ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 3 of 10  Not logged in ELOG logo
ID Datedown Author Type Category Subject Text Attachments
  373   Mon Jun 3 14:14:39 2024 TylerUpdateFLIRInitial CIT FROSTI Analysis [Tyler]


Attached below are the initial
results of the CIT FROSTI testing analysis.
 CIT_FROSTI_Analysis_Group_Meeting-2.pdf 
  372   Mon Jun 3 09:24:48 2024 AidenUpdateVACVacuum Chamber RenderingHere is a new render of the vacuum chamber
that includes the 2.75 tee to place the Argon
leak right next to the RGA. The conical reducer
 VaccumChamberAssembly__Redesign_with_tee.jpgVaccumChamberAssembly__Redesign_with_tee_top.png 
  371   Fri May 31 19:37:47 2024 LukeUpdate Vacuum chamber Disassembly [Luke, Aiden, Jon, Michel, Tyler]

Work
done:
On Tuesday (5/28) we removed the RGA
line with minimal difficulty. On Wednesday
 IMG_1681.jpgIMG_1680.jpgIMG_1680.jpgIMG_1681.jpg 
  369   Thu May 16 15:23:14 2024 ShaneUpdateCleanroomCleanroom cleaning and particle count


[Luis, Michael,
Luke, Shane]


cleaning cleanroom
and particle count
  
  368   Mon May 13 14:53:29 2024 PeterUpdateVLC UpdateVLCVLC Update WEEK 7 attached below  VLC_Update.pdf 
  367   Mon May 13 14:48:27 2024 AidenUpdateVACNew Vacuum Chamber DesignI created a new model for the vacuum chamber
based on the ideas from last week's meeting.

It
should be noted that we can not have the
 VaccumChamberAssembly__Redesign_v5.jpg 
  366   Mon May 13 13:03:41 2024 TylerUpdateFLIRReadout Code Updates[Tyler]


Some changes have been made
to the FLIR readout code to help improve
its functionality:


More accurate
 AcquisitionImage(Jul-18-2023_15_24).jpg.png 
  365   Tue May 7 20:34:31 2024 shaneUpdateCDSfrosti MEDM screen update[Luis, Shane]
Here is the updated MEDM screen,
with new orientation and updated labeling
to reflect the actual positions of the heater
 FROSTIMEDMMay7.2024.png 
  364   Thu May 2 22:43:36 2024 TylerUpdateElectronicsRTD Readout Chassis Redesign[Tyler, Jon]


Today the FROSTI RTD
readout chassis underwent a redesign:



Instead of the original ratiometric
 IMG_9013.jpg 
  363   Mon Apr 22 15:06:33 2024 Cynthia UpdateInterferometer Simulationscavity scan update[Cynthia,Pooyan]
Completed some simulations
injecting 0-10th order modes. Some graphs
will be used for the poster after some further
 LIGO_4_22.pdf 
  362   Wed Apr 17 15:07:04 2024 ShaneUpdateCleanroomCleanroom cleaning and particle count


[Mohak, Luke,
Luis, Shane, Cynthia, Michael, Xuesi]


cleaning
cleanroom and particle count
  
  361   Mon Apr 15 15:25:10 2024 CynthiaUpdateInterferometer Simulationsprogress on simulation so far   LIGO_update_week3_(2).pdf 
  360   Mon Apr 15 11:51:03 2024 PeterUpdateVLC UpdateVLCAn update on the VLC project is attached below:  VLC_Update_April_15_2024.pdf 
  359   Mon Apr 8 14:57:41 2024 Cynthia, PooyanUpdateInterferometer Simulationsperformed cavity scans for O4 O5, and coupled cavity    LIGO_update_week1.pdf 
  358   Mon Apr 8 14:43:29 2024 PooyanUpdateInterferometer SimulationsSIS update single and coupled cavities[Pooyan, Cynthia]

Attached is a brief
recap PDF file. A video file showing separate
HOMs plots for the cavity scan with ETM08
 IFOSim_SIS__update_4_8_24.pdfScreen_Recording_2024-03-31_at_2.46.29_AM.mov 
  357   Sun Apr 7 13:42:51 2024 MichaelUpdateInterferometer SimulationsUpdate on status of gtrace project[Pooyan, Michael]

After meeting and
discussing the current state of our work
with Prof. Fulda a few weeks ago, we have
 Sequential_beam_trace_crab1.pngangle_of_incidence_yaml_example.png 
  356   Wed Mar 27 00:03:57 2024 PooyanUpdateComputersChimay relocation to Physics 1129 [Jon, Pooyan]

 Moved Chimay from
the server rack in Physics 1119 to a new
rack in Physics 1129. It is connected to
 Chima_front.jpgChimay_back.jpg 
  355   Tue Mar 26 13:51:56 2024 TylerUpdateDAQRTD Parameter Calibration Another re-fit, but this time the quadratic
coefficient (beta) is set to 1.003e-6:


