.pdf 
  303   Mon Jan 15 22:29:34 2024 JonInfrastructureGeneralCabinet installation & lab clean-up completed[Jon, Tyler, Aiden, Shane, Pooyan, Michael,
Cynthia, Luke]
On Wednesday, we completed long list
 1129.png1119.png 
  302   Wed Jan 10 15:27:18 2024 ShaneUpdateCleanroomcleanroom cleaning and particle count


[Aiden, Shane]


cleaning
cleanroom and particle count


2:03 pm: changed sticky
  
  301   Tue Jan 9 16:35:09 2024 AidenUpdateVACVAC System Leak and Heating[Luis, Luke, Aiden]

Leak tested each
flange and weld and only found two flanges
to have noticeable leaks with the electron
  
  300   Tue Jan 9 12:08:59 2024 TylerConfigurationElectronicsRTD Readout Chassis Update
Below is the current state of the RTD
readout chassis wiring. Initial continuity
tests seem good, will run through one more
 IMG_8105.jpg 
  299   Mon Jan 8 20:24:53 2024 AidenUpdateGeneral [Jon, Aiden]

Installed the heater elements
into their fixture and prepped the cables
by twisting the wires into pairs. We also
 IMG_4888.jpgIMG_4886.jpgIMG_4887.jpg 
  298   Fri Dec 29 16:02:27 2023 JonConfigurationElectronicsRTD Readout ChassisThe custom front and rear panels for the
RTD readout chassis arrived last Friday.
I installed them in the chassis frame to
 front.jpegrear.jpegoverhead.jpeg 
  297   Wed Dec 20 10:33:34 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129Update: I
have completed permanent routing of the electrical
cables. I also ran the ultrasonic washer's
  
  296   Tue Dec 19 15:45:05 2023 AidenUpdateVACVacuum Chamber Baking UpdateTook RGA data for the macor parts inside of
the chamber. With the Ar open the HC levels
read 30 torrl/s which is around where it
 bake9_231219_Macor_ArO.pngbake9_231219_Macor_ArC.png 
  295   Mon Dec 18 15:51:49 2023 AidenUpdateVACVAC System Heating UpdateAfter letting the chamber cool down I put
the electronics back on and turned the RGA
element back on. No data has been taken yet
  
  294   Sun Dec 17 21:04:15 2023 JonInfrastructureClean & BakeClean and bake lab migrated to 1129[Jon, Tyler, Aiden, Luke]
On Friday we completed assembly of
the new stainless steel-topped benches in
 IMG_0781.pngIMG_0782.png 
  293   Sun Dec 17 19:43:18 2023 AidenUpdateVACVac Heating Update[Aiden]

I measured the temperature of
the flanges where some of the electronics
will go and I found that the RGA flange was
  
  292   Fri Dec 15 14:03:02 2023 AidenHowToVACVacuum Chamber Opening[Aiden]

1. Turn off the RGA filament
and disconnect it.

2. Record the pressure
and then close the angle valve and gate valve
  
  291   Mon Dec 11 16:20:17 2023 JonSummaryTCSFROSTI Assembly ProcedureBelow is the procedure we will follow to
assemble the FROSTI prototype.

Install SS guide rods and
  
  290   Mon Dec 11 12:58:57 2023 Shane, LuisUpdateCDSDAC-ADC loopback test debugging[Luis, Shane]

Working on debugging last
week's weird results for the ADC-DAC loopback
test for channels 14 and 15. With DAC output
  
  289   Sat Dec 9 12:34:12 2023 JonUpdateGeneralElectronics workshop migrated to 1129[Jon, Tyler, Shane, Luis]
On Wednesday we completed the migration
of the electronics workshop from 1119 to
 IMG_0765.jpgIMG_0767.jpeg 
  288   Fri Dec 8 11:15:21 2023 PeterUpdateVLC UpdateVLC AssemblyThe optics of the visible light cavity have
been assembled. The mode matching telescope
is folded through the two stirring mirrors
 IMG_4194.jpgIMG_4195.jpgIMG_4197.jpgIMG_4196.jpg 
  287   Thu Dec 7 14:13:15 2023 ShaneUpdateCleanroomcleanroom cleaning and particle count