     R_0 (ohm)   Alpha
 Screenshot_2024-03-26_at_1.23.27_PM.png 
  354   Mon Mar 25 10:55:33 2024 TylerUpdateDAQRTD Parameter CalibrationRefitted RTD calibration, neglecting quadratic
term:

       R_0
(ohm)   Alpha (1/C)
 RTD_Calib_nobeta.png 
  353   Sun Mar 24 11:50:37 2024 AidenUpdateClean & BakeCal Tech FROSTI PartsBagged the FROSTI legs and feet after the
conclusion of the clean and bake. They are
double bagged and sitting in the flow bench.
  
  352   Sun Mar 24 11:49:27 2024 AidenUpdateGeneralFROSTI RGA ScanTook RGA data 1 day after the conclusion of
Bake 13. Bake 13 ended on Saturday March
23, the RGA data shown was taken on Sunday
 bake13_240324_FROSTI_ArC.pngbake13_240324_FROSTI_ArO.png 
  351   Thu Mar 21 16:56:42 2024 TylerUpdateDAQRTD Parameter Calibration[Jon,Tyler]

 We noticed that the RTD
temperature readings given on the Cymac were
off, and traced the issue to miscalibration
 RTD_Calib-2.pngIMG_8569.jpg 
  350   Tue Mar 19 15:22:27 2024 AidenUpdateClean & BakeFROSTI Legs Clean and Bake[Aiden, Luke]

Cleaned and baked the
Cal Tech FROSTI legs and showed Luke the
procedure on how to clean parts.
  
  349   Tue Mar 19 10:55:30 2024 TylerUpdateFLIRIn-Air Optical TestBelow is an image I took using the FLIR just
before leaving for the LVK meeting. The profile
is roughly what we would expect (annular).
 FroSTI_Thermal_Profile.png 
  348   Fri Mar 15 16:58:55 2024 AidenUpdateVACVacuum Chamber Frosti Testing[Luke, Luis, Aiden]

On Thursday, March
14 - Took preliminary RGA scans of the empty
chamber to compare later on. Vented the chamber
 bake12_240314_Empty_ArC.pngbake12_240314_Empty_ArO.png 
  347   Wed Mar 6 09:57:52 2024 TylerUpdateTCSFROSTI Wiring Upon finishing the FROSTI assembly last
week, we ran into some electrical issues.
An electrical short was found between two
  
  346   Thu Feb 29 17:16:48 2024 ShaneUpdateCDSMEDM screen for FROSTI T/P readoutsHere's the latest draft of the MEDM screen
for the FROSTI temp and power readouts, now
with a button linking to the c1msc file display.
 IMG_6259.jpeg 
  345   Wed Feb 28 17:49:18 2024 TylerUpdateTCSFROSTI Assembly - Days 2-3[Aiden, Jon, Luis, Luke, Michael, Tyler]

FROSTI
assembly was completed today. The RTD and
power wires were terminated at the DB-25
 IMG_0947.pngIMG_0956.pngIMG_0957.pngIMG_0959.png 
  344   Wed Feb 28 12:02:08 2024 TylerUpdateGeneralResistors for Heater Elements UpdatePower         Res (Ohm) RTD Res (Ohm)

Heater
1= 72.8; 80.6

Heater 2= 69.5; 80.8

Heater
3= 70; 83.2

Heater 4= 70.6; 78.7

Heater
  
  343   Tue Feb 27 09:06:29 2024 Cynthia UpdateInterferometer Simulationscavity scan with higher order input laserI performed a few cavity scan with the inputing
laser with a different mode (not pure 00).
For each laser I included a graph for just
 ligoPre_2_27.pdf 
  342   Tue Feb 27 03:26:28 2024 MichaelUpdateInterferometer SimulationsReverse aLIGO Layout Created in GtraceI've created the simulation for reverse aLIGO
layout in gtrace. Attached are the desmos
model and the output dxf file. From here
 reverse_aligo_desmos.JPGreverse_aligo_dxf.JPG 
  341   Mon Feb 26 21:23:27 2024 JonUpdateTCSFROSTI Assembly - Day 1[Jon, Tyler, Luis, Luke, Mohak, Cynthia, Michael,
Aiden]
FROSTI assembly began today. After
a final set of RGA scans were taken, the
 7x 
  340   Mon Feb 26 15:15:39 2024 AidenUpdateGeneralVacuum Chamber Baking UpdateStarted Bake 12 on Wednesday Feb. 21 and turned
the bake off on Saturday Feb. 24. This was
a normal low temp bake with the PID controllers
  
  339   Sat Feb 24 08:53:38 2024 JonInfrastructureComputersMatlab upgraded to 2023b on ChimayI upgraded Matlab on chimay to the latest
stable release, 2023b. From some quick tests,
it appears to be in working order. Let me
  