[Aiden, Shane,
Michael, Luke, Cynthia]


cleaning
cleanroom and particle count
  
  286   Thu Dec 7 12:42:42 2023 AidenUpdateVACVacuum Chamber Baking UpdateAfter leaving the RGA on for a few days the
chamber has settled at 2.01 e-8 torr. I also
have good news that the chamber looks to
 December_06_Ar_Open_Stainless_Steel_Fasteners_Analyzed.pngbake8_231206_SSFasteners_ArO.png 
  285   Mon Dec 4 21:27:53 2023 ShaneUpdateCDSADC-DAC loopback test resultsHere are the test results from today's ADC-DAC
loopback tests. Channels 14 and 15 were the
only ones behaving abnormally. Not sure what
 adc-dac_loopback_testing_results.pdf 
  284   Mon Dec 4 11:19:50 2023 AidenUpdateVACVacuum Chamber Baking Update[Aiden]

Took some RGA data of the chamber
after it has been cooling down. I do not
believe that this data accurately shows the
 bake8_231204_SSFasteners_ArO.pngbake8_231204_SSFasteners_ArC.pngDecember_04_Ar_Open_Stainless_Steel_Fasteners_Analyzed.pngbake8_231204_SSFasteners_ArO.png 
  283   Sat Dec 2 18:10:23 2023 AidenUpdateVACVAC System Heating Update[Aiden]

Turned off the heating tape
today in anticipation to take more RGA data
on Sunday or Monday morning before the meeting.
  
  282   Thu Nov 30 13:58:18 2023 AidenUpdateVACVAC System Heating Update[Aiden]

Came into the lab in the morning
to check on the chamber heating. I decided
to set the PID controllers to 110C rather
  
  281   Thu Nov 30 13:50:32 2023 TylerUpdateLoreWorkbench Assembly Completed[Tyler, Luke, Aiden]



The workbenches
are now completely assembled and put into
their final places. Additionally, the tool
 IMG_7686.jpg 
  280   Wed Nov 29 21:13:32 2023 AidenUpdateVACVAC System Heating UpdateStarted Bake 8 today. Set the PID controllers
to 120 C and will check in the morning for
equilibrium temperatures for the lid and
  
  279   Mon Nov 27 19:34:50 2023 AidenUpdateClean & BakeClean and Bake Batch 20 BaggingBagged and tagged bath 20 which included the
macor hardware and place it inside the clean
room on the table.
  
  278   Mon Nov 27 14:22:30 2023 TylerUpdateLore1129 Assembly Update[Tyler, Michael, Luke, Cynthia]


The
tabletops have been attached to the workbench
frames. Unfortunately, one of the tabletops
 IMG_7669.jpgIMG_7668.jpg 
  277   Thu Nov 23 12:34:44 2023 JonUpdateCDSDB25 signal connections for FROSTI heatersUpdate: I was able to put the
FROSTI power controller on the lab network.
It is connected to the switch in the top
  
  276   Wed Nov 22 15:46:50 2023 ShaneUpdateCDSDB25 signal connections for FROSTI heaters


[Shane,
Jon]

Installed new DC smart switch in electronics
 DB25input_signals.pdfIMG_3137.jpegdc_smart_switch_signal_connections.jpeg 
  275   Tue Nov 21 22:09:44 2023 AidenUpdateGeneralTesting Parts[Aiden, Luis]


Luis and Aiden vented
the chamber today. We closed off the RGA
section and then proceeded to open the the
 8x 
  274   Tue Nov 21 14:47:24 2023 TylerUpdateLore1129 Workbench Assembly Update 1
[Tyler, Shane, Mohak, Cynthia, Luke,
Michael, Luis]


Started assembly of the workbench
 IMG_7569.jpgIMG_7568.jpg 
  273   Mon Nov 20 20:45:16 2023 AidenUpdateVACLeak Test
[Aiden, Luis]

Tested every weld
and flange to find leaks. Only found that
the flange on the turbo pump and reducing
  
  272   Mon Nov 20 20:37:45 2023 AidenUpdateVACClean and Bake Batch 20[Aiden, Luis]
Started to clean and bake the
macor parts for the FROSTI reflector. Per
LIGO documentation cleaned the macor in liquinox
  
ELOG V3.1.3-7933898