  338   Fri Feb 23 18:03:27 2024 TylerUpdateFLIROptical Test Setup in Cleanroom[Tyler, Xuesi]

The FLIR and test mass
stand-in have been transferred into the cleanroom.
A software test will be run as soon as we
 IMG_0941.png 
  337   Fri Feb 23 15:01:48 2024 ShaneUpdateCDSLatest draft of MEDM screen for FROSTI readoutsHere's the latest draft of the MEDM screen
for the FrOSTI temp and power readouts. Also,
debugged the text readout boxes so they're
 IMG_6128.jpg23.jpg 
  335   Thu Feb 22 21:48:16 2024 JonUpdateVACVacuum vent for RGA testing of reflector[Jon, Tyler, Luke, Aiden]
Summary
Following
Wednesday's cleanroom cleaning [333],
we proceeded to vent the vacuum chamber,
 IMG_0938.pngIMG_0939.png 
  334   Wed Feb 21 23:15:07 2024 MichaelUpdateInterferometer SimulationsLong Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in BeamsplitterI have created the long shoelaces 1 layout
for cosmic explorer using gtrace, a slight
modification from the shoelaces 1 layout
 long_shoelaces1_desmos.JPGAR_side_with_reflection.PNGAR_side_without_reflection.PNG 
  333   Wed Feb 21 11:58:30 2024 ShaneUpdateCleanroomcleanroom cleaning and particle count


[Luke, Shane,
Tyler]


cleaning cleanroom and
particle count
  
  332   Tue Feb 20 18:08:24 2024 AidenUpdateGeneralDegassing the RGAI took an RGA measurement before and after
degassing the RGA. Both data was taken with
the Argon open. The pressure before taking
 bake11_240220_Elements_postdegas_ArO.pngbake11_240220_Elements_predegas_ArO.png 
  331   Tue Feb 20 11:31:49 2024 TylerUpdateCleanroomGarment Cabinet Door Replacement[Luis, Luke, Pooyan, Tyler]


The replacement
door for the HEPA garment cabinet arrived
last week, and was installed on Thursday.
 image_67190529.JPGimage_67177473.JPG 
  330   Tue Feb 20 08:01:30 2024 JonInfrastructureGeneralPower and network equipment installed in 1129 rack[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On
Thursday we installed the power conditioning/distribution
equipment and networking equipment in the
 IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg 
  329   Mon Feb 19 14:40:21 2024 ShaneUpdateCDSMEDM screen for FROSTI temp readoutsHere's the latest draft of the MEDM screen
for the FROSTI heating elements' temperature
readouts. Note that the MEDM screen isn't
 IMG_6094.jpegIMG_6092.jpeg 
  328   Mon Feb 19 14:17:50 2024 AidenUpdateVACHeater Element RGA ScanThree days after the completion of Bake 11,
the Heater elements RGA scan looks much cleaner.
The HC level is back down to 33 e-10 torrl/s
 bake11_240219_Elements_ArO.png 
  327   Fri Feb 16 18:37:28 2024 JonUpdateVACBake ended 6:23 pmI ended the bake of the UHV system (that
began on Monday) at 6:23 pm today by switching
OFF both PID controllers. The heaters elements
  
  326   Tue Feb 13 13:02:41 2024 PooyanUpdateInterferometer SimulationsCacity sacn of Fabry-Perot Created a simple model of Fabry-Perot cavity
in SIS, and did a cavity scan. Total power
in the cavity, 00 mode, and HOMs is measured.
 IFOSim_update_2_13_24.pdf 
  325   Tue Feb 13 12:34:04 2024 AidenUpdateVACVAC Heating System UpdateHere is an overlay with for all the heating
steps done with the heater elements.
 bake10_240118_Elements_ArO.png 
  324   Tue Feb 13 12:26:23 2024 TylerUpdateInterferometer SimulationsBS Code Update I reproduced Cao's CE beamsplitter code
(see below for example plots). I received
the current info on the beamsplitter parameters
 thickness1.pdfbs_opd_homloss_h6cm_w2cm.pdf 
  323   Tue Feb 13 11:54:45 2024 TylerConfigurationFLIRIn-Air Optical Test Configuration
Below is the proposed schematic for FROSTI
optical testing, chosen so enough space is
allotted for prototype assembly.
 In-air_optical_test_sketch.png 
  322   Tue Feb 13 04:05:32 2024 MichaelUpdateInterferometer SimulationsShoelaces 1 Layout Simulated in GTraceI've worked on and have completed a first
simulation of Cosmic Explorer's Shoelaces
1 layout. This is based off of Pooyan's original
 shoelaces1_dxf.JPGshoelaces1_desmos.JPG 
ELOG V3.1.3-7933898